What is EN 1090?
EN 1090, Execution of steel structures and aluminium structures, is a series of European standards. "Execution" means everything done to turn a design into a finished structure: buying materials, cutting, welding, bolting, surface treatment, erection and inspection. A fabricator mostly meets three parts.
| Part | Subject | What it means for a fabricator |
|---|---|---|
| EN 1090-1 | Requirements for conformity assessment of structural components | The route to a declaration of performance and CE marking. It requires a certified factory production control system |
| EN 1090-2 | Technical requirements for steel structures | The rules the shop works to: materials, cutting, welding, bolting, tolerances, surface treatment, inspection and documentation |
| EN 1090-3 | Technical requirements for aluminium structures | The equivalent of part 2 for aluminium work |
Part 1 leans on part 2. A fabricator shows that its components perform as declared by making them to the technical rules of part 2, under a controlled system. National standards bodies publish the series under their own prefix, such as BS EN 1090 in the UK. The parts are paid documents with different edition dates. Use the editions your contract names.
Execution classes EXC1 to EXC4
EN 1090-2 does not apply one level of control to every structure. It defines four execution classes, EXC1 to EXC4. The requirements become stricter as the number rises. The class changes practical things: how much welds are inspected, how far materials are traced, what welding quality system is needed and how much is documented.
- The designer or structural engineer specifies the class, based on the consequences of failure and how the structure is loaded and made. The fabricator does not choose it.
- A class can apply to the whole structure, and a different class can be given to particular components or details.
- UK industry guidance says EXC2 suits most buildings, and warns against adding higher-class requirements to an EXC2 job without reason.
- One certification body gives agricultural buildings as an example of EXC1, residential and commercial buildings for EXC2, bridges for EXC3 and special structures such as long-span bridges for EXC4. These are illustrations, not rules.
- A fabricator's certificate states the highest class it covers. A shop certified for EXC3 can take EXC1, EXC2 and EXC3 work. A shop certified for EXC2 cannot take EXC3 work.
If an enquiry calls up EN 1090-2 and gives no execution class, raise a clarification. Do not price on a guess. The selection method and the requirements for each class are in the standard, and this page does not reproduce them.
Welding under EN 1090-2
Welding is treated as a process that needs its own management system. Fabricators run a welding quality system to the relevant part of ISO 3834, and the part depends on the execution class. From EXC2 upwards the welding is controlled by a responsible welding coordinator, whose required technical knowledge also depends on the class, the steels and the thicknesses.
The supporting standards are from the ISO family and differ from the American ones. Welding procedures are written and qualified to the ISO 15609 and ISO 15614 series, welders are qualified to ISO 9606-1, and NDT personnel to ISO 9712. Every weld is visually inspected. Further NDT depends on the execution class and the type of joint. For how this compares with the American approach, see AWS D1.1.
Factory production control and the notified body
Factory production control, or FPC, is the fabricator's own documented, permanent, internal control of production. Under EN 1090-1 it covers how the shop controls design input where it does design, purchasing, materials, welding, equipment, inspection and non-conforming work.
| Party | Task |
|---|---|
| The fabricator | Runs the FPC system, carries out the initial assessment of its products, tests in line with its own plan, appoints a responsible welding coordinator, and issues the declaration of performance |
| The notified body (EU) or approved body (UK) | Inspects the plant and the FPC system at the start, then carries out continuing surveillance. It issues an FPC certificate and a welding certificate that states the execution class covered |
| The customer or main contractor | Checks that the certificates are in date, name the right body and cover the project's execution class and materials |
The body certifies the system, not each beam. It does not inspect your project and it does not sign the declaration. That responsibility stays with the fabricator.
Declaration of performance and CE marking
EN 1090-1 is a harmonised standard under the EU Construction Products Regulation. Where a construction product is covered by a harmonised standard, the manufacturer draws up a declaration of performance when placing it on the market. CE marking is affixed only to products that have one. By affixing it, the manufacturer takes responsibility for the product matching the declared performance. CE marking has been mandatory for fabricated structural steelwork in the EU since 1 July 2014.
The declaration identifies the product type and its intended use, the manufacturer, the assessment system, the notified body and the declared performance for the essential characteristics. For a customer, the useful checks are whether it names the project's execution class and whether its materials cover what is on the drawings.
The regulation is changing
A revised Construction Products Regulation, Regulation (EU) 2024/3110, entered into force on 7 January 2025, and most of it applies from 8 January 2026. The Commission says products covered by a standard cited under the 2011 regulation generally stay under the 2011 rules until a new harmonised standard for that product family is cited, with a transition period of at least a year. When we checked in November 2026 we found no revised EN 1090-1 cited under the new regulation. Check the Commission's pages and your notified body before you rely on this.
The UK position: UKCA and CE
BS EN 1090-1 is a UK designated standard as well as a European harmonised one. Since 1 January 2021, Great Britain has had its own construction products regime with the UKCA mark, and UK notified bodies became UK approved bodies.
- The government's guidance, last updated on 21 May 2025 when we read it, says CE marking continues to be recognised for construction products in Great Britain, following a ministerial statement of 2 September 2024. Its longer-term future depends on wider reform of the construction products regime.
- UKCA marking is available and needs a UK approved body. CE marking needs a body recognised in the EU.
- A fabricator that applies both marks needs declarations of performance that meet both the GB and the EU requirements.
- Northern Ireland follows different rules. Products there carry CE marking, or CE with the UK(NI) indication when a UK body did the assessment. UKCA alone is not valid there.
Some certification bodies' web pages still describe an end date for CE recognition that the government later withdrew. Treat the gov.uk guidance as the reference and read it again before each tender, because this area has changed several times.
What to check in a tender that calls up EN 1090
| Check | Where to look | Why it matters |
|---|---|---|
| Execution class, for the structure and for any special components | Fabrication specification and drawing notes | It sets inspection, traceability and welding control. Missing means a clarification |
| Your certificate against the class and materials | Your FPC and welding certificates | You cannot declare performance outside their scope |
| Edition of each part named | List of standards | Editions differ, and the contract edition governs |
| Marking required: CE, UKCA or both | Commercial and quality sections | It decides which body's certificate and which declaration you need |
| Options and additions the specifier has chosen | Project specification | EN 1090-2 leaves many choices to the specification. Each is a possible cost |
| Traceability level | Fabrication specification | Higher classes and some customers want pieces tied to inspection documents |
| Inspection document type for steel and bolts | Material section | See EN 10204 3.1 vs 3.2 |
| NDT beyond the standard | Welding and NDE specification | Extra extent or methods need pricing and a named personnel scheme |
| Tolerances beyond the standard ones | Fabrication specification and drawings | Tighter limits affect fit-up, trial assembly and survey |
| Corrosion protection | Coating or galvanising specification | The system, the inspection and who repairs damage after erection |
| Subcontracted work | Your own plan | Coating, galvanising or NDT done by others still sits under your FPC |
| Records to hand over | Documentation requirements | Certificates, declaration of performance, welding and inspection records |
The Customer Specification Review (beta) lists the requirements in a specification package and marks the ones that are unclear or missing, such as an execution class that is never stated. Document Review compares the package with your own procedures and quotes both. Neither assesses your FPC system or tells you which execution class a structure should have. That is the designer's decision and the certification body's assessment.
Try it on your own documents
Free sample: a certificate check report
Send up to 20 material certificates and the PO. Get a certificate check report.