Pressure vessel manufacturers

Document review for pressure vessel manufacturers: tender specifications, ITPs and record books

For bid engineers and quality engineers at pressure vessel, heat exchanger and boiler fabricators who answer requisitions, build to ASME Section VIII or the Pressure Equipment Directive, and hand over a manufacturing record book.

By Ademola Afolabi, Founder, New Odyssey Ltd · Last reviewed:

The short answer

Pressure vessel manufacturers answer a tender by checking the requisition, vessel datasheet, project and owner specifications and the code of construction against what the shop can build, then listing every deviation. After award they produce the ITP, welding records, NDE reports and the record book. OdysseyGPT checks those documents against the customer's requirements and quotes its sources.

Key Takeaways

  • A vessel tender combines a requisition, a datasheet, project and owner specifications and a code of construction.
  • Deviations often come from materials, heat treatment, NDE extent, certificate type and inspection points.
  • After award, most of the work is documents: ITP, welding records, MTRs, NDE reports, test records and the record book.
  • OdysseyGPT reads documents and cites its findings. It does no design calculation and replaces no inspector.

Free sample: a certificate check report. Send up to 20 material certificates and the PO. Get a certificate check report. Get the free result

How do pressure vessel fabricators answer a tender?

A vessel enquiry usually arrives as a package. The fabricator reads all of it, checks each requirement against the design it will offer and the way its shop works, and returns a compliance statement and a technical deviation list.

What is usually in a pressure vessel enquiry package
DocumentWhat it tells youWhat to check
Material requisitionScope of supply, quantities, the list of attached documents and their revisionsEvery listed document is in the package at the stated revision
Vessel datasheetDesign pressure and temperature, materials, corrosion allowance, nozzles, heat treatment, NDE and test requirementsIt agrees with the specifications; where it does not, which document governs
Project vessel specificationThe purchaser's rules on design, fabrication, inspection and documentsEach requirement that goes beyond the code of construction
Owner or operator standardsCompany-wide rules that sit above the project specificationEdition, and any conflict with the project documents
Code of constructionThe design and fabrication rules, and the stamp or marking requiredCode, edition, and that your certificate or conformity route covers it
Quality and documentation requirementsInspection points, third-party inspection, the document list and record book indexHold points, certificate types and the list of documents to submit

The order of precedence matters. Many packages say which document wins when two disagree. If the package does not, raise it as a clarification before you price.

Which codes and standards come up in pressure vessel tenders?

Codes and standards commonly called up (own summary; use the edition your contract names)
Code or standardWhat it coversTypical deviation source
ASME BPVC Section VIII, Division 1Design, fabrication, inspection, testing and certification of pressure vessels above 15 psigEdition, stamp required, owner additions beyond the code
ASME BPVC Section VIII, Division 2Alternative rules, with stricter requirements on materials, design and NDE in return for higher design stressesDivision offered differs from the one the datasheet names
Pressure Equipment Directive 2014/68/EUEU law for pressure equipment above 0.5 bar: essential safety requirements, categories and conformity assessmentCategory, module, notified body and who holds the CE marking duty
EN 13445European standard for unfired pressure vessels, used to show conformity with the directiveCode offered (EN 13445 or ASME) against the one specified
ASME BPVC Section IXQualification of welding procedures and weldersExtra essential variables or tests the owner adds to the code
ASME BPVC Section VMethods for non-destructive examination, called up by the construction codeMethod, technique and personnel qualification required
ASME BPVC Section IIMaterial specifications (Parts A, B and C) and material properties (Part D)Material grade, supplementary requirements, permitted substitutes
TEMA StandardsMechanical design and construction of shell-and-tube heat exchangersTEMA class or type offered differs from the datasheet
NACE MR0175 / ISO 15156Materials for H2S-containing environments in oil and gas productionHardness limits, heat treatment and certificate statements for sour service
EN 10204Types of inspection document for metallic products3.1 offered where 3.2 is required

If you build exchangers, see the page for heat exchanger manufacturers, which covers TEMA, API 660 and API 661. If you also fabricate pipework, see pipe spool fabricators and ASME B31.3.

What goes in a pressure vessel deviation list?

Each row names the clause, the requirement, what you offer, the status, a justification and the cost or schedule effect of withdrawing the deviation. For vessels, rows often come from the points below.

  • Code, division and edition, and the stamp or marking the customer wants.
  • Material grade, supplementary requirements, impact testing and permitted equivalents.
  • Corrosion allowance, cladding or weld overlay.
  • Post-weld heat treatment required by the customer where the code does not require it.
  • NDE extent and method beyond the code, and the acceptance standard.
  • Material certificate type, positive material identification and third-party inspection.
  • Hold and witness points, and notice periods for the customer's inspector.
  • Nozzle loads, lifting and transport conditions the design must cover.
  • The document list: what is submitted for approval and when.
  • Painting, preservation, packing and spares.

Start from the free deviation list template. The deviations the customer accepts at bid stage become the requirements you verify and record after award.

Which documents does a fabricator produce after award?

Typical pressure vessel fabrication documentation
DocumentWhat it isWho checks it
Inspection and test plan (ITP)Each manufacturing stage with its procedure, acceptance criteria, record and inspection pointCustomer, third-party inspector, Authorized Inspector or notified body
WPS, PQR and WPQWelding procedures, the test records that qualify them and the welder qualificationsCustomer's welding engineer and the inspector
Weld map and weld logEvery weld with its number, procedure, welder and NDEQuality engineer and inspector
Material test reports (MTRs)Chemistry, mechanical results and heat number for each pressure partQuality engineer at receipt, then the inspector
NDE reportsRT, UT, MT and PT results for each weld examinedNDE Level III, customer and inspector
PWHT chartsThe time and temperature record for heat treatmentWelding engineer and inspector
Pressure test recordTest pressure, duration, gauges used and the resultWitnessed by the inspector, often by the customer
Manufacturer's data reportThe manufacturer's certified statement of how the vessel was built, signed by the inspector under ASMEAuthorized Inspector; filed in the record book
Nameplate recordA rubbing or photograph of the stamped nameplateInspector and customer
Manufacturing record book (MRB)The indexed set of all the above, to the customer's indexCustomer document control and quality

Free starting points: the pressure vessel ITP template, the weld map and weld log template and the MRB index template.

How does OdysseyGPT help?

OdysseyGPT reads documents and checks them against the customer's requirements. Every finding carries a quote from the page, sheet or cell it came from, so an engineer can confirm or reject it quickly. Your engineers decide every item.

Vessel documents and the tool that checks them
StageDocumentsToolWhat it reports
TenderRequisition, vessel specification, owner standards, your standard specification and datasheetDocument ReviewA compliance matrix and a deviations and clarifications list, each row quoting both sides
TenderThe customer specification and its supporting documentsCustomer Specification Review (beta)A register of every requirement, with ambiguous and missing items flagged
TenderCustomer datasheet and your offered datasheetDatasheet Comparison (beta)Field-by-field differences with the cell or row each came from
OrderRequirements, offer and clarification repliesDeviation Register (beta)One register of deviations with consequences and a risk level
OrderThe customer's document requirements listVDRL/MDR Tracker (beta)Every contractual document with due date, revision and status
ManufacturingProposed ITP and the customer's quality specificationITP Validator (beta)Missing stages, downgraded hold or witness points, missing acceptance criteria or records
ManufacturingMTRs, purchase requirements and bill of materialsMaterial Certificate Review (beta)Grade, chemistry, mechanical, heat treatment and certificate type conflicts
ManufacturingBill of materials, certificates, heat list and weld mapMaterial Traceability Check (beta)Heat numbers with no certificate, certificates with no part, conflicting grades
ManufacturingWPS, PQR, welder qualifications and the weld mapWelding Qualification Review (beta)Welds the records do not cover: thickness, position, filler, welder continuity
InspectionWeld map, ITP and NDE reportsNDE Coverage Review (beta)Missing reports, wrong method, short coverage, repairs not re-examined
InspectionTest reports and calibration certificatesCalibration Validity Check (beta)Instruments out of calibration on the day they were used
HandoverThe customer's MRB instructions and your document folderMRB Readiness Check (beta)Documents missing, at the wrong revision, incomplete or awaiting approval
HandoverThe record book itselfMRB Traceability Verification (beta)Broken links between tag, heat, certificate, weld, welder, test and instrument

The tools read PDF, Word, Excel and CSV files. A weld map must be readable as a list or table of welds, not only as a drawing.

Example result (invented)

Invented example: documents for a carbon steel separator, tag V-2101, checked against the customer's quality specification. No customer data; every number, tag and document is made up.
IDFindingWhy it was raisedCategorySeverityConfidence
F-ITP-01PWHT is not a hold point in the proposed ITPThe quality specification makes post-weld heat treatment a hold point with the chart retained. The ITP lists it as a review of records.Downgraded interventionCriticalHigh
F-ITP-02Hydrostatic test step gives no acceptance criteriaThe ITP names the witnessed test but cites no procedure or acceptance criteria.Acceptance criteriaMediumMedium
F-WLD-01WPS-114 is not supported by a PQR at 52 mmPQR-088 qualifies a thickness range up to 40 mm. Weld L2 on the weld map is 52 mm.Unsupported WPSCriticalHigh
F-WLD-02Welder W-17 was not qualified on the date weld C3 was madeThe continuity record lapsed on 2026-05-31. The weld log dates C3 on 2026-06-18.ContinuityCriticalHigh
F-NDE-01Nozzle weld N4 has no ultrasonic reportThe ITP requires 100% UT of nozzle-to-shell welds. No report references N4.Missing reportCriticalHigh
F-NDE-02Repair R1 on seam L1 has no later radiographA repair is recorded on RT-0231. No later report closes it.Unclosed repairMediumLow
F-MTR-01Shell plate heat 77140 supplied with an EN 10204 3.1 certificateThe purchase requirement for pressure parts is EN 10204 3.2.Certificate typeHighHigh
F-MTR-02Head plate heat 77152 impact test temperature not reportedThe material specification requires impact testing at −46 °C. The certificate gives energy values with no test temperature.Missing propertyHighMedium
F-CAL-01Pressure gauge PG-07 calibration expired before the hydrostatic testThe certificate expired on 2026-08-12. The test record is dated 2026-08-20.Expired at useCriticalHigh
F-MRB-01Manufacturer's data report is in the folder unsignedThe customer's index requires the signed data report. The copy filed has no inspector signature.Incomplete documentHighMedium

Each finding also carries its source document, page and quoted evidence. A quality engineer accepts, edits or rejects each one.

Where OdysseyGPT falls short

  • It does no design calculation: no thickness, nozzle reinforcement, MDMT, fatigue or thermal rating work. Use vessel design software and a qualified designer.
  • It does not replace an Authorized Inspector, a notified body or a third-party inspector, and it does not certify anything.
  • It does not interpret drawings such as general arrangements, weld details or isometrics. A weld map must be a readable list or table.
  • It does not write or qualify WPS and PQR records. It checks whether the records you have cover the welds you made.
  • It does not hold the text of paid codes. It checks documents against the requirements in the files you give it, so code rules reach it through your specifications, ITP and procedures.
  • Run it on a past job first, so you can compare its findings with what you already know.
  • Only Document Review is generally available. The other tools named here are in beta, and we onboard each team ourselves.

Try it on your own documents

Free sample: a certificate check report

Send up to 20 material certificates and the PO. Get a certificate check report.

Get the free result

Buyer questions

20 questions bid engineers, proposal engineers and buyers ask. Last reviewed:

What is in a pressure vessel enquiry package?

Usually a material requisition, a vessel datasheet, a project vessel specification, the owner's standards, the code of construction and a set of quality and documentation requirements. The requisition lists the attached documents and their revisions. Check first that every listed document is in the package, then check which document governs when two disagree.

What documentation is needed for pressure vessel fabrication?

Typically an approved inspection and test plan, welding procedures with their qualification records, welder qualifications, a weld map, material test reports, NDE reports, heat treatment charts, a pressure test record, the manufacturer's data report or declaration of conformity, and a nameplate record. They are handed over as an indexed manufacturing record book.

Which codes do pressure vessel tenders usually call up?

Most name a code of construction: ASME Section VIII Division 1 or 2, or EN 13445 under the Pressure Equipment Directive. They add ASME Section IX for welding, Section V for NDE and Section II for materials, with TEMA for exchangers and NACE MR0175 for sour service. Owner specifications sit on top.

Should we offer ASME Section VIII Division 1 or Division 2?

Offer the division the datasheet names. Division 2 has more rigorous requirements on materials, design and NDE and allows higher design stresses, which can save material on large or thick vessels. If you want to offer a different division from the one specified, raise it as a deviation at bid stage with the reason and the effect on price.

What goes in a pressure vessel deviation list?

One row for each requirement you do not meet in full. Each row gives the clause, the requirement, what you offer, a justification and the cost of withdrawing the deviation. For vessels, rows often cover materials, heat treatment, NDE extent, certificate type, inspection points and documents. See the technical deviation list guide.

What should a pressure vessel ITP contain?

One line for each manufacturing and inspection stage, from material receipt to final documentation. Each line gives the procedure, the acceptance criteria, the record produced and the inspection point for each party: manufacturer, customer, third-party inspector and Authorized Inspector or notified body. Start from the pressure vessel ITP template.

What is the difference between a hold point and a witness point?

At a hold point, work must not go past that stage until the named party has inspected it or released it in writing. At a witness point, the party is notified and may attend, but work can continue if they do not. Customers often turn witness points into hold points in their quality specification, so compare your ITP with it line by line.

How do we check an ITP against the customer's quality specification?

List every inspection, test and record the specification asks for, then find each one in the ITP and compare the inspection point, acceptance criteria and record. The ITP Validator (beta) does this comparison and reports missing stages and downgraded hold or witness points, with a quote for each. A quality engineer decides each finding.

Who is the Authorized Inspector?

An inspector employed by an Authorized Inspection Agency and commissioned by the National Board. A manufacturer that holds an ASME certificate must have an agreement with such an agency. The inspector is independent of the manufacturer, verifies that the code's requirements are met and signs the data report. The customer's own inspector is a separate party.

What does it mean when a tender asks for a U stamp?

It asks for a vessel built to ASME Section VIII Division 1 by a manufacturer that holds an ASME certificate of authorization, with the Certification Mark and U designator on the nameplate. Check that your certificate is current and covers your shop location. See the glossary entry for the ASME U stamp.

What is a manufacturer's data report?

The ASME form on which the manufacturer records how a stamped vessel was built: materials, design conditions, heat treatment, examination and pressure test. The manufacturer and the Authorized Inspector both sign it. Customers usually want the signed report in the record book. See manufacturer's data report.

Who decides the PED category of a vessel?

The manufacturer. The category comes from the fluid, its state and group, the maximum allowable pressure and the volume, using the charts in the directive. Customers often state a category on the datasheet. Check it against your own classification, because the manufacturer is legally responsible. See the Pressure Equipment Directive overview.

Can a vessel designed to ASME Section VIII be CE marked?

Yes, but ASME Section VIII is not a harmonised standard, so it gives no presumption of conformity. The manufacturer must show how each essential safety requirement of the directive is met, including the material and welding approval requirements, with a notified body where the category requires one. Allow for this in price and schedule.

Do pressure parts need EN 10204 3.1 or 3.2 certificates?

It depends on the purchase order and, for CE-marked equipment, on what you agree with the notified body. Many owners ask for 3.2 on pressure parts. The type must be ordered with the material; it cannot be added afterwards. See EN 10204 3.1 vs 3.2 for who signs each type.

How do we check that WPS and PQR records cover every weld?

Take each weld on the weld map and compare its process, material, thickness, position and filler with the ranges the WPS and its PQRs qualify. Then check the welder was qualified on the day. The Welding Qualification Review (beta) does this from your records and reports each weld they do not cover.

How do we check that NDE reports cover every weld that needs examination?

List the method and extent required for each weld, then match every report to its weld and check that repairs were examined again. The NDE Coverage Review (beta) reads the weld map, ITP and reports and flags missing reports, wrong methods, short coverage and unclosed repairs. It reads reports, not films or scans.

What should a PWHT record show?

The item and welds treated, the procedure used, the thermocouple locations, and a chart of temperature against time covering heating, holding and cooling. The chart should be signed and traceable to a calibrated recorder. Customers often make heat treatment a hold point and ask for the chart in the record book.

Does OdysseyGPT do pressure vessel design calculations?

No. It does not calculate thickness, nozzle reinforcement, minimum design metal temperature or anything else, and it does not check calculations. It reads documents and checks them against the customer's written requirements, with a quote for every finding. Design stays with your design software and qualified engineers.

Does OdysseyGPT replace the Authorized Inspector or notified body?

No. Code and legal inspection duties stay with the Authorized Inspector, notified body or approved body, and contract inspection stays with the customer's inspector. OdysseyGPT helps your own team find gaps in the documents before those parties see them. It certifies nothing, and your engineers decide every finding.

Which OdysseyGPT tools can a vessel fabricator use today?

Document Review is generally available and covers the tender check: the customer's package against your own documents. The tools for ITPs, material certificates, welding records, NDE and record books, such as ITP Validator (beta) and MRB Readiness Check (beta), are in beta. You request access and we onboard each team ourselves.

Frequently asked questions

What documents are needed for pressure vessel fabrication?

Typically an approved ITP, welding procedures with their qualification records, welder qualifications, a weld map, material test reports, NDE reports, heat treatment charts, the pressure test record, the manufacturer's data report or declaration of conformity, a nameplate record and the indexed record book.

Does OdysseyGPT do pressure vessel design calculations?

No. It reads documents and checks them against the customer's written requirements, quoting its sources. Design calculations stay with your design software and engineers.

Can OdysseyGPT replace the Authorized Inspector or notified body?

No. Code and legal inspection duties stay with the Authorized Inspector or notified body. OdysseyGPT helps your own team find document gaps before those parties review the work.

Who uses it at a vessel fabricator?

Bid and proposal engineers at tender stage. Quality engineers, welding coordinators, NDE coordinators and document controllers after award.

References

BPVC Section VIII, Division 1: Rules for Construction of Pressure Vessels

ASME

Paid code. Scope summary from the public product page.

Visit source

Boiler and Pressure Vessel Certification

ASME

Visit source

Pressure Equipment Directive 2014/68/EU

European Commission

Visit source

Directive 2014/68/EU, Annex I: essential safety requirements

legislation.gov.uk

Visit source

TEMA Standards

Tubular Exchanger Manufacturers Association

Paid standard.

Visit source

Related Pages

Module

Manufacturing QA

The module hub: its tools, what they read and the free result.

Industry

Steel fabricators

How structural steel and skid fabricators answer enquiries.

Standards

AWS D1.1 structural welding code

What the code covers and what to check in a fabrication enquiry.

Glossary

TEMA standards

The shell-and-tube heat exchanger standards and their classes.

Glossary

Procedure qualification record (PQR)

The tested evidence behind a welding procedure specification.

Glossary

Positive material identification (PMI)

Checking the alloy of the actual part.

Product

Document Review

Check a customer's specification package against your documents, in both directions.

Product

ITP Validator (beta)

Check a proposed ITP against the customer's quality specification.

Product

Welding Qualification Review (beta)

WPS, PQR and welder records checked against every weld.

Product

NDE Coverage Review (beta)

NDE reports matched to each weld on the weld map.

Standards

ASME Section VIII

Divisions 1, 2 and 3, the U stamp and a tender checklist.

Standards

Pressure Equipment Directive

Categories, modules, CE marking and the UK position.

Industry

Heat exchanger manufacturers

How exchanger fabricators answer TEMA, API 660 and API 661 tenders.

Template

Pressure vessel ITP template

A free inspection and test plan to adapt.

Comparison

Pressure vessel fabrication software

Design, shop documentation and document checking tools, sorted by job.

Guide

Manufacturing record book guide

What goes in the book and how to check it before handover.

Pillar guide

Technical deviation list guide

The deviations you agree at bid stage are the ones you verify and record later.