The short answer

Crane makers answer an enquiry by checking the customer's specification against their standard design: duty classification, capacity and span, site standards, controls and safety functions, and the documents required. After award they owe a calculation summary, certificates for load-bearing parts, welding and NDE records, a load test certificate, electrical test records, a declaration of conformity and instructions.

Key Takeaways

  • The duty classification decides the size of the structure and the mechanisms. A crane priced to the wrong class is the wrong crane.
  • Many customer specifications put site electrical and controls standards on top of the crane standard. Those clauses hold most of the deviations.
  • The buyer needs your documents for their own legal duties, such as thorough examination in Great Britain.
  • OdysseyGPT checks documents against the customer's requirements. It does not do crane calculations or load tests.

See how OdysseyGPT reviews a tender. Tell us how your team reviews tenders today. We can walk through an example together. Book a call

How do crane makers answer a customer's specification?

Most cranes are built from a maker's standard range: a girder family, a hoist family, a control package. The customer's specification was written for a building and a process, not for your range. The sales engineer's work is to find each place where the two do not meet, and to decide whether to change the crane, raise the price or write a deviation.

The subjects a crane enquiry usually covers, and what to settle on each
SubjectWhat the customer statesWhat to settle before you quote
Duty classificationA class or group for the crane and for each mechanism, or the working cycles and loads it is based onDoes the system the customer names match the one your calculations use? If only the process is described, who derives the class?
Capacity, span and liftRated capacity, span, height of lift, hook approaches, speeds and any second hoistIs the capacity for the hook alone, or does it include a lifting beam, grab or magnet below it?
The building and runwayRunway rails, the clearances available, the power supply and the wheel loads the structure can takeWho supplies the runway, the rails and the conductor system, and who checks the building for your wheel loads?
Site standardsThe plant's own rules for motors, cabling, panels, paint, access and guardingWhich site standards are in the package, and which are named but not attached?
Controls and safety functionsControl mode, limit switches, overload protection, anti-collision, zone restrictions and any required performance level for a safety functionIs each function in your standard package, an option or a one-off design?
EnvironmentIndoor or outdoor, temperature range, dust, corrosion, hazardous areasDoes any clause take the crane outside your standard components?
TestsWorks tests on the hoist, tests after erection, and who attendsWho provides the test loads on site, and is an overload test part of the handover?
Documentation requirementsThe list of documents, the language, the format and when each is dueWhich documents need approval before fabrication starts?

Read the classification clause first and the documentation clause second. The first sets the steel and the machinery. The second sets the hours your office will spend after the crane is built. A customer who wants full calculations where you normally issue a summary has asked for something that needs a price or a deviation.

Which standards and rules come up in crane enquiries?

Standards and rules often named in crane and lifting equipment enquiries (own summary at name level; use the edition your contract names)
DocumentWhat it isWhere it bites
EN 13001 seriesThe European series for the general design of cranes: principles, load actions and proof of competence for structures and componentsThe structural and mechanical calculations behind a crane sold in Europe
EN 15011The European product standard for bridge and gantry cranesThe safety requirements for the finished crane, with the checks used to verify them
ISO 4301The ISO series on the classification of cranes and mechanisms by service conditionsThe class the customer writes into the enquiry
FEM 1.001The European Materials Handling Federation's rules for the design of hoisting appliancesOlder specifications and many hoist catalogues still state FEM groups
Machinery Directive and Machinery RegulationThe EU law for placing machinery, including lifting machinery and lifting accessories, on the marketRisk assessment, technical file, instructions, declaration of conformity and CE marking
ASME B30 seriesThe American safety standard for cranes, hoists, hooks, slings and related equipment, published in separate volumes by equipment typeNorth American enquiries name the volume for the equipment, such as the ones for overhead and gantry cranes, hoists or below-the-hook lifting devices
ASME BTH-1ASME's design standard for below-the-hook lifting devicesDesign of lifting beams, spreaders and similar devices for the North American market
CMAA specificationsThe Crane Manufacturers Association of America's specifications for electric overhead travelling cranes: No. 70 for multiple girder cranes and No. 74 for single girder cranesNorth American enquiries state a service class and expect the crane to follow the specification
LOLERThe Lifting Operations and Lifting Equipment Regulations 1998 in Great BritainThey bind the user, not the maker. They explain why a British buyer asks for certain documents

Classification systems do not convert cleanly. An ISO class, a FEM group and a CMAA service class are built on different definitions, and published comparison charts are approximations. If the customer names one system and your range is rated in another, state the class you offer in the customer's system and say how you arrived at it. All of these standards are paid documents. This page gives their names and subjects, not their content.

What goes in a crane maker's deviation list?

A crane deviation list is rarely about whether the crane can lift the load. It is about how the customer wants it built and proved. The rows tend to fall under these headings.

  • Classification: the customer asks for a higher class on one mechanism than your standard hoist carries, or names a classification system you do not design to.
  • Design standard: the specification mixes families, for example a European crane standard with an American service class, and you state which one governs your calculations.
  • Deflection, speeds and positioning: limits tighter than your standard girder or drive gives.
  • Components: a named make of motor, brake, gearbox, drive, rope or pendant where you fit your own or another supplier's.
  • Electrical and controls: site standards for cable types, enclosure ratings, panel layout, spare capacity or a safety function your control package does not include.
  • Access and maintenance: walkways, platforms and service points beyond the standard arrangement.
  • Materials and inspection: certificate types for load-bearing steel, extra NDE on girder welds, or witness points you do not normally offer.
  • Testing: an overload test at a level or in a way that differs from your procedure, or test loads the customer expects you to supply.
  • Documents: full calculations where you issue a summary, native drawing files, or approval of drawings before fabrication.

Each row should quote the clause and your alternative, with a reason. The layout is in the technical deviation list guide. Once the order is placed, the Deviation Register (beta) keeps the agreed rows in one place, so the design office works to the negotiated position.

Which documents does a crane maker deliver after award?

Records a crane buyer commonly asks for, and where they go wrong
DocumentWhat it showsCommon gap
Calculation summaryThe classification used, the load cases considered and the result for the main structure and mechanismsA summary that states a different class from the one in the order
Material certificates for load-bearing partsGrade and test results for girder plate, end carriages, hooks, ropes and lifting lugsA hook or rope certificate whose serial number is not the one fitted. See EN 10204 3.1 vs 3.2
Welding and NDE recordsProcedures, welder qualifications and examination reports for the welds the specification picks outGirder butt welds examined to a lower extent than the customer's clause
Load test certificateThe crane's identity, the loads applied, the tests carried out, the date and who witnessed themA certificate for the hoist unit only, where the order asks for a test of the erected crane
Electrical test recordsInsulation, protective bonding and function checks, including limit switches and emergency stopSafety functions listed in the specification that the test sheet never mentions
Declaration of conformityThe maker's formal statement that the machine meets the law that applies, with the standards usedA declaration that describes a different model or rated capacity
InstructionsOperation, maintenance, inspection intervals and limits of use, in the language requiredA generic manual that does not cover the options fitted
Documents for the user's examination regimeThe information a competent person needs: identity, safe working load, configuration, test results and the maker's inspection guidanceMarking on the crane that does not match the paperwork

A crane is often tested twice: the hoist in the works, and the whole crane after erection on the customer's runway. The second test depends on someone else's building. Say in the offer which tests you do where, and which certificate covers each. Buyers in Great Britain will also arrange a thorough examination after installation, and their examiner will ask for your documents. The load test certificate checklist lists the fields worth checking before the certificate leaves your office.

How does OdysseyGPT help?

OdysseyGPT compares one set of documents with another and shows the words behind every finding. For a crane maker that means the customer's specification on one side and your standard specification, offer or records on the other. An engineer reads each finding and decides. It works on text and tables. It does not open general arrangement drawings, and it does no calculation.

Crane and lifting equipment documents and the OdysseyGPT tool that checks them
StageYou uploadToolYou get
EnquiryThe crane specification and site standards, with your standard technical specificationDocument ReviewEach customer requirement set beside your statement on it, marked as complies, deviates, not addressed or needing clarification
EnquiryThe customer's package on its ownCustomer Specification Review (beta)A list of requirements by type, with gaps flagged, such as a site standard that is named and not attached
OrderThe specification, your offer and the clarification lettersDeviation Register (beta)One register of the agreed deviations
OrderThe customer's document list and the order's documentation clausesVDRL/MDR Tracker (beta)A register of every document owed, with late and missing items flagged
ManufactureThe customer's quality requirements and your inspection and test planITP Validator (beta)Inspection stages the plan omits and witness points shown at a lower level
ManufactureCertificates for plate, hooks and ropes, with the purchase requirementsMaterial Certificate Review (beta)Grades, certificate types and required tests that do not match the order
ManufactureWelding procedures, welder records and the weld list as a tableWelding Qualification Review (beta)Welds outside a procedure's range and welders without a valid qualification on the day
ManufactureThe weld list and the NDE reportsNDE Coverage Review (beta)Welds that need examination and have no report, or the wrong method
Before the testThe test procedure, the plan, calibration evidence and the open non-conformance listFAT Readiness Check (beta)What would stop the test, kept apart from items to review
After the testTest reports and the calibration certificates for load cells and instrumentsCalibration Validity Check (beta)Instruments on a test report with no certificate, or a certificate that had expired on the test date
HandoverThe customer's document index and your document folderMRB Readiness Check (beta)Index lines with nothing behind them and documents at an old revision

The load test certificate itself has no dedicated check. Document Review can compare its stated capacity, identity and test description with the order and the test procedure, and report where the wording differs. It cannot tell you whether the test was done properly.

What does a result look like for a crane enquiry?

This example is invented. The specification number, clause numbers, crane data and document names were made up for this page. It shows the layout of a Document Review result.

Invented example: a customer's overhead crane specification (CS-CR-014) checked against a maker's standard technical specification (TS-EOT-07)
Customer requirement (quoted)Maker's document (quoted)StatusNote
§3.1, p. 5: "Rated capacity 20 t at the hook. Span 22.5 m."§2.1, p. 3: "Rated capacity: 20 t. Span: 22.5 m."CompliesSame capacity and span.
§3.4, p. 6: "Hoist mechanism classification shall be M6 to ISO 4301-1."§2.3, p. 4: "Hoist mechanism group: M5."DeviatesThe standard hoist is stated one group below the class asked for.
§5.2, p. 11: "All motors shall comply with site standard ES-MOT-03."§4.1, p. 8: "Motors to manufacturer's standard, IP55."ClarificationES-MOT-03 is not in the package. Ask the customer for it.
§6.3, p. 14: "An anti-collision system shall prevent contact with the adjacent crane on the same runway."No matching statement found.Not addressedThe standard specification does not mention anti-collision.
§7.1, p. 16: "Girder butt welds shall be 100% ultrasonically examined."§6.2, p. 12: "Butt welds in tension flanges: ultrasonic examination, 10% sample."DeviatesThe sample extent is lower than the full examination asked for.
§8.2, p. 19: "After erection the crane shall be load tested in the presence of the purchaser. The supplier shall provide test loads."§7.4, p. 15: "Site load test with test loads provided by the purchaser."DeviatesThe two documents place the supply of test loads on different parties.
§9.1, p. 21: "Documentation shall include the structural calculations for the bridge girders."§8.1, p. 17: "A calculation summary is supplied with the documentation."ClarificationA summary may not satisfy a request for the calculations. Confirm what the customer will accept.
§9.4, p. 22: "Operating and maintenance instructions shall be in English."§8.3, p. 17: "Instructions are supplied in English."CompliesSame language.

Each row carries the clause and page on both sides, so the sales engineer can check it in a minute. The status is a proposal. Whether a row becomes a deviation, a price addition or a design change is your decision.

Where OdysseyGPT falls short

  • It does no crane design. It does not classify a crane, calculate a girder, select a rope or check a design against EN 13001, CMAA or any other standard.
  • It does not read general arrangement drawings, clearance diagrams or electrical schematics. Data on a drawing has to reach it as text or a table.
  • It does not perform or witness a load test, and it cannot confirm that a test was carried out as the certificate says.
  • It does not carry out a thorough examination and is not a competent person under LOLER.
  • It does not assess a safety function or its performance level, and it does not replace your risk assessment.
  • It does not issue or validate a declaration of conformity or a CE or UKCA mark. It can report what a declaration says against what the order says.
  • It sees only what you upload. If a site standard is named in the specification and missing from the package, it will say so and cannot check against it.
  • A fair trial is an enquiry you have already answered: run it and compare the result with the deviation list you wrote by hand.

Which tools are available now

Document Review is generally available. The other tools named on this page are in beta: you ask for access and we set each team up ourselves. See the tender module and OdysseyGPT for manufacturing.

Talk through your tender review

See how OdysseyGPT reviews a tender

Tell us how your team reviews tenders today. We can walk through an example together.

Book a call

Buyer questions

20 questions bid engineers, proposal engineers and buyers ask. Last reviewed:

What does crane specification compliance mean for a manufacturer?

It means showing, clause by clause, where your crane meets the customer's specification and where it does not. You compare the specification with your standard design, mark each requirement as met, not met or unclear, and list the differences as deviations or clarifications in the offer. After award, it means delivering records that prove what you promised.

What documentation is required with an overhead crane?

The order sets the list. Buyers commonly ask for a calculation summary, certificates for load-bearing steel, hooks and ropes, welding and NDE records, a load test certificate, electrical test records, a declaration of conformity and instructions. Check the documentation clause for the language, the format and which documents need approval before you start fabrication.

What is in a typical crane enquiry package?

Usually a technical specification or data sheet with capacity, span, lift height, speeds and duty classification, a description of the building and runway, the site's electrical and general standards, testing requirements and a list of documents. Some packages name site standards without attaching them. Ask for every referenced document before you price, because the costly clauses are often in those.

What is a crane duty classification?

It is a class that describes how hard the crane will work: how many lifting cycles it will perform over its life and how heavy the typical load is compared with the rated capacity. The class drives the fatigue design of the structure and the choice of mechanisms. The customer should state it, because only the customer knows the process.

Can we convert between ISO, FEM and CMAA crane classes?

Only approximately. The systems are built on different definitions, and published comparison charts are guides, not equivalences. If the customer names one system and your range is rated in another, state the class you offer in the customer's terms, explain how you derived it and ask for written acceptance. Do not leave the conversion unstated in the offer.

What if the enquiry gives no duty classification?

Raise a clarification before pricing. If the bid date does not allow it, state your assumed working cycles and load spectrum, or the class you have assumed, in the offer. That makes the assumption part of the contract. Pricing a standard crane without saying so leaves you exposed if the process turns out to be heavier.

Which design standard applies to an overhead crane?

The contract and the country of use decide. In Europe, makers commonly design to the EN 13001 series with EN 15011 as the product standard for bridge and gantry cranes. North American enquiries usually name ASME B30 volumes and a CMAA specification. Many customers add their own specification on top. Use the editions the contract names.

What is the difference between EN 13001 and EN 15011?

EN 13001 is a series on the general design of cranes: principles, load actions and the proof of competence for structures and components. EN 15011 is the product standard for bridge and gantry cranes. It covers the whole crane, including safety requirements and verification, and it relies on EN 13001 for the design calculations. A specification normally names both.

How should we handle the customer's site standards?

Treat each one as part of the specification. Site standards for motors, cabling, panels, paint and access often conflict with a standard crane more than the crane clauses do. List every site standard named, confirm you have received it, and review it clause by clause. For any you have not received, write a clarification and exclude it until it arrives.

Which controls and safety requirements cause deviations?

The common ones are a required make of drive or control system, radio control with a particular fallback, anti-collision between cranes on one runway, zone restrictions, load display or logging, and a stated performance level for a safety function. Compare each with your standard control package. Anything outside it is an option to price or a deviation to declare.

What goes in a crane manufacturer's deviation list?

Every clause you will not meet as written, with what you offer and why. Typical rows cover the mechanism class, named component makes, deflection or speed limits, site electrical standards, extra NDE, the test arrangements and the form of the calculations. Keep clarifications separate from deviations. The technical deviation list guide shows a layout.

Do we have to hand over the full crane calculations?

Only if the contract says so. Many makers supply a calculation summary that states the classification, the load combinations and the result, and treat the full calculation as their own know-how. If the specification asks for structural calculations, either price the work and agree confidentiality, or list the summary as a deviation. Do not stay silent on it.

What is a load test certificate and when is it issued?

It is a signed record that a named crane or hoist was tested with stated loads on a stated date. A hoist may be tested in the works. A crane erected on the customer's runway is tested there after installation. The certificate should carry the serial number, rated capacity, loads, tests, result and signatory. See the checklist.

Who provides the test loads for a site load test?

Whoever the contract names, so check it. Specifications differ: some make the supplier provide certified test weights, others have the purchaser provide them. Test loads for a large crane are a real cost in hire and transport. If the specification and your standard terms differ on this point, put it in the deviation list with the price effect.

Which crane parts need material certificates?

The specification decides, and it usually picks out load-bearing parts: girder and end carriage plate, hooks, ropes, and lifting lugs or beams. It should also state the certificate type. Check that each certificate can be tied to the part fitted, by heat or serial number. See EN 10204 3.1 vs 3.2 for the types.

Does a crane need a declaration of conformity?

For the EU market, yes: a crane is machinery, and the maker draws up a declaration of conformity under the machinery rules before placing it on the market. Great Britain has its own machinery regulations with the same kind of document. The declaration should name this crane, its serial number and the law it is made under. See the machinery rules page.

Does LOLER apply to the crane manufacturer?

No. LOLER puts duties on those who own, operate or control lifting equipment at work in Great Britain. The manufacturer is covered by product supply law. LOLER still shapes what a British buyer asks you for, because the user needs your declaration, instructions, rating information and test records to meet their own duties.

Does a new crane need a thorough examination before use in Great Britain?

Where its safety depends on the installation, yes. LOLER allows a recent declaration of conformity to stand in before first use, but not for equipment assembled on site, and an overhead crane is erected on the user's runway. The user arranges the thorough examination with a competent person. Your test records and instructions feed into it.

How does OdysseyGPT help a crane manufacturer?

It compares documents and quotes them. Document Review sets the customer's crane specification beside your standard technical specification and proposes a status for each requirement: complies, deviates, not addressed or clarification. An engineer checks every row. Other tools, in beta, cover the order's document list, the inspection plan, certificates and calibration records.

What does OdysseyGPT not do for crane makers?

It does not classify a crane, calculate a structure or verify a design against any standard. It does not read general arrangement drawings or schematics. It does not perform a load test or a thorough examination, and it certifies nothing. Document Review and the other tools read text and tables, and your engineers decide what each finding means.

Frequently asked questions

What documents should come with a new overhead crane?

The order decides, but buyers commonly ask for a calculation summary, certificates for load-bearing materials, hooks and ropes, welding and NDE records, a load test certificate, electrical test records, a declaration of conformity and instructions for use and maintenance. In Great Britain the user also needs enough information for thorough examination.

What is a load test certificate for a crane?

A record that a named crane or hoist was tested with stated loads on a stated date. It identifies the equipment, its rated capacity, the tests done and the person responsible. The order and the standard it names say which tests are needed.

Does OdysseyGPT check a crane design against EN 13001?

No. It does not calculate or verify a design. It compares documents: the customer's specification with your technical specification, or the order with your certificates and reports, and it quotes both sides.

Can OdysseyGPT replace a thorough examination?

No. A thorough examination is a physical examination by a competent person. OdysseyGPT reads documents only.

References

Lifting Operations and Lifting Equipment Regulations 1998 (LOLER)

Health and Safety Executive

The user's duties in Great Britain, including marking, thorough examination and keeping the declaration of conformity. Read 15 Nov 2026.

Visit source

Thorough examination of lifting equipment

Health and Safety Executive

When an examination is needed and what the competent person uses.

Visit source

Directive 2006/42/EC on machinery

EUR-Lex

Annex I has supplementary requirements for machinery that lifts loads. Annex II covers the declaration of conformity.

Visit source

ISO 4301-1: Cranes. Classification. Part 1: General

ISO

Catalogue entry. The standard is a paid document.

Visit source

EN 13001 series and EN 15011

CEN

Paid standards, sold by national standards bodies. Named here by title and subject only.

ASME B30 series and ASME BTH-1

ASME

Paid standards, named here by title and subject only.

Visit source

CMAA Specifications No. 70 and No. 74

Crane Manufacturers Association of America

Paid specifications, named here by title and subject only.

Visit source

FEM 1.001: Rules for the design of hoisting appliances

European Materials Handling Federation

Named here by title only.

Related Pages