What it is

Factory production control (FPC) is a manufacturer's documented, permanent and internal control of production. For structural steelwork under EN 1090-1, a notified or approved body inspects the fabricator's plant and FPC system and issues certificates. The fabricator can then draw up a declaration of performance and apply CE or UKCA marking.

Key Takeaways

  • FPC is the fabricator's own system, defined in the Construction Products Regulation.
  • An independent body certifies the system and repeats the check through surveillance.
  • The certificates state the execution class the fabricator may supply.
  • The fabricator, not the body, is responsible for the declaration of performance.

Why it matters

Factory production control, or FPC, is a term from the Construction Products Regulation. The regulation defines it as the documented, permanent and internal control of production in a factory, in line with the relevant harmonised technical specification. For structural steel components that specification is EN 1090-1. In plain terms, FPC is the fabricator's own system for making sure that what leaves the shop matches what it declares. It resembles a quality management system with a welding quality system added. It covers how the shop reviews what the customer asked for, buys and identifies steel, controls welding and bolting, keeps equipment fit for use, inspects the work and deals with non-conforming product. For welding, the fabricator appoints a responsible welding coordinator. Fabricated steelwork is assessed under a system in which the fabricator and an independent body share the tasks. The fabricator runs the FPC and tests its own products. A notified body in the EU, or an approved body in the UK, inspects the plant and the FPC system at the start and then carries out regular surveillance. If the system passes, the body issues an FPC certificate and a welding certificate that states the execution class covered. With those in place the fabricator can draw up a declaration of performance and apply the CE or UKCA mark. The body certifies the system. It does not inspect each project, and the fabricator stays responsible for the declaration. A buyer checking a fabricator should ask for the FPC certificate, the welding certificate and the declaration of performance, and confirm that they are in date and cover the project's execution class and materials.

How OdysseyGPT uses it

OdysseyGPT does not audit or certify factory production control, and it does not issue a declaration of performance. It checks the project records your system produces against the customer's requirements. ITP Validator (beta) compares your inspection and test plan with the customer's quality specification. Material Certificate Review (beta) checks mill certificates against the order. MRB Readiness Check (beta) checks the dossier against the customer's index. Each finding quotes its source, and your engineers decide.

Evaluation questions

Which documents show a fabricator has certified FPC?

The FPC certificate and the welding certificate from the notified or approved body, and the fabricator's own declaration of performance. Check the dates, the body's number, the execution class and the materials covered.

Does FPC cover work a fabricator subcontracts?

The fabricator declares the performance of the finished component, so subcontracted steps such as coating or testing have to be controlled within its system. Ask how the shop controls them.

Does OdysseyGPT audit factory production control?

No. It checks project documents against the customer's requirements and reports gaps with quotes. Auditing and certifying the system is the certification body's work.

Frequently asked questions

What is factory production control?

The manufacturer's own documented, permanent, internal control of production. For structural steelwork it is the system a fabricator runs to EN 1090-1 so that its components match their declared performance.

Who certifies a fabricator's FPC?

A notified body in the EU or an approved body in the UK. It inspects the plant and the system, carries out surveillance, and issues an FPC certificate and a welding certificate.

Is FPC the same as ISO 9001?

No, although they overlap. FPC is specific to the product standard and, for steelwork, includes a welding quality system and a responsible welding coordinator. ISO 9001 certification alone does not allow CE or UKCA marking.

Does the certification body inspect each project?

No. It assesses the production control system and the plant. The fabricator is responsible for each project's conformity and signs the declaration of performance.

References

Regulation (EU) No 305/2011 (Construction Products Regulation)

EUR-Lex

Definition of factory production control and the rules on the declaration of performance.

Visit source

UKCA marking of fabricated structural steelwork

SteelConstruction.info (BCSA and SCI)

The fabricator's and the approved body's tasks, and the certificates issued.

Visit source

Construction Products Regulation in Great Britain

GOV.UK

UK approved bodies and the UKCA and CE marks.