The short answer

Instrumentation manufacturers answer a tender by checking each instrument or control-valve datasheet against their own product data. They also check the project instrument specification. The checks cover hazardous-area certification, safety integrity, materials and communication protocol. Then they list every deviation. OdysseyGPT drafts the compliance matrix and deviation list with a source quote per requirement.

Key Takeaways

  • Instrument tenders are datasheet-heavy: one datasheet per tag, plus a project instrument specification and owner standards.
  • Deviations often come from hazardous-area certification, SIL evidence, wetted materials and protocol.
  • Every deviation row needs a justification and a cost of withdrawal.
  • Your engineers set every status; OdysseyGPT drafts the rows with citations.

How do instrumentation manufacturers answer tender specifications?

An instrument enquiry usually comes as a set of instrument datasheets, one per tag. It also has a project instrumentation specification, the owner's standards and the industry standards they call up. Control-valve packages add process data and sizing cases. The manufacturer checks each datasheet field and clause against the offered model and options. Then they return a compliance statement and a technical deviation list.

Who answers RFQs at an instrumentation maker?

Bid engineers and proposal engineers usually own the technical offer. Application engineers select models and size control valves. At smaller instrument makers, a project manager often answers the RFQ. They get model selection from engineering and certificates from quality staff.

What goes in an instrument deviation list?

The example below uses an invented specification, PS-INS-001, for pressure transmitters and a control valve. Every value is illustrative.

Invented example: deviation rows against PS-INS-001 Rev 1
Spec clauseRequirementOfferedStatusDeviation / clarificationJustificationCost of withdrawal
PS-INS-001 §4.3Transmitter certified Ex d, gas group IICEx d, gas group IIB + H2DeviationIIB + H2 instead of IICCovers hydrogen; buyer to confirm against the area classificationIIC housing: +4%, +2 weeks
PS-INS-001 §5.1Communication HART 7HART 7CompliesNoneDatasheet field 22Not applicable
PS-INS-001 §6.2Wetted parts to NACE MR0175 / ISO 15156316L diaphragm, NACE statementClarificationStatement, not a material certificateMaterial certificate available on orderCertificate: no cost
PS-INS-001 §8.4Control valve sized to IEC 60534-2-1Sizing to ANSI/ISA-75.01.01ClarificationISA equation set usedISA and IEC sizing equations are harmonisedRe-issue on IEC basis: no cost

Start from the free deviation list template, and use the datasheet vs specification checklist, which covers instrument checks.

Which standards come up in instrumentation tenders?

StandardWhat it coversTypical deviation source
IEC 60534Industrial-process control valves. Part 1 gives the terms and general points for the series (IEC)Which part and edition the tender calls up
ANSI/ISA-75.01.01Control valve sizing equations for fluid flow, harmonised with IEC 60534-2-1 (ANSI webstore)Sizing basis and equation set
IEC 60079 / ATEX / IECExEquipment for explosive atmospheres and how it is certified (Gore)Protection concept, gas group, temperature class, scheme
IEC 61508 / IEC 61511Functional safety, and how it applies to safety instrumented systems in the process industry (exida)SIL capability evidence for instruments in safety functions
NACE MR0175 / ISO 15156Materials for H2S-containing environments in oil and gas production (Project Materials)Wetted-material evidence
Communication protocolHART or a fieldbus as named in the datasheetProtocol version and device description files

How does OdysseyGPT help?

OdysseyGPT reads the whole specification package for your instrumentation tender. That means the project and technical specifications, the material requisition, the inspection and test plan, the datasheets and the standards they call up. It checks each customer requirement against your own datasheets, standard specifications and test procedures. Each requirement gets a status: complies, deviates, clarification, not addressed, document requested, not applicable or out of scope. Each status comes with a quote from the source document and page.

It exports an editable compliance matrix and a deviations & clarifications list. It reads PDF, Word, Excel and CSV files. It does not read engineering drawings such as general arrangements or P&IDs. It does not send anything to the customer. Your engineers decide every open item, the justification and the cost of withdrawal, and they own what goes out. See OdysseyGPT for manufacturing.

OdysseyGPT Managed: from $999/month

A managed subscription with onboarding included. See pricing or request a demo built around one of your own past tenders.

Buyer questions

20 questions bid engineers, proposal engineers and buyers ask. Last reviewed:

What is usually in an instrumentation tender package?

An instrumentation tender usually holds one datasheet per tag, a project instrumentation specification and the owner's standards. It also names the industry standards that apply. Control valve packages add process data and sizing cases. Many tenders include an inspection and test plan and a vendor data requirements list. A large project can send hundreds of datasheets in one package.

What is an instrument datasheet in a tender?

An instrument datasheet is a form that sets out what one tagged instrument must do. It lists the service, process conditions, ranges, materials, connections, enclosure, hazardous-area rating and signal. Many EPCs use forms based on ISA templates or their own layouts. The manufacturer fills in or confirms the offered model and options against each field.

Why do instrumentation tenders call up IEC 60534?

IEC 60534 is the series of standards for industrial-process control valves. Its parts cover terms, sizing equations, dimensions, testing and noise prediction, among other topics. Tenders cite it to set a common basis for sizing and checking control valves. Check which parts the tender names. Our IEC 60534 page explains what to check.

What should I check in control valve sizing cases?

Check that every flow case on the datasheet, such as minimum, normal and maximum, is sized. Then check the valve opening at each case, the predicted noise and any flashing or cavitation warnings. Confirm which equation set you used. If the tender sets limits on opening or noise and a case misses them, list it as a deviation with the reason.

What is seat leakage class on a control valve datasheet?

Seat leakage class states how much the closed valve may leak in a factory test. Tenders usually cite the classes in IEC 60534-4 or the matching ANSI/FCI 70-2 classes. Higher classes allow less leakage. Check that your offered trim and seat meet the class on the datasheet. A lower class is a deviation the buyer must accept.

What SIL evidence do buyers want for a transmitter or valve?

When an instrument is part of a safety instrumented function, buyers usually want SIL capability evidence under IEC 61508. That often means a certificate or a failure-rate report, plus a safety manual. The end user designs the whole safety function under IEC 61511. Check exactly which evidence the tender asks for. See our IEC 61508 and IEC 61511 page.

Does an instrument maker need to comply with IEC 61508 or IEC 61511?

In general, device makers design and certify products against IEC 61508. IEC 61511 is aimed at the end user and integrator who design, run and maintain the safety instrumented system in the process industry. Tenders often cite both. As a supplier, you usually provide the IEC 61508 evidence the user needs for their IEC 61511 work.

What hazardous-area details must an instrument offer state?

State the protection concept, such as flameproof or intrinsic safety, plus the gas group, temperature class and equipment protection level. Also state the certification scheme, such as ATEX or IECEx. Check each value against the area classification on the datasheet. A lower gas group or a different protection concept is a deviation, even if the device is otherwise suitable.

What enclosure rating do instrument tenders ask for?

Most tenders ask for a minimum ingress protection rating stated as an IP code from IEC 60529. The first digit covers solids and dust, and the second covers water. Outdoor and offshore sites often ask for higher water ratings. Check the code against your housing and cable entry options. Some North American tenders state NEMA ratings instead, so check which system applies.

How should an instrument offer answer sour service requirements?

Check every wetted part, such as the diaphragm, process connection, seals and fill fluid, against the sour service clause. Tenders usually call up NACE MR0175 / ISO 15156. State which parts comply and what evidence you supply, such as a statement or a material certificate. If the tender asks for a certificate and you offer a statement, raise a clarification. See NACE MR0175 / ISO 15156.

What should I check on the communication protocol?

Check the protocol and version the datasheet names, such as HART or a fieldbus. Also check whether the buyer needs device description files, a specific host system or extra diagnostics. A different protocol version can affect the control system. If your device supports a different version or needs an option code, state it in the offer and flag it.

What are the most common deviations in an instrumentation offer?

Common deviations include a different hazardous-area gas group, a lower IP rating, a different wetted material and SIL data instead of a certificate. Others are accuracy statements on a different basis, process connection sizes, cable entries and calibration certificates. Control valves add leakage class, noise and sizing basis. Record each one in a technical deviation list.

How should I answer accuracy requirements on an instrument datasheet?

Match the basis of the accuracy figure, not just the number. Tenders may ask for reference accuracy, total probable error or performance over a temperature range. Your catalogue may state a different basis. State your figure with its basis and conditions. If you cannot show the tender's figure on the same basis, raise a clarification instead of claiming compliance.

What does an EPC check in an instrumentation offer?

An EPC usually checks that every tag is covered first. Then it checks hazardous-area ratings, materials, accuracy, signals, SIL evidence and certificates. For control valves it also checks sizing, noise and leakage class. It compares offers tag by tag in a technical bid evaluation. See technical bid evaluation for how buyers score offers.

How do I check hundreds of instrument datasheets quickly?

Group tags by instrument type and service first, so you can check similar datasheets together. Then check each field against your model code and options, and note every tag where one value differs. Check the specification clauses that sit outside the datasheets too. Use a consistent status for each line. The datasheet vs specification checklist lists the fields to check.

What calibration and test certificates do instrument buyers ask for?

Many buyers ask for a calibration certificate for each instrument, plus material certificates for pressure parts. Control valves often need pressure test and seat leakage test reports. The vendor data requirements list and the inspection and test plan set out what is needed and when. Check both at bid stage. See EN 10204 3.1 vs 3.2 for material certificates.

What documents does an instrumentation buyer expect after the order?

The vendor data requirements list sets them out. It usually covers final datasheets, dimensional drawings, sizing calculations, hazardous-area and SIL certificates, calibration and test reports and manuals. Each item has a due date and an approval code. Check the list at bid stage so you price the effort. See our VDRL guide.

How does OdysseyGPT check instrument datasheets against a tender?

OdysseyGPT reads the whole tender package, including datasheets, the instrumentation specification, requisition and ITP. It checks each requirement against your own product datasheets, standard specifications and test procedures. It reads PDF, Word, Excel and CSV files. Each row gets a status with a quote and page, sheet or cell from the source, ready for your engineers to review.

What can't OdysseyGPT do on an instrumentation tender?

OdysseyGPT does not size control valves, calculate noise or select instruments. It does not read loop diagrams, hook-up drawings or P&IDs, and it does not certify SIL or hazardous-area compliance. It does not send anything to the customer. It drafts cited compliance rows from the written documents, and your engineers decide every status.

Is there a free compliance matrix template for instrument tenders?

Yes. Our free compliance matrix template has columns for the clause, requirement, offer, status and comment. It works for instrument datasheets and specifications. Use it with the technical deviation list template when the tender asks for exceptions to be listed separately.

Frequently asked questions

What standards do instrumentation tenders usually call up?

Control valves usually fall under IEC 60534 and ANSI/ISA-75. Hazardous areas call up IEC 60079 with ATEX or IECEx certification. Safety functions call up IEC 61508 and IEC 61511. NACE MR0175 / ISO 15156 covers sour service. The owner's standards sit on top.

Are ISA and IEC control valve sizing equations the same?

ANSI/ISA-75.01.01 is harmonised with IEC 60534-2-1. There are small differences in terms and method. Raise a clarification if the tender names one and you size to the other.

Who prepares the technical offer at an instrumentation manufacturer?

Usually bid engineers or proposal engineers, with help from application engineers. At smaller makers, a project manager often answers the RFQ.

Can OdysseyGPT handle hundreds of instrument datasheets?

It reads PDF, Word, Excel and CSV datasheets. It checks each requirement against your product documents and quotes the source. We agree package and document volume with each customer.

References

IEC 60534-1:2023 Industrial-process control valves

IEC

Visit source

ANSI/ISA-75.01.01-2012 control valve sizing equations

ANSI webstore

Visit source

IECEx/ATEX: defining and certifying explosion-protected safety standards

Gore

Visit source

Functional safety standards: IEC 61508 vs IEC 61511

exida

Visit source

NACE MR0175 vs ISO 15156