Declaration of Incorporation

The declaration a manufacturer issues for partly completed machinery. It states which essential health and safety requirements have been met and that the item must not be put into service until the final machine is declared in conformity.

Last reviewed by the OdysseyGPT team

What it is

A declaration of incorporation is the document a manufacturer issues for partly completed machinery under the EU machinery rules. It identifies the item, states which essential health and safety requirements are applied and fulfilled, and says the item must not be put into service until the final machine it is built into has been declared in conformity.

Key Takeaways

  • It applies to partly completed machinery, not to a complete machine.
  • It lists the essential requirements the maker has applied and fulfilled.
  • It is supplied together with assembly instructions.
  • The party that completes the machine issues the declaration of conformity.

Why it matters

A declaration of incorporation is the document that goes with partly completed machinery. Directive 2006/42/EC describes partly completed machinery as an assembly that is almost machinery but cannot perform a specific application by itself, and that is meant to be built into or joined with other machinery. Because it is not a finished machine, its maker does not issue a declaration of conformity under the machinery rules and does not affix CE marking under them. The maker prepares three things instead: the relevant technical documentation, assembly instructions, and the declaration of incorporation. In outline the declaration names the manufacturer and any authorised representative, names the person authorised to compile the technical documentation, identifies the item by description, model, type and serial number, and states which essential health and safety requirements of the Directive are applied and fulfilled. It contains an undertaking to send relevant information to national authorities on a reasoned request, and a statement that the item must not be put into service until the final machinery into which it is built has been declared in conformity. It ends with a place, a date and a signature. The declaration and the assembly instructions travel with the item until it is built in. They then form part of the technical file of the final machine. The practical weight of the document is in the list of requirements. Whatever the list leaves out is left for the party that completes the machine, so an integrator should read it against its own risk assessment. Regulation (EU) 2023/1230 keeps the concept under the name EU declaration of incorporation. This is an overview and not legal advice.

How OdysseyGPT uses it

Document Review checks whether a customer's specification asks for a declaration of conformity or a declaration of incorporation for your scope, and what your functional specification and quotation offer, with a quote from both sides. It can do the same for the purchase specification you send to a sub-supplier. OdysseyGPT does not decide whether an item is partly completed machinery, and it does not draft or sign either declaration.

Evaluation questions

What should an integrator check on a supplier's declaration of incorporation?

That it identifies the item delivered, that the list of fulfilled requirements matches what the purchase specification asked for, and that the assembly instructions came with it. Requirements missing from the list fall to the integrator.

Frequently asked questions

What is the difference between a declaration of incorporation and a declaration of conformity?

A declaration of conformity is for a complete machine and states that it meets the machinery rules. A declaration of incorporation is for partly completed machinery and states which requirements have been met, leaving the rest to whoever completes the machine.

Is partly completed machinery CE marked?

Not under the machinery rules. Other legislation that applies to the same item may still require CE marking.

Who declares the final machine in conformity?

The party that builds the partly completed machinery into a complete machine and places that machine on the market or puts it into service. On a line project the contract should name that party.

References

Directive 2006/42/EC on machinery (consolidated text)

EUR-Lex

Articles 5 and 13 and Annexes II, VI and VII.

Visit source

Regulation (EU) 2023/1230 on machinery

EUR-Lex

Articles 10 and 11 and Annexes IV and V. The Commission states it applies from 20 January 2027.

Visit source

The Supply of Machinery (Safety) Regulations 2008, Schedule 2, Part 2