What is AWS D1.1?
AWS D1.1/D1.1M, Structural Welding Code - Steel, is published by the American Welding Society. AWS describes it as the code that sets the requirements for welding structural steel in load-bearing applications, and says it is used for buildings, bridges and infrastructure, and by equipment makers for skids, modules and equipment. It is not written for consumer products.
The code is broad. It deals with how welded connections are designed, how welding procedure specifications and welding personnel are qualified, how the work is fabricated, how it is inspected, and with stud welding and tubular structures. A fabricator working to D1.1 therefore finds procedure rules, workmanship rules and weld acceptance criteria in the same book.
D1.1 is one of a family. AWS publishes separate structural welding codes for other materials and uses, such as D1.2 for aluminium, D1.3 for sheet steel and D1.6 for stainless steel. If the take-off includes thin sheet or stainless steel, check which code the contract applies to those parts.
The code is a paid document and is revised every few years. When we checked in November 2026, AWS listed D1.1/D1.1M:2025 with a first amendment as the current edition. Clause numbers moved between recent editions, so an older specification may point to a clause that now has a different number. Work to the edition your contract names.
Prequalified and qualified-by-test procedures
Every production weld under D1.1 is made to a written welding procedure specification (WPS). The code offers two ways to arrive at one.
| Route | How it works | What the fabricator holds |
|---|---|---|
| Prequalified WPS | The code lists conditions for the welding process, the steel, the filler metal, the joint detail, preheat and other variables. A procedure that stays inside all of them is exempt from qualification testing | A written WPS. There is no test record behind it, so the WPS itself must show that each condition is met |
| WPS qualified by test | Anything outside the prequalified conditions is proved by welding a test piece and testing it | The WPS and a procedure qualification record with the test results |
Prequalification saves the cost of testing, which is why structural shops rely on it. It is also where audits find problems. A single variable outside the conditions, such as a joint detail, a process mode or a steel that is not on the code's list, means the procedure is not prequalified and needs a test. Not every welding process can be prequalified.
Customer specifications often narrow this. Some require every procedure to be qualified by test. Some add impact testing or hardness testing to the qualification. Either changes the price and the programme, so it belongs in the offer.
Welder qualification under D1.1
Welders, welding operators and tack welders are qualified by test. The test a welder passes sets what that welder may weld in production: the process, the positions, the thickness range and the type of joint. The contractor is responsible for qualifying its own welders and for keeping the records.
A qualification does not last by default. It stays valid only while the welder keeps using the process, which the contractor shows with a continuity record. If the record has a gap longer than the code allows, the welder has to requalify. The gap is the item an inspector asks to see first, so keep the log current. Our welder continuity log template gives a layout.
Customers sometimes ask for welder tests to be witnessed by their inspector or by a third party, or will not accept qualifications from a previous employer. Look for those sentences in the welding specification.
Who inspects what?
D1.1 separates two kinds of inspection. Understanding the split tells you which inspections you must price and which the customer may add.
| Role | Who it is | What it does |
|---|---|---|
| Contractor's inspection | The fabricator's or erector's own inspector | Inspects and tests the work during fabrication and erection. This is the contractor's responsibility unless the contract says otherwise |
| Verification inspection | An inspector acting for the owner or the Engineer | Checks the contractor's work and records. It is the owner's choice whether to use it |
| The Engineer | The owner's designated engineer | Approves matters the code leaves to engineering judgement, and specifies any NDT beyond visual inspection in the contract documents |
Inspectors must be qualified on a basis the code accepts. In practice many specifications ask for an AWS Certified Welding Inspector. NDT technicians need their own certification, and the specification usually names the scheme. Which welds get ultrasonic, magnetic particle or radiographic testing, and how many, is a contract matter. Find it in the drawings and the NDE specification, not only in the code.
AWS D1.1 vs ASME Section IX
| Question | AWS D1.1 | ASME Section IX |
|---|---|---|
| What is it? | A structural welding code for steel: design of welded connections, qualification, fabrication and inspection | A qualification standard for welding, brazing and fusing procedures and personnel |
| Where is it used? | Buildings, bridges, structural frames, and the steelwork of skids and modules | Pressure vessels, boilers and piping, when a construction code such as ASME B31.3 calls it up |
| Can a WPS be used without a qualification test? | Yes, if it meets every prequalification condition | Normally no. Each WPS rests on a PQR. Certain published standard procedures may be adopted under conditions the code sets |
| Where are production weld acceptance criteria? | In D1.1 itself | In the construction code that references Section IX |
| Do qualifications transfer? | Not automatically. Ask the Engineer before offering Section IX records | Not automatically. The construction code decides what it accepts |
A skid often carries both. The base frame is welded to D1.1 and the pipework on it to a piping code with Section IX qualifications. Keep the two sets of procedures and welder records separate in the dossier and say in the ITP which applies to which weld. For the piping side, see pipe spool fabricators.
What to check in a fabrication enquiry against AWS D1.1
| Check | Where to look | Why it matters |
|---|---|---|
| Edition of D1.1 | Fabrication specification, list of codes | Clause numbers and some rules differ between editions |
| Loading type: static or cyclic | Design drawings and general notes | The code treats cyclically loaded structures more strictly |
| Steel grades and thicknesses | Material take-off and drawings | They decide whether your procedures can be prequalified |
| Whether prequalified procedures are accepted | Welding specification | A requirement to qualify by test adds weeks and cost |
| Extra qualification tests | Welding specification | Impact or hardness tests may not be in your existing records |
| Welder qualification rules | Welding specification | Witnessed tests or project-specific tests need planning |
| NDT method, extent and personnel | NDE specification and drawing notes | The contract, not the code alone, sets how much testing is done |
| Verification inspection and hold points | Quality specification | The owner's inspector may hold fit-up, welding or coating |
| Other codes on the same job | Scope of work | Stainless, sheet steel, seismic or piping work may bring a second code |
| Records to submit | Documentation requirements | WPSs for approval before welding can hold the start of fabrication |
Our Document Review compares the customer's welding and fabrication specifications with your own procedures and quotes both sides for each difference. After award, the Welding Qualification Review (beta) checks the procedures, qualification records and welder records you upload against each weld in the weld log. It does not decide whether a WPS is prequalified and it does not write procedures. A welding engineer does that.
Try it on your own documents
Free sample: a certificate check report
Send up to 20 material certificates and the PO. Get a certificate check report.