Compliance matrix for engineering specifications (clause by clause) vs proposal compliance matrices

Two documents share one name. This guide explains the engineering version that equipment manufacturers submit against a technical specification, with an example table.

By Ademola Afolabi, Founder, New Odyssey Ltd · Last reviewed:

The short answer

An engineering compliance matrix lists every clause of a technical specification. It states what the manufacturer offers against each one. Each row is marked complies, clarification, deviation or not offered. A proposal compliance matrix instead maps a request for proposal's instructions to sections of a written proposal. Equipment tenders need the first kind.

Key Takeaways

  • An engineering compliance matrix has one row per specification clause, including the clauses you meet.
  • A proposal compliance matrix maps RFP instructions and evaluation criteria to proposal sections.
  • Many web guides about compliance matrices describe the proposal kind, written by proposal-software vendors.
  • The deviation list is the subset of the engineering matrix that is not "Complies".

What does a compliance matrix look like?

In engineered-equipment tenders, a compliance matrix (also called a table of compliance or a clause-by-clause compliance statement) is a table with one row per clause of the specification. Each row says what the clause requires, what is offered, and whether the offer complies. Bid engineers, proposal engineers and project managers at manufacturers build these as a routine part of answering tenders; one proposal engineer job advert lists "Prepare Compliance Matrices and Technical Clarifications" among the duties (Kowork job description).

Example rows from an engineering compliance matrix (invented specification PS-PMP-004 Rev 1, centrifugal pump)
ClauseRequirement (summary)OfferedStatusRemark / reference
PS-PMP-004 §2.1Pump designed to API 610API 610, OH2 typeCompliesDatasheet line 3
PS-PMP-004 §3.4Casing material 12% chrome steel12% chrome steel casingCompliesMaterial list, item 1
PS-PMP-004 §4.2Mechanical seal to API 682, plan 53BAPI 682 seal, plan 53ADeviationPlan 53B available, see cost of withdrawal in the deviation list
PS-PMP-004 §5.1Performance test witnessedPerformance test, witness by buyer on requestClarificationBuyer to confirm witness points in the ITP
PS-PMP-004 §6.3Motor supplied by pump vendorBare-shaft pump, motor by othersNot offeredMotor excluded from scope

The pump rows are invented. API 682 plans 53A and 53B both pressurise a barrier fluid between dual seals; 53B uses a bladder accumulator and allows higher pressure (Swagelok), which is why offering one in place of the other is a deviation.

Engineering compliance matrix vs proposal compliance matrix

Engineering (specification) compliance matrixProposal compliance matrix
Used inEquipment and package tenders from EPCs and ownersRFPs for services, software and government contracts
RowsOne per clause of the technical specification and datasheetOne per RFP instruction or evaluation criterion
Answer in each rowWhat is offered and a status: complies, clarification, deviation, not offeredWhere in the proposal the requirement is answered (section and page)
Who writes itBid engineers, proposal engineers and project managers at the manufacturerProposal managers and bid writers
Who reads itTBE engineers and specialist reviewersProposal evaluators and contracting officers
EvidenceDatasheets, certificates, test reports, drawingsNarrative proposal text
Typical toolsExcel or Word, owner templates, spec-review softwareRFP and proposal software

Search results mix the two. Many of the guides that come up for "compliance matrix" are written for proposal teams, such as Loopio's proposal compliance matrix guide (Loopio) and RocketDocs' glossary entry (RocketDocs). Those guides are good for RFP writers. They do not cover a specification checked clause by clause against a datasheet.

If you sell narrative proposals, see OdysseyGPT vs RFP software for when an RFP tool is the better fit.

Compliance matrix, deviation list and TBE: how they connect

DocumentWritten byContainsPurpose
Compliance matrixManufacturerEvery clause, with a statusShows nothing was skipped
Technical deviation listManufacturerOnly rows that are not "Complies", with justification and cost of withdrawalDeclares exceptions so they can be accepted, rejected or priced
Technical bid evaluationEPC or ownerEach bidder's offer against key requirementsDecides which bids are technically acceptable

Build the compliance matrix first. Filter it for every row that is not "Complies" and you have the draft deviation list. That way the two can never disagree.

Compliance matrix vs requirements traceability matrix

A bid compliance matrix says whether your offer meets each customer requirement, with a status and evidence. A requirements traceability matrix (RTM) comes from systems and software engineering. It links each requirement to the design, tests and documents that prove it. You send the compliance matrix with the bid. An RTM usually comes later, during the project.

Bid compliance matrixRequirements traceability matrix (RTM)
Comes fromTenders and RFQs for engineered equipmentSystems and software engineering
Question it answersDoes our offer meet this customer requirement?Where is this requirement designed, built and verified?
Each row linksCustomer requirement → what you offer → status → evidenceRequirement → design item → test or check → result
Typical statusComplies, clarification, deviation, not offeredLinked, verified, open or not yet traced
WhenBid stage, sent with the offerDuring design and build, kept up to date until handover
Who keeps itBid, proposal or application engineer at the supplierSystems, design or quality engineers on the project
Typical toolsExcel or Word, owner templates, spec-review softwareRequirements tools such as DOORS, Polarion or Jama, or a spreadsheet

Bid engineers need the compliance matrix for almost every engineered-equipment tender. You need an RTM when a contract asks you to prove, after award, that each requirement was met: for example by linking it to a drawing, an inspection and test plan (ITP) step, a test report or a document on the vendor data requirements list. Safety standards such as DO-178C, ISO 26262 and IEC 61508 make this kind of traceability a formal requirement.

If a tender asks for a "traceability matrix" at bid stage, ask the buyer what it should link to. Often a column for the planned check (test, inspection, analysis or review) in your compliance matrix is enough. A good compliance matrix is also the best start for an RTM: it already has one row per requirement with its clause reference. Start from our free compliance matrix template.

How to build a clause-by-clause compliance matrix

  1. List every governing document and its revision: requisition, project specification, owner standards, datasheets and addenda.
  2. Agree the order of precedence when documents conflict, or raise a technical query. See governing-document precedence.
  3. Split the specification into one row per requirement. A clause with three requirements becomes three rows.
  4. For each row, record the offered value from your datasheet, catalogue or qualification records.
  5. Set one status per row and add the reference that proves it.
  6. Have a second engineer check every row that is not "Complies" and every row about materials, tests and certificates.
  7. Export the non-compliant rows into the tender's deviation form.

Step 3 is where requirements get missed. Our free compliance matrix template has the columns ready, one row per requirement, with a filled-in valve example.

Where OdysseyGPT fits

OdysseyGPT checks each customer requirement in the specification package against your own datasheets. Each one gets a status: complies, deviates, clarification, not addressed, document requested, not applicable or out of scope. Each status comes with a quote from the source page, sheet or cell. It exports the result as an editable compliance matrix and a deviations & clarifications list. A bid engineer, proposal engineer or project manager decides every open item. It does not interpret engineering drawings such as general arrangements or P&IDs. See OdysseyGPT for manufacturing.

Buyer questions

20 questions bid engineers, proposal engineers and buyers ask. Last reviewed:

Who prepares the compliance matrix for an equipment tender?

The manufacturer prepares it as part of the offer. A bid engineer, proposal engineer or project manager usually owns it, with design, quality and specialist engineers filling in their own rows. The EPC or owner's engineers then use it during technical bid evaluation to check that nothing was skipped.

How detailed should each row of a compliance matrix be?

Use one row per requirement, not one row per clause. A clause that asks for a material, a test and a certificate becomes three rows. That way each row has a single status and a single piece of evidence. It also means a partial compliance cannot hide inside a row marked complies.

What status values should a compliance matrix use?

Use a short, defined set and apply it the same way on every row. A common set is complies, clarification, deviation, not offered and not applicable. If the tender gives its own codes, use those. Define each value at the top of the matrix, so the evaluator reads them the way you meant them.

What should go in the reference or evidence column?

Point to the document that proves the status: datasheet line, material list item, test procedure, type-test report or certificate. Give the document number and, where useful, the page. An evaluator who can find the evidence in seconds is less likely to raise a query. A row marked complies with no reference invites one.

Do I list every clause of each referenced standard?

Usually not, unless the tender asks for it. Most matrices list each clause of the project specification and datasheet. A referenced standard often gets one row stating the edition you comply with, plus rows for any options, supplements or changes the specification makes to it. Follow the tender instructions if they say otherwise.

Should I use the client's compliance matrix template?

Yes, if the tender provides one. Some EPCs issue a pre-filled matrix with their clauses already listed, and expect only the offer and status columns completed. Do not delete or merge their rows. If you need more detail, add a remark or split a row and say so. Otherwise, our compliance matrix template is a starting point.

Can a row be marked 'complies with comment'?

It is better not to. 'Complies with comment' leaves the evaluator unsure whether there is a difference. If the comment changes what is offered, the row is a deviation. If it only explains a method or reference, it is a clarification. Pick one and state the difference plainly.

How do addenda affect the compliance matrix?

Each addendum can add, change or delete requirements, so the matrix must follow the latest issue. Add a column for the document and revision on every row, and re-check rows that the addendum touches. A matrix built against a superseded revision is one of the easiest errors for an evaluator to spot.

What if my compliance matrix and deviation list disagree?

The evaluator will query it, and may assume the worse of the two. Avoid the problem by building the deviation list from the matrix: filter every row that is not marked complies or not applicable. Re-run the filter after every change. See the technical deviation list guide for the columns to carry over.

What does the EPC do with my compliance matrix?

The EPC's discipline engineer uses it to check coverage and to find the rows that need attention. Rows marked deviation or clarification get read first. Rows marked complies are spot-checked against your datasheets and evidence. The findings go into the technical bid comparison. See technical bid evaluation.

When is a requirement 'not applicable'?

Use not applicable only when the clause does not apply to the equipment offered, for example a gear-operator clause on a valve supplied with an actuator, or a sour-service clause on a non-sour duty. Add a short reason. Do not use it for requirements you would rather not meet; those are deviations.

How do I build one matrix from several specifications?

List every governing document first: requisition, project specification, owner standards, datasheets and addenda. Then give each requirement a row with its source document and clause. Where two documents state the same requirement, keep both rows or cross-refer them, so the evaluator sees you read both. Note the order of precedence at the top.

Can I reuse a compliance matrix from a previous tender?

Only as a starting point. Owner standards, project specifications and editions change between tenders, even for the same customer. Clause numbers shift, and a requirement you met last time may be stricter now. Re-check every row against the new package, and remove any row whose source is not in it.

Do commercial terms belong in the technical compliance matrix?

Usually not. Payment, warranty, liability and delivery terms are normally answered in a separate commercial response or exceptions list. Keep the technical matrix to equipment, tests, documents and scope. Follow the tender's instructions, though: some buyers ask for one combined table with separate sections.

Should VDRL and ITP requirements appear in the compliance matrix?

Yes. Documents on the vendor data requirements list and the tests and witness points in the inspection and test plan are part of the scope. Give them rows like any other requirement. Documents you cannot supply, or tests you do not normally do, are deviations to declare.

Who should review the compliance matrix before it is submitted?

A second engineer should review every row that is not marked complies, and every row about materials, tests and certificates. Quality should check certificate and inspection rows. Someone should also confirm that the matrix and deviation list match and that all revisions are current. Record who reviewed which part.

Does the compliance matrix matter after award?

Yes. It is the record of what was offered against each requirement. Some buyers attach the agreed version to the purchase order. Even when they do not, design, quality and project teams should build to it. Keep the final agreed revision with the order file, alongside the agreed deviation list.

Can RFP software build an engineering compliance matrix?

RFP and proposal tools are built to answer questionnaires from a library of approved text. An engineering matrix needs each clause compared with datasheets, materials and test records. Some teams use both: proposal software for narrative answers and an engineering review for the specification. See OdysseyGPT vs RFP software.

How does OdysseyGPT build a compliance matrix?

OdysseyGPT reads the whole tender package and checks each customer requirement against your own datasheets, standard specifications and test procedures. Each requirement gets one status: complies, deviates, clarification, not addressed, document requested, not applicable or out of scope. Each status comes with a quote and the page, sheet or cell it came from.

What does OdysseyGPT export, and who signs it off?

It exports an editable compliance matrix and a deviations and clarifications list, with internal to-dos on a separate sheet. Your engineers review the statuses, decide every open item and edit the wording before anything goes out. OdysseyGPT does not send anything to the customer, does not certify compliance and does not interpret drawings such as P&IDs.

Frequently asked questions

What is a compliance matrix?

A compliance matrix is a table that shows, requirement by requirement, how an offer or proposal meets a set of requirements. In equipment tenders it lists every specification clause with what is offered and a status.

What does a compliance matrix look like?

An engineering compliance matrix has columns for clause, requirement, offered value, status and a remark or reference, with one row per requirement. A proposal compliance matrix has columns for the RFP requirement and the proposal section that answers it.

Is a table of compliance the same as a compliance matrix?

Usually yes. Table of compliance is a common name in EPC requisitions for the same clause-by-clause statement.

What is the difference between a compliance matrix and a traceability matrix?

A compliance matrix states, at bid stage, whether the offer meets each customer requirement. A requirements traceability matrix links each requirement to the design, tests and documents that prove it during the project. Suppliers send the first with the bid; the second is usually kept after award.

Do I need both a compliance matrix and a deviation list?

Some tenders ask for both. The compliance matrix covers every clause; the deviation list carries only the exceptions with justification and cost of withdrawal. Build the matrix first and filter it.

References

Proposal compliance matrix

Loopio

Example of the proposal kind

Visit source

Compliance matrix glossary

RocketDocs

Visit source

API 682 Plan 53B

Swagelok

Visit source

Proposal engineer job description

Kowork

Visit source

Requirements traceability

Wikipedia

Origin of the RTM and the safety standards that require traceability

Visit source

Related Pages