Download the welder continuity log
XLSX
Welder continuity log (Excel)
Header block, 12 columns, status drop-down, Lapsed rows in red and Due soon and Check rows in amber, frozen header row, filters and a How to use sheet.
CSV
Welder continuity log (CSV)
The example rows as plain CSV (UTF-8), for Google Sheets or any other tool.
Both files are free under CC BY 4.0, with no form to fill in. The XLSX opens in Excel, Google Sheets, LibreOffice and Numbers. The CSV carries the table only; the header block is in the XLSX.
What it is for and who uses it
A welder's performance qualification (WPQ) does not stay valid on its own. Welding codes set how often a welder must use a process, and how that is confirmed, for the qualification to stay current. Customers and inspectors ask for the record that shows it. The continuity log is that record.
- Welding coordinators, who maintain the log.
- Welding engineers, who review it and decide on unclear entries.
- Quality engineers and inspectors, who check a welder was current on the weld date.
Codes differ on the interval, on who may confirm an entry and on whether the qualification must also be revalidated at set intervals. Many shops work to a six-month period, but check your governing code and the contract; do not take the interval from this page.
Header block
| Field | Example |
|---|---|
| Manufacturer | Example Fabricator Ltd (fictional) |
| Works | Example Works (fictional) |
| Governing welding code | As the PO or quality system states (for example ASME Section IX or ISO 9606-1) |
| Continuity interval used | 6 months in this example only; take the interval and rules from your governing code |
| Log no. | WCL-EX-2027 |
| Status date | 2027-02-03 |
| Maintained by | Welding coordinator |
| Reviewed by | Welding engineer |
Example rows: six welder and process entries
| Welder | WPQ no. | Process | Process last used | Evidence of use | Next confirmation due | Status | Remarks |
|---|---|---|---|---|---|---|---|
| WX-07 | WPQ-EX-207 | SAW | 2027-01-22 | PO-EX-4410 weld W1; weld log WL-EX-4410 | 2027-07-22 | Current | |
| WX-09 | WPQ-EX-209 | SAW | 2026-07-14 | Job JOB-EX-0790; weld log WL-EX-0790 | 2027-01-14 | Check | No record of SAW between 2026-07-14 and weld W2 on PO-EX-4410. Find the evidence, or the welding engineer decides what the governing code requires. |
| WX-12 | WPQ-EX-212 | GTAW | 2027-01-27 | PO-EX-4410 weld W4, root; weld log WL-EX-4410 | 2027-07-27 | Current | |
| WX-12 | WPQ-EX-212 | SMAW | 2027-01-27 | PO-EX-4410 weld W4, fill and cap; weld log WL-EX-4410 | 2027-07-27 | Current | |
| WX-15 | WPQ-EX-215 | GTAW | 2026-08-20 | Job JOB-EX-0812; weld log WL-EX-0812 | 2027-02-20 | Due soon | Assign GTAW work and record it before 2027-02-20. |
| WX-04 | WPQ-EX-204 | SMAW | 2026-05-11 | Job JOB-EX-0755; weld log WL-EX-0755 | 2026-11-11 | Lapsed | No SMAW recorded since 2026-05-11. Do not assign SMAW work until the welding engineer confirms what the governing code requires. |
The file also has columns for qualification date, who confirmed the entry and when. The next confirmation dates use a six-month interval as an example only. Every example value is invented: the project, customer, bidders, purchase order, prices and every document, certificate, serial and report number do not exist. Standards are named but not quoted.
Columns and what to write
| Column | What to write |
|---|---|
| Entry | Running number. One row per welder and process. |
| Welder / operator ID | Welder or welding operator stamp. |
| WPQ no. | The performance qualification record the row keeps current. |
| Process | Welding process, one per row. A welder qualified in two processes has two rows. |
| Qualification date | Date of the qualification test (YYYY-MM-DD). |
| Process last used | The latest date the welder used the process (YYYY-MM-DD). |
| Evidence of use | The record that shows it: job, weld number, weld log, NDE report or production record. |
| Confirmed by | The person your governing code and quality system authorise to confirm continuity. |
| Date confirmed | Date the entry was confirmed (YYYY-MM-DD). |
| Next confirmation due | The date by which the process must be used or confirmed again. Work it out from your governing code; the template does not calculate it. |
| Status | Current, Due soon, Check or Lapsed (drop-down). Lapsed rows turn red; Due soon and Check rows amber. |
| Remarks | What is missing and the action. |
Status values
| Status | Meaning |
|---|---|
| Current | The process was used and confirmed inside the interval your governing code sets. |
| Due soon | The next confirmation date is close. Assign work in the process, or arrange the confirmation. |
| Check | A record is missing or unclear. The welding engineer or coordinator decides. |
| Lapsed | The next confirmation date has passed with no evidence of use. Follow the governing code before the welder uses the process again. |
How to use the template
- Fill in the header with the welding code that governs welder qualification on your work, and the continuity interval and rules that code sets. Codes differ; check your own licensed copy and the contract.
- Add one row per welder and process. A welder qualified in two processes has two rows.
- Each time you update the log, enter the latest date the welder used the process and the record that shows it: a job and weld number, weld log, NDE report or production record.
- Have the person your code and quality system authorise confirm the entry, and enter the date.
- Enter the next confirmation date, worked out from your governing code. The template does not calculate it.
- Set the status. Lapsed rows turn red; Due soon and Check rows amber. Review the log often enough that no date passes unnoticed.
- Before a welder starts a job, check the row for that process is Current on the planned weld date.
- Ask a qualified welding engineer or coordinator to review the log. It supports their decision; it does not replace it. Some codes also require the qualification itself to be revalidated at set intervals; record that separately.
Checking welding records from the documents
In OdysseyGPT's Manufacturing QA module, Welding Qualification Review (beta) reads the weld map, WPSs, PQRs and welder qualifications and flags the welds whose records do not line up. Every finding cites the page it came from, and your engineers decide what to do with it. Tools marked beta are open on request, and we onboard each team ourselves. For the method, see how to check WPS, PQR and WPQ against a weld map.
Want us to run the check for you?
Send up to 20 material certificates and the purchase order. We send back a certificate check report, each finding cited to its page.