OdysseyGPT

HVAC and cleanroom equipment manufacturers

Air handling unit, chiller and cleanroom equipment makers: check the specification and schedule against your submittal

For applications, sales and project engineers at makers of air handling units, chillers, fan filter units and cleanroom panels who answer a mechanical specification and send product data for approval.

By Ademola Afolabi, Founder, New Odyssey Ltd · Last reviewed:

The short answer

HVAC and cleanroom equipment makers answer a mechanical specification section and an equipment schedule, first with a quotation and then with a technical submittal for the engineer's approval. OdysseyGPT reads the specification, the schedule and your selection printouts and product data, and drafts a compliance and deviation list with a quote from both sides. Your engineers decide each status.

Key Takeaways

  • An HVAC equipment enquiry has two halves: the written specification section and the schedule row with the duty point for each tagged unit.
  • "Or approved equal" lets you offer against a named basis of design, but the differences are yours to declare.
  • Deviations cluster around duty-point performance, casing classes, sound data, controls scope, and dimensions and access.
  • OdysseyGPT reads documents and quotes its sources. It runs no selection and reads no drawing, and engineers decide every status.

See how OdysseyGPT reviews a tender. Tell us how your team reviews tenders today. We can walk through an example together. Book a call

How do HVAC and cleanroom equipment makers answer a specification?

The consulting engineer writes the requirement in two places. The first is a specification section for each type of equipment. In North American projects these sit in Division 23 of the project manual. The second is the equipment schedule, usually a table on the mechanical drawings or a spreadsheet, with one row per tagged unit: AHU-01, CH-02, FFU type A. The row gives the duty point. For an air handling unit that means air flow, external static pressure, coil entering and leaving conditions, fluid flows, filter classes, motor data and the electrical supply.

Many specifications name one maker and model as the basis of design, then allow others with words such as "or approved equal". The rooms, structure, pipework and wiring were laid out around the named unit. A maker who offers an equal is normally expected to show every point where its unit differs, and may carry the cost of changes that follow.

  1. Collect the specification section, the schedule, the general mechanical requirements section and every addendum issued during the bid period.
  2. Run a selection for each tag at the scheduled duty point and keep the printout.
  3. Read the specification text for what the schedule does not hold: casing construction and classes, sound limits, controls scope, factory tests, certification, spares, documents and warranty.
  4. Check the basis-of-design unit's size, weight, connection sides and electrical load against your own.
  5. Mark each requirement complies, deviates, clarification or not addressed, and give the reason.
  6. Carry the deviations into the quotation, and later into the cover sheet of the submittal.

Addenda matter more than their length suggests. A two-line addendum can change a schedule row or delete an approved maker. Record the addendum number beside each requirement it changes, so the offer and the later HVAC submittal answer the same revision.

Which standards and certification programmes come up?

The specification names the standards the ratings must follow and often a certification programme the product must be listed in. The table gives each at name level only. It is our own summary. Use the edition your contract names, and confirm programme scope with the programme itself.

Standards and programmes named in HVAC and cleanroom equipment specifications (own summary)
Document or programmeWhat it is aboutWhere the specification usually pins it down
AHRI certification and AHRI standardsVoluntary programmes that verify published ratings by independent test. Programmes exist for central station air handling unit supply fans, air handling unit casings, air-cooling and air-heating coils and water-chilling packages, each tied to an AHRI rating standardWhether the offered model must be listed in the AHRI directory, or only rated to the AHRI standard
Eurovent certificationThe Eurovent Certified Performance programmes run by Eurovent Certita Certification. The air handling unit programme covers casing characteristics and unit performance for declared rangesWhether the range and the selection software version must be certified, and which casing classes are wanted
EN 1886Mechanical performance of air handling unit casings: strength, air leakage, filter bypass leakage, thermal transmittance, thermal bridging and acoustic insulation, each with test methods and classesThe class required for each characteristic, and whether it is shown on a model box or on the unit delivered
EN 13053Rating and performance of air handling units and of their components and sectionsThe basis of the stated performance and any energy-related class the specifier asks for
ASHRAE standardsStandards the specification cites for energy efficiency (90.1), ventilation (62.1), filter testing (52.2) and health care ventilation (170)Minimum efficiency levels, filter ratings and, in hospitals, room-side requirements that set the unit's duty
ISO 16890 and EN 1822Filter classification. ISO 16890 classes general ventilation filters by particulate matter efficiency. EN 1822 classes EPA, HEPA and ULPA filtersThe class at each filter stage and the evidence wanted, such as a test report for each HEPA filter
ISO 14644Cleanrooms: classification by airborne particle concentration, monitoring, test methods, and design, construction and start-upThe room class and occupancy state your equipment must support, and which tests are in your scope
EU GMP Annex 1Guidance on the manufacture of sterile medicinal products, with cleanroom grades A to DThe grade of each room, and the qualification documents the user expects from equipment suppliers

A specification written from an older master often cites withdrawn documents. A common case is a filter class to a standard that ISO 16890 has replaced. Offer to the current standard, say so, and list it as a clarification. For cleanroom projects, see the glossary entry on cleanroom classification.

What goes in the list of deviations?

The engineer approves a submittal on the understanding that it meets the specification unless a difference is declared. A difference that is found on site after approval is hard to defend. These are the areas where an offered unit most often departs from the documents.

Where HVAC equipment offers most often differ from the specification (own summary)
AreaWhat to compare
Performance at the scheduled duty pointAir flow, external static pressure, coil capacity at the scheduled entering air and fluid conditions, glycol content, fluid and air pressure drops, absorbed and installed motor power
Casing leakage and thermal classesThe class asked for under each air handling unit specification heading, the edition it refers to, and whether your evidence is a model box test or a test on the real unit
Sound dataWhether the limit is sound power or sound pressure, in-duct or casing radiated, by octave band or as a single figure, and at what operating point
ControlsWho supplies the controller, sensors, actuators and variable speed drives, the communication protocol, and where factory wiring stops
Dimensions and accessLength, width, height and weight against the plant room and the basis-of-design unit, section splits for delivery, access side, door swing and coil withdrawal space
Filters and hygieneFilter classes and frame type at each stage, drain pan and internal surface materials, and any hygienic construction clause
ElectricalSupply voltage and frequency, starting method, motor efficiency class and the electrical load compared with the feeder shown for the named unit
Tests, certificates and documentsFactory tests asked for, witness rights, certification listings, and the content and timing of the submittal and manuals

An equal is judged on the whole specification, not the schedule row

A selection that meets the scheduled air flow and capacity can still fall short on casing class, sound, access or controls. Read the substitution clause before you offer. Some specifications ask for a formal substitution request by a set date, and some put the cost of redesign on the party proposing the alternative.

Which documents follow after award?

After the order, the contractor asks for the documents the specification lists, in the order its programme needs them. The contract sets the list. These are the usual ones for air handling units, chillers and cleanroom air equipment.

Post-award documents for HVAC and cleanroom equipment (own summary)
DocumentWhat the reviewer looks for
Technical submittalFor each tag: the selection printout at the scheduled duty point, performance data, fan and pump curves, sound data, dimensions and weights, materials, wiring information and a list of deviations
CertificatesCertification listings for the offered model, declarations of conformity, filter test reports and, where asked, a certificate of conformance
Factory test reports, where specifiedThe test named in the specification, the unit serial number, the method and class basis, the result and who witnessed it. See FAT vs SAT
Operation and maintenance manualInstallation, start-up, operation and maintenance instructions for the units as supplied, with spare parts lists and as-built data
Commissioning support dataDesign air and water flows, fan curves, control sequences and set points, and the pre-start checks the commissioning team needs
Qualification support, for cleanroom projectsDocuments the user needs for installation and operational qualification. See IQ, OQ and PQ

A checklist for the submittal itself is on the HVAC submittal checklist template page. Pharmaceutical users add their own layer of documents. The pharmaceutical equipment manufacturers page covers it.

How does OdysseyGPT help?

OdysseyGPT reads the files you upload and compares what they say with what the customer wrote. Every finding carries the passage from each side. Document Review takes the specification section and schedule as the base and your selection printouts, product data and offer text as the documents to check. It reviews forward and in reverse, so it also lists conditions in your documents that the specification does not answer. It exports an editable compliance matrix with the deviations and clarifications. The other tools each read a narrower set.

HVAC and cleanroom equipment documents and the tool that reads each
Your documentToolWhat it reports
Specification section, schedule, addenda and your submittal documentsDocument ReviewA status and two quotes for each requirement, and conditions in your documents the specification is silent on
Specification sections and the general mechanical requirementsCustomer Specification Review (beta)A requirements register: one line per obligation for performance, construction, tests and documents, with its clause
The schedule row as a datasheet and your selection data for the same tagDatasheet Comparison (beta)Matched fields and each material difference in value, after units are brought to a common basis
Quotation, clarification replies and review commentsDeviation Register (beta)One running record of each deviation from offer to the engineer's decision
The contract's list of required documentsVDRL/MDR Tracker (beta)A register of each required submission with its due date and status
Your inspection and test plan and the specification's quality clausesITP Validator (beta)Tests the specification asks for that the plan omits, and witness points that do not match
Factory test reports and instrument calibration certificatesCalibration Validity Check (beta)Each instrument named in a report matched to a certificate valid on the test date
Test procedure, approved submittal, plan status and open items before a witnessed testFAT Readiness Check (beta)Whether the documents a witnessed factory test depends on are in place
Handover folder and the customer's indexMRB Readiness Check (beta)Documents that are missing, unapproved or at the wrong revision

The tools are grouped by stage: tender, order and inspection. The broader picture is on the manufacturing page. A general method for the comparison is in the datasheet vs specification checklist.

What does a result look like?

The table below is an invented example. The project, the unit tag, the section and clause numbers, the maker's documents, the class names and every figure are made up to show how a result is laid out. Nothing in it comes from a real project, a real manufacturer or a standard.

Invented example: specification section and schedule for air handling unit AHU-03, checked against a maker's submittal
Specification or schedule requirement (quoted)Maker's submittal (quoted)StatusNote
"AHU-03: supply air 4.2 m³/s at 650 Pa external static pressure." (Schedule M-601, row 3)"Supply air flow 4.20 m³/s. External static pressure 650 Pa." (Selection printout AHU-03, p. 1)CompliesSame air flow and pressure basis in both documents.
"Cooling coil: 96 kW total at 28 °C dry bulb, 21 °C wet bulb entering air, chilled water 6/12 °C." (Schedule M-601, row 3)"Total cooling capacity 91.5 kW. Entering air 28.0/21.0 °C. Water 6.0/12.0 °C." (Selection printout AHU-03, p. 2)DeviatesStated capacity is below the scheduled figure at the same conditions.
"Casing air leakage shall be class L1, demonstrated by test on one delivered unit." (Section 23 73 13, 2.3.B)"Casing air leakage class L2, model box test." (Technical data sheet TD-40, p. 3)DeviatesClass and evidence both differ from the clause. Check the class names against the edition the contract cites.
"Casing radiated sound power shall not exceed the values in Table 2 in any octave band." (Section 23 73 13, 2.7.A)"In-duct sound power level, supply outlet, by octave band." (Selection printout AHU-03, p. 4)ClarificationThe submittal gives in-duct data only. No casing radiated figures were found.
"Final filter stage: ePM1 80% to ISO 16890." (Schedule M-601, row 3)"Bag filter F9." (Selection printout AHU-03, p. 3)ClarificationThe class is stated to a different filter standard from the one in the schedule.
"Units shall be supplied with a factory-mounted controller with BACnet interface." (Section 23 73 13, 2.9.A)"Controls by others. Terminal box provided for field wiring." (Offer letter, p. 2)DeviatesControls are outside the maker's stated scope.
"Access doors shall be on the left-hand side viewed in the direction of air flow." (Section 23 73 13, 2.4.C)"Access side: right." (Selection printout AHU-03, p. 1)DeviatesOpposite hand to the clause.
"One unit shall be factory tested for casing deflection in the presence of the Engineer." (Section 23 73 13, 3.2.A)No matching statement found in the documents supplied.Not addressedAdd the test to the offer or declare it as not included.

An applications engineer opens the two quotes on each row and confirms or changes the status. Rows left as deviates or clarification go onto the deviation sheet at the front of the submittal, or back to the selection for another run.

Where OdysseyGPT falls short

  • It runs no equipment selection. It cannot size a coil, pick a fan, rate a chiller or tell you whether a different selection would meet the duty point.
  • It does not read mechanical drawings, plant room layouts, control schematics or wiring diagrams. A schedule it can use must be a table in a PDF, Word, Excel or CSV file. A requirement that appears only as a drawing note or a dimension on a plan is not checked.
  • It does not test or certify equipment, and it does not classify a cleanroom. It can show what a test report or certificate states. It cannot confirm the result.
  • It does not look up certification directories. Whether a model is listed with AHRI or Eurovent is for you to confirm on the programme's own directory.
  • It holds no standards. A class limit that sits only inside EN 1886, an AHRI standard or ISO 14644 is checked only if you upload the edition and it is readable text.
  • It is not submittal workflow software. It does not route a submittal for approval, stamp it or keep the contractor's submittal log.
  • It can pair a requirement with the wrong line or miss one, most often where several tagged units share one schedule with similar rows. The quotes are there so a person can catch this.
  • Tools carrying a beta marker on this page are available on request, and we set each team up ourselves.

Talk through your tender review

See how OdysseyGPT reviews a tender

Tell us how your team reviews tenders today. We can walk through an example together.

Book a call

Buyer questions

20 questions bid engineers, proposal engineers and buyers ask. Last reviewed:

What are HVAC submittal requirements?

They are the items a mechanical specification section says the equipment maker must send for approval. For each tagged unit that normally means a selection printout at the scheduled duty point, performance and sound data, dimensions and weights, electrical and controls information, certification evidence and a list of deviations. The section's own submittals article is the list to work to. See HVAC submittal.

What is an equipment schedule in a mechanical specification?

It is the table, usually on the mechanical drawings or in a spreadsheet, with one row for each tagged unit. The row holds the duty point: for an air handling unit, the air flows, external static pressure, coil conditions, filter classes and electrical supply. The written specification section holds the construction, sound, controls and test requirements. An offer has to answer both.

What does "or approved equal" mean for an equipment maker?

It means the engineer designed around a named maker and model but will consider others that match it. Approval is not automatic. The maker offering the alternative is normally expected to show each point of difference, and some specifications require a formal substitution request by a set date. Read the substitution clause before you decide how to offer.

What is a basis-of-design unit and why does it matter?

It is the product the engineer used when laying out the plant room, structure, pipework and electrical supply. If your unit is longer, heavier, handed differently or draws more current, something else in the design may have to change. Compare size, weight, connection positions and electrical load with the named unit, and declare the differences with your offer.

How should we handle addenda issued during the bid period?

Treat each addendum as part of the specification. Note its number against every schedule row and clause it changes, rerun any selection it affects, and state in your quotation which addenda you have included. A short addendum can alter a duty point or remove an approved maker, and a submittal built on the superseded version will come back rejected.

Which standards does an air handling unit specification usually cite?

European and export projects usually cite EN 1886 for casing mechanical performance and EN 13053 for unit rating and performance, often with Eurovent certification. North American projects cite AHRI rating standards and ASHRAE standards for energy, ventilation and filtration. Filters are classed to ISO 16890 and, for high-efficiency stages, EN 1822. Check the edition of each. See air handling unit specification.

What does "AHRI certified" mean in a specification?

It asks for a product that takes part in an AHRI certification programme, where published ratings are verified by independent laboratory tests and listed in the AHRI directory. That is more than being rated to an AHRI standard. Check that a programme covers your product and that the scheduled duty point is inside its scope. The AHRI certification page explains the difference.

Can we offer Eurovent certification where the specification asks for AHRI?

Only with the engineer's agreement. Both schemes verify published performance through independent testing, but they are run by different bodies and rest on different standards and rating conditions. Raise it as a clarification before the bid closes, state which certification your product holds, and list it as a deviation if no answer comes back in time.

What goes in the list of deviations for an air handling unit offer?

Every point where the unit offered differs from the specification or schedule, with the clause, what you offer and why. Common entries are capacity or pressure at the duty point, casing leakage and thermal classes, sound data, controls scope, dimensions, access side, filter classes and factory tests not included. The technical deviation list guide gives a format.

What if our selection falls short of the scheduled duty point?

Say so. First check that the selection used the scheduled entering conditions, fluid and altitude, because a different basis is the usual cause. If the shortfall is real, either reselect or declare the offered figure as a deviation with the reason. A capacity a few per cent below the schedule that is found after approval is harder to resolve than one declared at bid.

How are casing leakage and thermal classes specified?

Usually by reference to EN 1886, which sets test methods and classes for casing strength, air leakage, filter bypass leakage, thermal transmittance and thermal bridging. The specification names the class it wants for each. Check two things: the edition cited, because class names can differ between editions, and whether the evidence must come from a model box or from a test on the delivered unit.

What sound data does a specification usually ask for?

Most ask for sound power levels by octave band at the scheduled operating point, for the supply and return duct connections and for noise radiated from the casing. Some set limits. Check whether the requirement is sound power or sound pressure, because the two are not comparable, and whether your selection software reports casing radiated values at all.

How should controls scope be shown in the offer?

State plainly what is factory fitted and what is left to others: controller, sensors, valves, actuators, variable speed drives, wiring and the communication interface. Controls are often split between the equipment section and a separate building management section, and the two can disagree. Where they do, raise a clarification and say which split your price assumes.

Why do dimensions and access cause so many submittal comments?

Because the plant room was drawn around another unit. Reviewers check overall size, section splits for delivery, operating weight, access side, door swing and the space needed to withdraw coils and filters. OdysseyGPT can compare dimensions and access sides that are written in the specification and your data. It does not read the layout drawing, so fit in the room remains your check.

How should filter classes be stated in the submittal?

To the standard the specification names. General ventilation filters are classed under ISO 16890 by particulate matter efficiency, and high-efficiency EPA, HEPA and ULPA filters under EN 1822. Classes from an older or different standard are not direct equivalents. If the specification cites a withdrawn standard, offer to the current one and say so in a clarification.

What does a cleanroom class in the specification mean for our equipment?

The class describes the finished room, measured under ISO 14644-1 in a stated occupancy state. Your equipment is not classified by itself. Look for the requirements derived from the class: filter stages, air flow, leakage, cleanable surfaces, test ports and qualification documents. If you are asked to guarantee the room class, treat that as a contract point. See cleanroom classification.

What changes when the room falls under EU GMP Annex 1?

The room is given a grade from A to D, with particle limits at rest and in operation and with microbial limits. Annex 1 expects cleanrooms and clean air equipment to be qualified, with tests such as installed filter leakage, air flow and pressure difference. Suppliers are usually asked for documents that support that qualification. See the ISO 14644 page.

Which documents does the customer expect after award?

The technical submittal first, for approval before manufacture. Then certificates and declarations, factory test reports where the specification asks for tests, the operation and maintenance manual, and data the commissioning team needs such as design flows, fan curves and control set points. The HVAC submittal checklist template page lists what to check on the first of these.

How does OdysseyGPT check a submittal against the specification?

Document Review takes the specification section and schedule as the base and your selection printouts and product data as the documents to check. Each requirement gets a status and a quote from both sides, and unanswered requirements are listed. Datasheet Comparison (beta) compares a schedule row with your selection data field by field. An engineer confirms every status.

What does OdysseyGPT not do for an HVAC equipment maker?

It does not run selections, size coils or fans, or calculate performance. It does not read mechanical drawings, layouts or control schematics. It does not test or certify equipment, look up certification directories or classify a cleanroom, and it is not submittal workflow software. It reads the documents you upload, compares them with the customer's written requirements and quotes its sources.

Frequently asked questions

Who prepares the technical submittal at an HVAC equipment maker?

Usually an applications or sales engineer, working with the selection software, the factory for construction details and test scope, and controls engineers where the unit is supplied with its own controls. The contractor forwards the submittal to the engineer.

Does OdysseyGPT run air handling unit or chiller selections?

No. It reads the selection printout your own software produces and compares the stated values with the specification and schedule. It does not calculate performance or choose components.

Can OdysseyGPT read an equipment schedule?

Yes, when the schedule is a table in a PDF, Word, Excel or CSV file. It cites the page, sheet or cell a value came from. It does not read drawings, so a schedule that exists only as a drawing image may need to be exported first.

Does OdysseyGPT check whether a unit is AHRI or Eurovent certified?

No. It can show that the specification asks for a listing and what your submittal says about it. Confirm the listing itself on the AHRI directory or the Eurovent Certita Certification directory.

References

AHRI Certification

Air-Conditioning, Heating, and Refrigeration Institute

What the programme is, who can take part and the directory of certified product performance.

Visit source

AHRI Certification Programs

Air-Conditioning, Heating, and Refrigeration Institute

Programme pages, including central station air handling unit supply fans and forced-circulation coils.

Visit source

Eurovent Certified Performance: Air Handling Units

Eurovent Certita Certification

Programme scope and the certified casing and performance characteristics.

Visit source

EN 1886:2025 Ventilation for buildings. Air handling units. Mechanical performance

Estonian Centre for Standardisation and Accreditation (catalogue entry)

Paid standard. Catalogue entry used for the title and scope. Use the edition your contract names.

Visit source

EN 13053:2019 Ventilation for buildings. Air handling units. Rating and performance for units, components and sections

Estonian Centre for Standardisation and Accreditation (catalogue entry)

Paid standard. Catalogue entry used for the title and scope.

Visit source

ASHRAE standards and guidelines

ASHRAE

Home of Standards 52.2, 62.1, 90.1 and 170. Use the edition the specification cites.

Visit source

ISO 14644-1:2015 Cleanrooms and associated controlled environments. Part 1: Classification of air cleanliness by particle concentration

ISO

Paid standard. Catalogue abstract used for scope.

Visit source

EudraLex Volume 4, Annex 1: Manufacture of Sterile Medicinal Products (2022)

European Commission

Free. Used for the four grades and the cleanroom qualification paragraphs.

Visit source

Related Pages