What is the Pressure Equipment Directive?
Directive 2014/68/EU replaced the earlier directive 97/23/EC and has applied in full since 20 July 2016. It covers vessels, piping, safety accessories and pressure accessories, and assemblies of them, with a maximum allowable pressure (PS) above 0.5 bar. Its aim is that equipment meeting it can be sold anywhere in the EU and is safe.
The directive is law, not a design code. It sets essential safety requirements in its Annex I and leaves the manufacturer to meet them. The manufacturer is the party legally responsible for conformity, even when a customer supplies the design basis.
The directive lists exclusions. Among them are simple pressure vessels (which have their own directive), cross-country pipelines, equipment covered by the transport of dangerous goods rules, items made for nuclear use, and machinery such as pumps, compressors and turbines where pressure is not the main design factor. Read the list in Article 1 before assuming an item is in or out.
Categories I to IV and sound engineering practice
Each item of pressure equipment is classified by rising level of hazard. The classification uses the type of equipment, whether the fluid is a gas or a liquid, the fluid group (group 1 for hazardous fluids, group 2 for the rest), the maximum allowable pressure, and the volume for vessels or the nominal size for piping. The directive's Annex II gives a set of charts that turn those inputs into a category from I to IV. Use the charts in the directive itself; this page does not reproduce them.
Equipment below the lowest chart limits falls under Article 4(3). It must be designed and made to the sound engineering practice of a Member State, must carry the manufacturer's identification and come with instructions, and must not carry the CE marking under this directive.
Conformity assessment modules
The category sets which conformity assessment procedures, called modules, the manufacturer may use. A manufacturer may also choose a procedure from a higher category where one is available.
| Category | Modules available | In outline |
|---|---|---|
| I | A | Internal production control. The manufacturer assesses conformity without a notified body. |
| II | A2, D1 or E1 | The manufacturer's own control with supervised checks by a notified body, or a quality assurance system approved by one. |
| III | B (design type) with D or F; B (production type) with E or C2; or H | Type examination by a notified body, joined with production quality assurance or product verification; or full quality assurance. |
| IV | B (production type) with D or F; G; or H1 | Type examination with quality assurance or product verification; unit verification of each item; or full quality assurance with design examination. |
For one-off vessels, fabricators often use module G, where the notified body examines the design and each item, or a quality assurance route if they hold the approval. The route changes cost and schedule, so name it in the offer.
Notified bodies and CE marking
A notified body is an organisation a Member State has designated to carry out conformity assessment under the directive. The Commission lists them in its NANDO database. For categories II, III and IV, a notified body or a recognised third-party organisation must also approve the procedures and personnel for permanent joints, such as welding. For categories III and IV, non-destructive testing personnel must be approved by a recognised third-party organisation.
When the chosen module is complete, the manufacturer draws up an EU declaration of conformity and fixes the CE marking. Where a notified body is involved in the production phase, its identification number goes with the marking. The equipment must also carry information such as the year of manufacture, its identification and its essential allowable limits, and it must come with operating instructions.
Harmonised standards such as EN 13445
A harmonised standard is a European standard whose reference the Commission has published in the Official Journal for the directive. Equipment built to one is presumed to meet the essential safety requirements that standard covers. EN 13445 for unfired pressure vessels is the best known for vessel fabricators, with EN 13480 for metallic industrial piping and EN 12952 and EN 12953 for boilers. The list changes, so check which parts and dates are currently cited before relying on the presumption.
Harmonised standards are voluntary. A manufacturer may use another code, such as ASME Section VIII, but then has no presumption of conformity and must show how each essential safety requirement is met. In a tender this is a common source of deviations: the customer names one code and the fabricator would rather build to another.
Material certificates under PED Annex I
Annex I, section 4.3, requires the equipment manufacturer to obtain documentation from the material manufacturer confirming that every material meets its specification. For the main pressure-bearing parts of equipment in categories II, III and IV, that documentation must be a certificate of specific product control. Where the material manufacturer has a suitable quality assurance system, certified by a competent body established in the EU and specifically assessed for materials, its own certificates are presumed to meet the requirement.
The Commission's PED guideline G-05 relates these words to EN 10204 inspection documents. It also notes that a higher-level document is always acceptable, and that material bought from a stockist must come with the material manufacturer's own inspection documents. In practice, customers ask for type 3.1 or 3.2 certificates for pressure parts. For the difference, see EN 10204 3.1 vs 3.2. Agree the certificate type with your notified body and write it into the material purchase order, because it cannot be added after the material is made.
Annex I also sets out how a material can be accepted: by complying with a harmonised standard, through a European approval for materials, or through a particular material appraisal. For categories III and IV the notified body assesses the particular material appraisal. This matters when a vessel is designed to an American material specification and sold into the EU.
The UK position: PE(S)R 2016 and UKCA
Great Britain has its own law, the Pressure Equipment (Safety) Regulations 2016, known as PE(S)R. It follows the same structure as the directive: the 0.5 bar threshold, categories, modules and sound engineering practice. UK approved bodies take the place of notified bodies, designated standards take the place of harmonised standards, and the UKCA marking takes the place of the CE marking.
- CE marking is still accepted in Great Britain. Government guidance states that recognition of CE-marked pressure equipment was continued indefinitely by regulations that came into force on 1 October 2024. A manufacturer may use either CE or UKCA marking for the Great Britain market.
- Until 31 December 2027 the UKCA marking may be put on a label or an accompanying document instead of on the equipment.
- Northern Ireland continues to follow the EU directive. Equipment for Northern Ireland needs the CE marking, with the UKNI indication added where a UK body carried out the assessment.
This reflects the gov.uk guidance as last updated on 24 March 2025, read on 15 Nov 2026. Rules of this kind change. Check the current guidance before you commit to a marking route in an offer. This page is an overview, not legal advice.
What to check in a tender against the PED
| Check | Why it matters |
|---|---|
| Where the equipment will be installed: EU, Great Britain, Northern Ireland or elsewhere | It decides which law and which marking apply |
| Fluid, fluid group, state, maximum allowable pressure and volume or nominal size | These set the category. Missing data means you cannot classify the item |
| Who is the manufacturer in the legal sense, especially for assemblies and skids | The manufacturer signs the declaration of conformity and holds the technical file |
| The category the customer states, checked against your own classification | Customers sometimes state a category that the data does not support |
| The module the customer requires or you intend to use | Unit verification and quality assurance routes cost and schedule differently |
| Whether the customer names a notified body, or leaves the choice to you | A named body you do not normally use adds time and cost |
| Design code: EN 13445, another harmonised standard, or a code such as ASME | Without a harmonised standard you must show conformity requirement by requirement |
| Material specifications and how each is accepted: harmonised standard, European approval or particular material appraisal | Appraisals for non-European materials take time and may involve the notified body |
| Material certificate type for main pressure-bearing parts | It must be ordered with the material |
| Approval of welding procedures, welders and NDE personnel by a notified body or recognised third party | Existing qualifications may not carry the approval the category requires |
| Language of the operating instructions and declaration of conformity | Translations are part of the scope |
| Whether the vessel also needs an ASME stamp | Dual certification means two inspection regimes on one vessel |
| Customer requirements beyond the law: extra NDE, hold points, documents | These are contract requirements and belong on the deviation list if you cannot meet them |
OdysseyGPT's Document Review checks a customer's specification package against your own documents and drafts the compliance matrix and deviation list, each row quoting its source. After the order, the Material Certificate Review (beta) checks each certificate against the purchase requirements, including the EN 10204 type, and the ITP Validator (beta) checks the inspection and test plan against the customer's quality requirements.
What OdysseyGPT does not do
It does not classify equipment, choose a module or assess conformity, and it does not replace a notified body or approved body. It checks documents against the written requirements you give it and quotes the source of every finding.