The short answer

ASME Section VIII is the part of the ASME Boiler and Pressure Vessel Code that sets rules for building pressure vessels. Division 1 holds the general rules, Division 2 alternative rules and Division 3 rules for high-pressure vessels. A certified manufacturer builds under an Authorized Inspector, stamps the vessel and signs a data report.

Key Takeaways

  • Section VIII has three divisions. The datasheet should name one, with the edition.
  • Division 2 asks more of materials, design and NDE and allows higher design stresses in return.
  • The U, U2 and U3 designators show the manufacturer is certified by ASME for that division.
  • Owner specifications add requirements beyond the code. Those additions are where most deviations come from.

Free sample: a certificate check report. Send up to 20 material certificates and the PO. Get a certificate check report. Get the free result

What is ASME Section VIII?

The ASME Boiler and Pressure Vessel Code (BPVC) is published in numbered sections. Section VIII, Rules for Construction of Pressure Vessels, covers the design, fabrication, inspection, testing and certification of pressure vessels. "Construction" in the code means all of those steps, not only fabrication. ASME publishes a new edition every two years; the current one is the 2025 edition.

Section VIII does not work alone. It calls up Section II for materials, Section V for non-destructive examination and Section IX for welding qualifications. A tender that names Section VIII therefore brings those sections with it.

Division 1, Division 2 and Division 3 compared

The three divisions in outline (own summary; read the edition your contract names)
DivisionWhat it isTypical useCertification designator
Division 1The general rules for vessels at internal or external pressure above 15 psig, fired or unfired. Design is mostly by rules and formulae in the code.Most process vessels, separators, drums, columns and exchanger shellsU (and UM for miniature vessels)
Division 2, Alternative RulesAn alternative to Division 1. Requirements on materials, design and NDE are more rigorous, and higher design stresses are allowed. It has two classes and includes design by analysis.Thick-walled, large or high-pressure vessels where the saving in material justifies the extra engineeringU2
Division 3, Alternative Rules for High Pressure VesselsRules for vessels at pressures generally above 10,000 psi. It sets no upper limit for Divisions 1 or 2 and no lower limit for itself.High-pressure reactors and similar equipmentU3

The divisions are separate rule sets. A vessel is built to one of them. If the datasheet names Division 1 and you would rather offer Division 2, or the reverse, that is a deviation to raise at bid stage, not a detail to settle later. Division 2 also asks the user to provide a design specification and the manufacturer to produce a design report, so check who supplies what.

What does the U stamp mean?

"U stamp" is the everyday name for the ASME Certification Mark with the U designator. ASME certifies a manufacturer's quality control system, then issues a certificate of authorization that lets the manufacturer apply the mark to vessels built to Section VIII Division 1. Division 2 uses the U2 designator and Division 3 uses U3. ASME issues most of these certificates for three years, after which the manufacturer is reviewed again.

The mark on a nameplate is the manufacturer's statement that the vessel meets the code, made under the oversight of an Authorized Inspector. It is not a statement that the vessel meets the purchaser's specification. That is a separate check. See the glossary entry for the ASME U stamp.

The Authorized Inspector

A manufacturer that holds an ASME certificate must have an agreement with an Authorized Inspection Agency. The agency provides an Authorized Inspector (AI), who holds a commission from the National Board of Boiler and Pressure Vessel Inspectors. The AI is independent of the manufacturer. The AI checks that the code's requirements have been met, witnesses the inspections and tests the code assigns to the inspector, and signs the data report.

The AI works to the code. The customer's own inspector, or a third-party inspector the customer appoints, works to the purchase order and the ITP. Many vessels have both, and the ITP should show each party's hold and witness points in separate columns.

Manufacturer's data reports

When a vessel is complete, the manufacturer fills in a data report on an ASME form. It records the manufacturer, the purchaser, the code edition, the materials, the design conditions, the heat treatment, the examination and the test, and it carries certificates signed by the manufacturer and by the Authorized Inspector. For Division 1 the usual forms are U-1 and its shorter alternative U-1A. Parts made by another certified manufacturer come with a partial data report, form U-2 or U-2A. Divisions 2 and 3 have their own forms.

A manufacturer can also register the data report with the National Board, which gives the vessel a National Board number on its nameplate. Whether registration is required depends on where the vessel will be installed and on the purchase order, so check both. See manufacturer's data report.

What to check in a tender against ASME Section VIII

ASME Section VIII requirements to check before you quote
CheckWhy it matters
Division and edition named in the requisition, datasheet and specificationDocuments in one package often name different divisions or editions
Whether the Certification Mark is required, and whether your certificate covers the division and your shop locationA certificate is issued for a named scope and site
National Board registration, or registration with another authority at the place of installationIt changes the nameplate, the data report and the lead time for paperwork
Who provides the design basis: design conditions, loads, corrosion allowance and, for Division 2, the user's design specificationMissing design inputs turn into late changes
Material grades, supplementary requirements and impact testing beyond the codeThey change plate and forging price and delivery
Post-weld heat treatment required by the customer where the code would not require itFurnace time, and welding procedures qualified with heat treatment
NDE extent, method and acceptance criteria beyond the codeFull radiography or added UT changes cost and sequence
Welding requirements beyond Section IX, such as hardness limits or extra tests on procedure qualificationsExisting PQRs may not cover them, so new test welds are needed
Sour service, hydrogen service or other service requirements such as NACE MR0175Hardness, heat treatment and certificate statements follow from them
Material certificate type, positive material identification and third-party inspectionA 3.2 certificate must be arranged when the material is ordered
Pressure test requirements: medium, water quality, duration, witnessOwner specifications often add to the code test
Customer hold and witness points in addition to the Authorized Inspector'sNotice periods set the schedule
Documents to submit: calculations, drawings, ITP, WPS and PQR, and the record book indexThe document list is part of the price
Whether the vessel also needs CE or UKCA markingThe Pressure Equipment Directive is a separate legal route with its own assessment

OdysseyGPT's Document Review checks a customer's specification package against your own standard specification and datasheets and drafts the compliance matrix and deviation list, each row quoting its source. After the order, the ITP Validator (beta) checks the inspection and test plan against the customer's quality requirements, and the Welding Qualification Review (beta) checks WPS, PQR and welder records against the weld map.

What OdysseyGPT does not do

It does not do design calculations, and it does not decide whether a vessel meets the code. That is for your designers, your quality system and the Authorized Inspector. It checks documents against the written requirements you give it and quotes the source of every finding.

Try it on your own documents

Free sample: a certificate check report

Send up to 20 material certificates and the PO. Get a certificate check report.

Get the free result

Frequently asked questions

What is ASME Section VIII?

The section of the ASME Boiler and Pressure Vessel Code with rules for the design, fabrication, inspection, testing and certification of pressure vessels. It has three divisions: Division 1, Division 2 (alternative rules) and Division 3 (high-pressure vessels).

What is the difference between ASME Section VIII Division 1 and Division 2?

Division 1 holds the general rules, with design mostly by formula. Division 2 is an alternative with more rigorous requirements on materials, design and NDE, and it allows higher design stresses, which can reduce wall thickness on large or thick vessels.

What pressure does ASME Section VIII Division 1 apply to?

ASME describes Division 1 as covering vessels that operate at internal or external pressures above 15 psig. The code lists vessels it does not cover, so read the scope in the edition your contract names.

What is an Authorized Inspector?

An inspector employed by an Authorized Inspection Agency and commissioned by the National Board. The inspector is independent of the manufacturer, verifies that the code's requirements are met and signs the manufacturer's data report.

Is ASME Section VIII accepted in Europe?

A vessel for the EU market must meet the Pressure Equipment Directive. ASME Section VIII is not a harmonised standard, so using it gives no presumption of conformity. The manufacturer must show how each essential safety requirement is met, with a notified body where the category requires one.

References

BPVC Section VIII, Division 1: Rules for Construction of Pressure Vessels

ASME

Paid code. Scope summary from the public product page.

Visit source

BPVC Section VIII, Division 2: Alternative Rules

ASME

Paid code.

Visit source

BPVC Section VIII, Division 3: Alternative Rules for Construction of High Pressure Vessels

ASME

Paid code.

Visit source

Boiler and Pressure Vessel Certification

ASME

Lists the designators for each section and division.

Visit source

Commissioned Inspectors

National Board of Boiler and Pressure Vessel Inspectors

Visit source

Electronic Data Transfer (data report registration)

National Board of Boiler and Pressure Vessel Inspectors

Visit source

Related Pages