A process or utility system built in a shop on a steel base frame, with its equipment, piping, instruments and wiring installed and tested before it is shipped as one unit.

Last reviewed by the OdysseyGPT team

What it is

A skid package is a process or utility system built on a structural steel base frame in a fabrication shop. Equipment, piping, instruments and wiring are installed and tested before shipment, and the unit is delivered to site in one piece. Its dossier combines structural, piping, mechanical and electrical and instrumentation records.

Key Takeaways

  • A skid is shop-built and shop-tested, then installed as one unit.
  • The frame, the pipework and the equipment each follow a different code.
  • Sub-supplier data books are the usual cause of a late dossier.
  • State in the ITP which code governs which weld.

Why it matters

A skid package, also called a packaged skid or skid-mounted unit, is a complete piece of plant assembled on a structural steel frame. Typical examples are chemical injection skids, metering skids, pump skids and filtration or fuel gas units. The frame, or skid, carries the equipment, the interconnecting pipework, valves, instruments, junction boxes and cabling. The package is built and tested in the fabricator's shop, then lifted or rolled into place on site and connected at a small number of tie-in points. A larger unit of the same kind, often with several levels, is usually called a module. Buyers choose skids because shop assembly and testing are easier to control than site work. For the builder, the difficulty is that one purchase order now covers several disciplines, each with its own codes and records. The base frame is structural steelwork, welded to a structural welding code and often fitted with certified lifting points. The pipework follows a piping code with its own welding qualifications, examination and pressure testing. Vessels, pumps and exchangers arrive with data books from their own makers. Instruments and electrical equipment bring calibration certificates, datasheets and, where the area is hazardous, equipment certificates. The customer expects all of this in one dossier, indexed to its own structure, together with the factory acceptance test report. Most late dossiers are late because of sub-supplier documents, so a skid builder tracks those from the day of order.

How OdysseyGPT uses it

OdysseyGPT does not design skids, read general arrangement drawings or P&IDs, or track assembly. It checks the documents of a package against the customer's requirements. VDRL/MDR Tracker (beta) reports documents that are late or missing from the register. MRB Readiness Check (beta) compares the dossier folder, including sub-supplier data books, with the customer's index. Welding Qualification Review (beta) and NDE Coverage Review (beta) check welding and examination records from the weld logs you supply. Every finding quotes its source.

Evaluation questions

Why do buyers ask for packaged skids?

Assembly, welding, testing and painting are easier to control in a shop. Site work is reduced to setting the unit down and connecting the tie-in points.

Who is responsible for sub-supplier documents on a skid?

The skid builder, as the holder of the purchase order. The customer expects one complete dossier and will not chase the pump or instrument supplier.

Does OdysseyGPT read skid drawings or P&IDs?

No. It reads text and tables: specifications, registers, weld logs, certificates and reports. It checks those against the customer's requirements and the dossier index.

Frequently asked questions

What is a skid package?

A process or utility system assembled on a steel base frame in a shop, with equipment, piping, instruments and wiring fitted and tested, then delivered to site as one unit.

What is the difference between a skid and a module?

Mostly size. A skid is a single-lift unit on a base frame. A module is a larger pre-assembled structure, often with several levels and more than one system. The documentation is of the same kind.

Which codes apply to a skid?

Several at once. The frame follows a structural code, the pipework a piping code, vessels a pressure vessel code, and the electrical and instrument items their own standards. The contract names each one.

What is in a skid's final dossier?

Structural, piping, mechanical and E&I records under one index: welding and material records, NDE and test reports, sub-supplier data books, calibration and equipment certificates, coating records and the acceptance test report.