AI for pump manufacturers: check every tender requirement against your pump datasheet

For the bid engineers, proposal engineers and project managers at pump makers who answer API 610 and owner-specification tenders.

By Ademola Afolabi, Founder, New Odyssey Ltd · Last reviewed:

The short answer

Pump manufacturers answer a tender by checking the customer's pump specification, datasheets and called-up standards against their own pump and seal design. Those standards include API 610 and API 682. Then they list every deviation. OdysseyGPT drafts the compliance matrix and deviation list with a source quote for every requirement.

Key Takeaways

  • Pump tenders combine a pump standard, a seal standard, owner specifications and a datasheet per tag.
  • Deviations often come from seal plans, materials, performance and test requirements.
  • Every deviation row needs a justification and a cost of withdrawal.
  • Your engineers set every status; OdysseyGPT drafts the rows with citations.

How do pump manufacturers answer tender specifications?

An engineered pump enquiry usually includes a material requisition and a pump datasheet for each tag. It also has a project pump specification, the owner's standards, and the industry standards they call up. The manufacturer checks each line against the offered pump, seal, baseplate and driver. Then they return a compliance statement and a technical deviation list.

Evaluators look closely at performance and mechanical data. Typical technical bid evaluation checks for pumps include NPSH margin, performance curves and vibration limits (whatispiping). See technical bid evaluation for what the EPC side checks.

Who answers RFQs at a pump maker?

Bid engineers and proposal engineers usually own the technical offer. Application engineers select the hydraulics and seal arrangement. At smaller pump makers, a project manager often answers the RFQ. They get performance data from engineering, and test and certificate answers from quality staff.

What goes in a pump deviation list?

The example below uses an invented specification, PS-PMP-001, for an overhung process pump. Every value is illustrative.

Invented example: deviation rows against PS-PMP-001 Rev 1
Spec clauseRequirementOfferedStatusDeviation / clarificationJustificationCost of withdrawal
PS-PMP-001 §2.1Pump designed to API 610API 610 overhung pumpCompliesNoneDatasheet line 3Not applicable
PS-PMP-001 §4.2Dual seal to API 682, plan 53BAPI 682 dual seal, plan 53ADeviationPlan 53A offered instead of 53BBarrier pressure is within the plan 53A range for this dutyPlan 53B: +6%, +3 weeks
PS-PMP-001 §5.4Witnessed performance testNon-witnessed performance testDeviationTest not witnessedCertified test report suppliedWitnessed test: +2%, inspector fees by buyer
PS-PMP-001 §6.1Casing material per owner material table12% chrome casingClarificationOwner table lists two optionsBuyer to confirm which option governsNo cost

API 682 plans 53A and 53B both pressurise a barrier fluid between dual seals. Plan 53B uses a bladder accumulator (Swagelok). Start from the free deviation list template.

Which standards come up in pump tenders?

StandardWhat it coversTypical deviation source
API 610Centrifugal pumps for petroleum, petrochemical and natural gas industries, including overhung, between-bearings and vertically suspended types (whatispiping)Pump type, materials, testing, vibration and data requirements
API 682Shaft sealing systems for centrifugal and rotary pumps, including seal plansSeal arrangement and plan offered vs specified
NACE MR0175 / ISO 15156Materials for H2S-containing environments in oil and gas production (Project Materials)Sour-service material and hardness requirements
EN 10204Types of inspection document for metallic products3.1 offered where 3.2 is required
Owner standardsOperator requirements on top of the industry standardsApproved vendors, materials, witness points, documentation

Use the datasheet vs specification checklist to cover the pump-specific checks, and the inspection and test plan to price witness points.

How does OdysseyGPT help?

OdysseyGPT reads the whole specification package for your pump tender. That means the project and technical specifications, the material requisition, the inspection and test plan, the datasheets and the standards they call up. It checks each customer requirement against your own datasheets, standard specifications and test procedures. Each requirement gets a status: complies, deviates, clarification, not addressed, document requested, not applicable or out of scope. Each status comes with a quote from the source document and page.

It exports an editable compliance matrix and a deviations & clarifications list. It reads PDF, Word, Excel and CSV files. It does not read engineering drawings such as general arrangements or P&IDs. It does not send anything to the customer. Your engineers decide every open item, the justification and the cost of withdrawal, and they own what goes out. See OdysseyGPT for manufacturing.

OdysseyGPT Managed: from $999/month

A managed subscription with onboarding included. See pricing or request a demo built around one of your own past tenders.

Buyer questions

20 questions bid engineers, proposal engineers and buyers ask. Last reviewed:

What is usually in an engineered pump tender package?

A material requisition, a datasheet for each pump tag, a project pump specification and the owner's standards. Most packages also include an inspection and test plan, a vendor data requirements list and commercial terms. Some add seal, motor, painting and noise specifications. Read every document before you price, because pump requirements are often split across several of them.

How do pump makers handle a tender with many pump tags?

Treat each tag as its own check, even when pumps look the same. Liquids, operating points, materials and seal plans often differ between tags. Group tags only where the datasheets truly match. Keep one deviation list for the package, but say which tags each row applies to, so the buyer can follow it.

How do I know which pump standard a tender expects?

Read the requisition and pump specification first, then each datasheet. Centrifugal pumps in refinery and gas service usually call up API 610. Chemical process pumps may call up ASME B73. Positive displacement pumps have their own API standards, such as API 674, 675 and 676. If the tender is unclear, raise a clarification before you select the pump.

What are the most common deviations in pump tenders?

They usually come from the seal arrangement and piping plan, material class, NPSH margin, allowable nozzle loads, vibration limits, test scope and witness points. Driver, baseplate and painting rules add more. Owner specifications that tighten the standard are a big source. Each deviation needs its own row, with a justification and a cost of withdrawal.

How should a pump maker coordinate seal answers with the seal supplier?

Send the seal supplier every seal requirement from the tender, not just the datasheet line. That includes the owner seal specification, instrument rules and test requirements. Check their reply against the tender before it goes into your offer. A mismatch between the pump offer and the seal offer is a common late clarification. See API 682.

What motor requirements do pump tenders usually include?

Most pump tenders include an electric motor specification with rules on power margin, efficiency class, enclosure, hazardous-area rating, insulation and the approved motor makers. Some name a motor standard or an owner motor specification. Check each line against the motor you buy in. If the motor maker cannot meet a rule, list it as your deviation.

Why do pump witness tests change the price so much?

A witnessed test holds production until the buyer's inspector attends, which needs test bed time, scheduling and sometimes repeat runs. Tests such as NPSH, string or complete-unit tests also add setup work. Read the inspection and test plan for every hold and witness point, and price each one. See the ITP guide.

What do pump makers need to check for sour service?

Check whether the tender calls up NACE MR0175 / ISO 15156 and which parts it applies to. It can change casing, impeller, shaft and bolting materials, hardness limits and heat treatment. It also adds certificate needs. Confirm the scope with the buyer if it is unclear. See NACE MR0175 / ISO 15156.

Which material certificates do pump tenders ask for?

Most ask for EN 10204 inspection documents for pressure-containing parts. Some ask for type 3.1, others for type 3.2, which adds an independent inspector and cost. The requirement may sit in the ITP, the VDRL or the owner specification. Check each one and price 3.2 where it is needed. See EN 10204 3.1 vs 3.2.

How should a pump offer handle noise limits?

State the sound level you guarantee, how it is measured and whether it covers the pump only or the whole unit with motor and coupling. Tenders often set one limit for the full unit at a set distance. If your guarantee covers less, or you need an enclosure to meet it, list it as a deviation or price the extra.

Why do painting specifications cause pump clarifications?

Owners often have their own coating systems, with set surface preparation, layers and thickness. A pump maker's standard paint may not match. Coating rules can also differ between the pump, baseplate and motor. Check the painting specification against what your shop and suppliers apply, and list each difference clearly.

What performance points does a pump maker guarantee?

Usually the rated point, with head, flow, power and NPSH required, within the tolerances of the standard the tender names. Owners sometimes ask for guarantees at more points, or tighter tolerances. State exactly what you guarantee in the offer. Anything beyond your normal guarantee should be a deviation or a priced option.

How do pump makers avoid scope-split gaps in a tender?

List what you supply and what you do not, such as the motor, coupling, seal system, instruments, baseplate, piping and spares. Compare it with the requisition scope line by line. Gaps often hide in auxiliary systems and site services. Put each scope difference into your clarifications so the buyer can compare offers fairly.

What spare parts do pump tenders usually ask for?

Most ask for commissioning spares and a priced list of spares for a set period of operation. Some name the parts, such as seals, bearings and wear rings. Check whether the spares must be priced separately or included. Missing spares lists are a common reason a buyer comes back with questions during the technical bid evaluation.

How does an EPC compare pump offers in a technical bid evaluation?

They line up each offer against the datasheet and specification, then compare performance, efficiency, NPSH, materials, seals, test scope, deviations and documents. Offers that are hard to compare score worse. Make your deviation list clear and tied to clauses. See technical bid evaluation for the buyer's side.

How can a small pump maker answer tenders faster?

Start with a consistent checklist and a standard deviation list format. Reuse justifications that worked before, but check each one against the new tender. Ask clarifications early. Tools that pull out requirements and draft the compliance matrix help most on long packages. The spec requirement extractor is a free first step.

What vendor documents does a pump order usually need?

Typically performance curves, final datasheets, outline and cross-section drawings, seal drawings, material certificates, test procedures and reports, and operation manuals. The vendor data requirements list sets which ones are due with the offer and which after order. Check the dates as well as the list. See the VDRL guide.

What changes when a pump tender calls up JIP33 S-615?

S-615 adds a common set of operator requirements to API 610, with its own data sheet, information requirements and quality requirements. You need to check each layer, not just the pump specification text. Record deviations against the right document. See the JIP33 explainer.

How does OdysseyGPT help a pump maker answer a tender?

It reads the whole tender package and checks each requirement against your own pump datasheets, standard specifications and test procedures. Each requirement gets a status, with a quote and page or cell from the source. You export an editable compliance matrix and a deviations and clarifications list. Your engineers review every row before anything goes out.

What does OdysseyGPT not do for pump manufacturers?

It does not select pumps or seals, or run hydraulic, rotordynamic or nozzle-load calculations. It does not read drawings such as general arrangements. It cannot check what a standard says unless that text is in the uploaded documents. It does not certify compliance or send anything to the customer. Your engineers decide every open item.

Frequently asked questions

What standards do pump tenders usually call up?

Most call up API 610 for centrifugal pumps in petroleum, petrochemical and gas service. API 682 covers shaft seals. NACE MR0175 / ISO 15156 covers sour service and EN 10204 covers certificates. The owner's standards sit on top.

What does an EPC check in a pump offer?

They check compliance with the datasheet and specification. They also check performance data, such as NPSH margin, performance curves and vibration limits. Then they check the test and documentation requirements.

Who prepares the technical offer at a pump manufacturer?

Usually bid engineers or proposal engineers, with help from application engineers. At smaller makers, a project manager often answers the RFQ.

Does OdysseyGPT size pumps or check performance curves?

No. It checks each written requirement against your datasheets and documents and quotes the source. Hydraulic selection and performance decisions stay with your engineers.

References

Understanding API 610

What Is Piping

Visit source

Technical bid evaluation

What Is Piping

Visit source

API 682 Plan 53B

Swagelok

Visit source

NACE MR0175 vs ISO 15156

Project Materials

Visit source

Related Pages