What are the EU machinery rules?
Directive 2006/42/EC has applied in the EU since 29 December 2009. It covers machinery when it is first placed on the market or put into service. It also covers some related products, among them interchangeable equipment, safety components, lifting accessories and partly completed machinery. The duties fall on the manufacturer or its authorised representative.
The Directive says what a machine must achieve for health and safety. It does not say how to build it. The detail sits in European harmonised standards, which are voluntary. A machine built to a harmonised standard cited in the Official Journal is presumed to meet the requirements that standard covers. A builder may choose another route, but must then show in the technical file how the requirements are met.
This page is an overview, not legal advice
It is our own summary, written for engineers who read customer specifications. It leaves out exclusions, special categories and much detail. Work from the legal texts and the standards your contract names, and take advice from a competent person on whether and how the rules apply to your machine.
What does the Machinery Directive require of the manufacturer?
Article 5 of the Directive lists what the manufacturer must do before a machine is placed on the market or put into service. The table follows that list. The right-hand column shows where each duty tends to surface in a customer's requirement specification.
| Duty | What it means in outline | Where a customer specification touches it |
|---|---|---|
| Meet the essential health and safety requirements | Annex I lists the requirements. They apply where the hazard they deal with exists on the machine | Plant safety standards that add guard types, access rules or operating modes |
| Carry out a risk assessment | Annex I asks the manufacturer to set the limits of the machine, including intended use and foreseeable misuse, identify hazards, estimate and evaluate the risks, and then remove or reduce them | Requests to review the risk assessment at a design milestone, or to use the customer's own method |
| Make the technical file available | Annex VII lists the contents: description, drawings, calculations and test results, the risk assessment record, the standards used, a copy of the instructions and of the declaration | Clauses asking for drawings, calculations or the risk assessment as deliverables |
| Provide instructions | Instructions go with the machine in the official language or languages of the member state where it is placed on the market or put into service | The languages listed for instructions and for HMI texts |
| Carry out the conformity assessment | For machinery outside Annex IV this is the manufacturer's own internal check. Annex IV lists categories with further routes, some involving a notified body | Requests for third-party inspection or a certificate that the law itself does not ask for |
| Draw up the declaration of conformity | A signed EC declaration with the content set out in Annex II. It goes with the machine | When the declaration is to be handed over, and whether a draft is wanted at FAT |
| Affix the CE marking | The marking goes on the machine, near the manufacturer's name | Rating plate content and any extra plant labels |
Annex VII asks for the technical file to be available to the authorities for at least ten years after the date of manufacture, or after the last unit for series machines. The file does not have to exist as one bound set, but the person named in the declaration must be able to assemble it in reasonable time.
What is partly completed machinery?
The Directive treats an assembly that is almost a machine, but cannot perform a specific application on its own, as partly completed machinery. It is meant to be built into other machinery. An industrial robot supplied to a line integrator without its tooling and guarding is a commonly cited case. Whether a given scope of supply is a complete machine or partly completed machinery is a question to settle early, because the documents differ.
| Complete machinery | Partly completed machinery | |
|---|---|---|
| Declaration | EC declaration of conformity | Declaration of incorporation, stating which essential requirements are applied and fulfilled |
| Instructions | Instructions for use | Assembly instructions, describing the conditions for safe incorporation |
| Documentation kept by the maker | Technical file | Relevant technical documentation |
| CE marking under the machinery rules | Yes | No |
| Putting into service | Allowed once the duties in the table above are met | Not until the final machine it is built into has been declared in conformity |
Where several machines are arranged and controlled to work as one whole, the Directive treats the assembly as machinery in its own right. On a line project the contract should say who takes the manufacturer's role for the whole line. That party collects the declarations of incorporation and assembly instructions from the others, and they become part of its technical file.
What changes with Machinery Regulation (EU) 2023/1230?
Regulation (EU) 2023/1230 was adopted on 14 June 2023. It is a regulation, so it applies directly in every member state with no national transposition. The text first published gave 14 January 2027 as the date of application. A corrigendum changed that, and the Commission's machinery page states that the Regulation applies from 20 January 2027. Machinery placed on the EU market before that date must meet the Directive.
For most special-purpose machines the basic route stays the same: the manufacturer assesses conformity itself, keeps the documentation, signs a declaration and affixes the CE marking. The table lists the main differences a project engineer is likely to meet. It is not a full comparison.
| Topic | What the Regulation does |
|---|---|
| Names of the documents | The technical file becomes technical documentation (Annex IV). The declarations become the EU declaration of conformity and the EU declaration of incorporation (Annex V) |
| Higher-risk categories | Annex I replaces the old Annex IV list. Six categories in Part A must go through a route that involves a notified body. For Part B, the manufacturer's own internal control is allowed only where harmonised standards or common specifications covering all relevant requirements are applied |
| Digital instructions | Instructions and the declaration may be provided in digital form. A purchaser can ask at the time of purchase for paper instructions, free of charge, within one month |
| Software and connected machines | New essential requirements deal with protection against corruption of safety-relevant software and data, and with control systems whose behaviour evolves |
| Safety software in the documentation | The documentation covers the source code or programming logic of safety-related software, to be provided on a reasoned request from a national authority |
| Substantial modification | A person who substantially modifies a machine already in service is treated as a manufacturer for that modification and must carry out the conformity assessment |
| Importers and distributors | The Regulation sets out separate duties for importers and for distributors of machinery and of partly completed machinery |
| Retention | The manufacturer keeps the technical documentation and the declaration available to the authorities for at least ten years after the machine is placed on the market or put into service |
Two cautions. The Regulation has already been amended, by Regulation (EU) 2026/1744, so read the consolidated text on EUR-Lex. And the Commission's own guide to the Regulation is still being written. Its machinery page says partial sections are available and that the full guide is expected during 2027. The list of harmonised standards cited under the Regulation is separate from the list under the Directive, so check which list a standard appears on.
Check the delivery date, not the order date
What matters is when the machine is placed on the market or put into service. A machine ordered in 2026 but first placed on the market on or after 20 January 2027 falls under the Regulation. If your project crosses that date, agree in the functional specification which text the declaration will cite.
What is the position in Great Britain and Northern Ireland?
Great Britain has its own law: the Supply of Machinery (Safety) Regulations 2008, which carried the Directive into UK law. The duties are close to those in the Directive. The government guidance lists safe design to the essential health and safety requirements, a technical file, instructions, a declaration of conformity and a conformity marking. HSE's summary adds that instructions must be in English. Partly completed machinery needs a declaration of incorporation and assembly instructions.
- Marking. The gov.uk guidance, dated March 2025, says a manufacturer may affix the UKCA marking or the CE marking for the Great Britain market, and that the Product Safety and Metrology etc. (Amendment) Regulations 2024 extended recognition of CE marking there. Those regulations came into force on 1 October 2024.
- Declaration. The same guidance says the declaration is a UK declaration of conformity where the machine is UKCA marked and an EU declaration where it is CE marked.
- The EU Regulation. In February 2026 the government said it intends to keep recognising CE marking for machinery in Great Britain and to update the 2008 Regulations with measures similar to the EU's. An amending instrument, S.I. 2026/867, was made on 22 July 2026 and comes into force on 20 January 2027. Among other things it refers to machinery that meets the EU Machinery Regulation. Read the instrument and the current gov.uk guidance before you rely on this.
- Northern Ireland. EU machinery rules continue to apply in Northern Ireland under the Windsor Framework. The explanatory note to S.I. 2026/867 says the EU Machinery Regulation applies there from 20 January 2027.
For a British customer, the specification should say which marking and which declaration it expects. If it says only "CE marked" or only "UKCA marked", confirm that this is what the customer's own safety team wants.
What to check in a customer specification against the machinery rules
A customer specification cannot remove a legal duty from the manufacturer. It can add to it, and it can ask for documents the law lets the builder keep. Use this list when you read a requirement specification, and put anything unclear on the question list before you quote.
| Check | Why it matters |
|---|---|
| Where will the machine be used, and under which law? | The EU, Great Britain, Northern Ireland and the United States each have their own rules. The specification should name the country and the legislation |
| When will it be placed on the market or put into service? | From 20 January 2027 the Regulation replaces the Directive in the EU. A specification written earlier may still cite the Directive |
| Is your scope a complete machine or partly completed machinery? | It decides whether you sign a declaration of conformity or a declaration of incorporation, and who CE marks the whole installation |
| Who is the manufacturer of the whole line? | Where several suppliers' machines work as one, somebody must take that role. If the specification is silent, ask |
| Which standards are named, and which edition? | A named standard becomes a contract requirement even where the law treats it as voluntary. Editions cited in a specification can be out of date |
| Does a factory standard conflict with your risk assessment? | A plant rule that asks for a particular guard or operating mode may not fit the hazards on your machine. Declare the conflict before the order |
| Which parts of the technical file does the customer want? | The law asks for the file to be available to the authorities. Anything the customer wants from it is a contract deliverable and should be listed |
| Which languages are required? | The law sets the language of the instructions by country of use. The customer may add languages for HMI texts, drawings and training |
| Are digital instructions accepted? | The Regulation allows digital instructions. The customer's documentation standard may still ask for paper sets |
| When is the declaration handed over? | Customers often tie it to FAT, delivery or the site acceptance test. Check that the date fits the point at which the machine is complete |
| Will the customer modify the machine later? | Under the Regulation a substantial modification can make the modifier a manufacturer. State in the offer what your declaration covers |
| Does the specification ask for more than CE marking? | Third-party inspection, a US electrical standard or a plant sign-off are contract extras. Price them |
Points where your offer differs go on the technical deviation list. The wider picture of a machine enquiry, from requirement specification to handover, is on the machine builders page.
How does OdysseyGPT help, and where does it stop?
OdysseyGPT reads documents and checks them against the customer's written requirements. Document Review takes the requirement specification as the base and your functional specification and quotation as the documents to check. For each requirement it gives a status and a quote from both sides. That includes the clauses on legislation, standards, declarations, languages and documents listed in the checklist above. Customer Specification Review (beta) lists the requirements of the specification in a register, each with its clause, before you start the reply.
- It does not carry out a risk assessment or a conformity assessment, and it does not decide whether the Directive or the Regulation applies to your machine.
- It does not write the technical file, the declarations or the instructions.
- It does not read drawings, electrical schematics or PLC code.
- It holds no legal texts or standards. It checks against the documents you upload, and engineers decide every status.