IEC 62271 high-voltage switchgear: the parts, the tests, internal arc classification and a tender checklist

A plain-English overview of IEC 62271 for tender and quality engineers at switchgear manufacturers: how the series is laid out, what type and routine tests are, what an internal arc classification says, and what to check when a tender names the series.

By Ademola Afolabi, Founder, New Odyssey Ltd · Last reviewed:

The short answer

IEC 62271 is the international series for high-voltage switchgear and controlgear, which in IEC terms means above 1 kV. Part 1 holds the common specifications. Other parts cover one product each, such as Part 100 for circuit-breakers and Part 200 for metal-enclosed switchgear up to 52 kV. Each product part sets its own type tests and routine tests.

Key Takeaways

  • IEC 62271 is a family of parts. Part 1 gives common rules and each product part adds to it or changes it.
  • Type tests prove a design and are reported once. Routine tests are made on the equipment that is actually delivered.
  • An internal arc classification states who may be near the assembly, which sides were tested, and the arc current and duration.
  • Low-voltage assemblies are outside this series. They fall under IEC 61439.

See how OdysseyGPT reviews a tender. Tell us how your team reviews tenders today. We can walk through an example together. Book a call

What is IEC 62271?

IEC 62271 is published under the general title High-voltage switchgear and controlgear. IEC technical committee 17 and its subcommittees maintain it. In this series, high voltage means a rated voltage above 1 kV, so the equipment many engineers call medium-voltage switchgear sits inside it.

The series has a common part and many product parts. Part 1, Common specifications for alternating current switchgear and controlgear, sets the shared rules for ratings, design, type tests and routine tests. A product part is read together with Part 1. Where the product part is more specific, it governs for that product.

Which parts of IEC 62271 does a tender name?

Broadly, parts numbered in the 100s deal with switching devices and parts in the 200s with assemblies. The table gives the parts that turn up most often in tenders, by subject. The series has many more, including technical reports and specifications. The IEC website has the current list and editions.

Parts of IEC 62271 that switchgear tenders refer to most often (subjects only, own selection)
PartSubjectTypical tender question
IEC 62271-1Common specifications for AC switchgear and controlgearWhich edition the product parts in the offer were tested with
IEC 62271-100AC circuit-breakersRatings and the making and breaking duties the type tests cover
IEC 62271-102AC disconnectors and earthing switchesRatings and classes of the earthing switch offered
IEC 62271-103Switches for rated voltages above 1 kV up to and including 52 kVWhether a switch or a circuit-breaker is wanted in each functional unit
IEC 62271-105AC switch-fuse combinationsTransformer protection panels in ring main units
IEC 62271-106AC contactors, contactor-based controllers and motor-startersMotor feeder panels
IEC 62271-200AC metal-enclosed switchgear and controlgear above 1 kV and up to and including 52 kVInternal arc classification, service continuity category and the type tests for the assembly
IEC 62271-201AC solid-insulation enclosed switchgear and controlgear above 1 kV and up to and including 52 kVWhether the offered panel belongs here and not under Part 200
IEC 62271-202High-voltage/low-voltage prefabricated substationsThe enclosure, transformer and both switchgear sections supplied as one tested unit
IEC 62271-203Gas-insulated metal-enclosed switchgear for rated voltages above 52 kVTransmission-voltage gas-insulated substations

Parts are revised separately. The current Part 200 is the third edition, published in 2021, and it was aligned with the 2017 edition of Part 1. A tender written from an older template may still cite earlier editions. Your type test reports state the edition they were made to, so compare the two and declare any difference.

Type tests and routine tests in IEC 62271

Each product part has a type test clause and a routine test clause. Type tests are made on representative equipment to prove the design and its ratings. Routine tests are made on what is actually delivered, to find faults in material or assembly. The table shows the headings Part 200 uses for a metal-enclosed assembly. It names the tests only. The procedures, test values and acceptance criteria are in the standard.

Test headings in IEC 62271-200 for metal-enclosed switchgear (own summary of the published contents list)
Type tests includeRoutine tests include
Dielectric testsDielectric test on the main circuit
Resistance measurement and continuous current testsMeasurement of the resistance of the main circuit
Short-time withstand current and peak withstand current testsTests on auxiliary and control circuits
Verification of the protection provided by the enclosureDesign and visual checks
Tightness tests and pressure withstand tests for gas-filled compartmentsTightness test and pressure tests of gas-filled compartments
Verification of making and breaking capacitiesMechanical operation tests
Mechanical operation testsPartial discharge measurement
Internal arc testTests after erection on site, where they apply

Not every heading applies to every assembly, and some are subject to agreement. A tender often adds to both lists. It may ask for type test reports from an independent laboratory, set a maximum age for them, or ask for a routine test to be witnessed. See type test vs routine test for the general idea across transformers and switchgear.

What is internal arc classification?

An internal arc is a fault inside the enclosure that releases hot gas and pressure. Part 200 lets a manufacturer assign an internal arc classification, written IAC, to an assembly that has passed the internal arc test set out in the standard. The classification is about protecting people near the assembly in normal operating condition. It is not a statement that the equipment survives the fault.

The designation has three elements, and a tender should give all three.

  • Type of accessibility. Type A is restricted to authorised personnel. Type B is unrestricted and includes the general public.
  • Classified sides. For types A and B the letters F, L and R mark the front, lateral and rear sides that met the test criteria.
  • Arc fault current and duration. The designation ends with the tested current and time.

The test is made in a room simulation, and the arrangement tested matters. Ceiling height, distance to walls and any gas exhaust duct are part of what was proved. When a tender gives switchroom dimensions, check them against the installation conditions stated in your test report and manual. Older editions and older data sheets also show a type C, for pole-mounted equipment out of reach. Internal arc testing of pole-mounted switchgear was taken out of the 2021 edition and now has its own part, IEC 62271-214.

Two other classifications the tender may quote

Part 200 also has a loss of service continuity category, written LSC1, LSC2, LSC2A or LSC2B. It describes which other compartments and functional units can stay energised while one compartment is open. Partition class PM or PI says whether partitions and shutters are metal or insulating. A tender line can combine all of these with the IAC designation in one string, so check each element against your type test evidence.

What about low-voltage switchgear and IEEE?

Low-voltage assemblies are not covered by IEC 62271. They fall under IEC 61439, where Part 1 gives general rules and Part 2 covers power switchgear and controlgear assemblies. That series uses different words for the same idea. Design verification proves the design, by test or by one of the other routes the standard allows for each characteristic. Routine verification is made on every assembly built. It replaced the older IEC 60439 terms type-tested and partially type-tested assembly, which still appear in tender templates.

Buyers working to North American practice cite the IEEE C37 series for switchgear in place of IEC 62271. Ratings and test duties are defined differently, so a type test report to one family does not automatically answer a requirement written to the other. Raise it as a clarification.

How does OdysseyGPT help with an IEC 62271 tender?

Document Review checks the buyer's switchgear specification and schedules against your technical data sheets, catalogue ratings, type test report summaries and offer text. Each requirement gets a status and a quote from both sides. A rating string such as an IAC designation is compared as written, so a missing side letter or a different duration shows up as a difference for an engineer to judge.

Datasheet Comparison (beta) compares the buyer's panel schedule with yours, field by field. Deviation Register (beta) keeps one record of each deviation through the clarification rounds. After award, FAT Readiness Check (beta) reads the routine test procedure, ITP status and open items before a witnessed test, and MRB Readiness Check (beta) compares the dossier folder with the buyer's index.

What it does not do

OdysseyGPT does not test switchgear and does not decide whether a type-tested arrangement covers the panel you offer. It does not read single-line diagrams, panel layouts or switchroom drawings, so a requirement shown only there is not checked. It carries no copy of IEC 62271. Engineers confirm every row.

What to check in a switchgear tender against IEC 62271

This is a reading list for the tender. It is not a summary of what the standard requires. Part 200 itself has an informative clause on the information to give with enquiries, tenders and orders, which is worth reading beside it.

Tender checklist for a metal-enclosed switchgear offer (own summary)
CheckLook in the tender forLook in your documents for
Parts and editionsEach part of IEC 62271 named, with its year, and any national or utility standard beside itThe edition on each type test report
Which product part appliesWhether the panel described is metal-enclosed, solid-insulation enclosed, gas-insulated or a prefabricated substationThe part your product is declared to
Service conditionsIndoor or outdoor, altitude, temperature and other conditions the standard treats as specialThe conditions your ratings assume
Rated valuesRated voltage, insulation level, frequency, continuous current, short-time and peak withstand currents and durationThe same values on the nameplate data and data sheet, for busbars and each feeder
Switching devicesDevice type in each functional unit and the part of the series it must meetType test evidence for each device as installed in the panel
Internal arc classificationAccessibility type, classified sides, arc current and duration, and the switchroom dimensionsThe IAC designation and the installation conditions in the test report
Service continuity and partitionsThe LSC category and partition class asked forThe category and class declared for each functional unit
Enclosure and interlocksDegree of protection, earthing arrangements, interlocks and locking facilitiesThe matching statements in your specification and manual
Gas and tightnessThe insulating or switching medium accepted, and any limit on gas typeThe medium used and the tightness data you declare
Type test evidenceWhich reports are wanted, from which kind of laboratory and how recentA list of reports with design, date, laboratory and tests covered
Routine tests and witnessingAdditions to the routine tests, witness rights and notice periodYour routine test procedure, report format and ITP
Auxiliary and control equipmentAuxiliary supply voltages, protection relays, metering and communication interfacesThe schedule of secondary equipment in the offer
Site workTests after erection, commissioning and trainingWhat the offer includes on site
DocumentsDrawings for approval, manuals, test reports and the final dossier indexYour standard document list and any gaps

Talk through your tender review

See how OdysseyGPT reviews a tender

Tell us how your team reviews tenders today. We can walk through an example together.

Book a call

Frequently asked questions

What is IEC 62271 used for?

It is the international series of standards for switchgear and controlgear rated above 1 kV. Buyers cite it to set ratings, tests and classifications, and makers design and test circuit-breakers, switches and assemblies against it.

What does IEC 62271-200 cover?

Prefabricated AC metal-enclosed switchgear and controlgear assemblies for rated voltages above 1 kV and up to and including 52 kV, for indoor and outdoor installation. The assembly may have air-insulated or fluid-filled compartments.

What does IAC AFLR mean?

It is an internal arc classification under IEC 62271-200. A is the accessibility type for authorised personnel. F, L and R are the front, lateral and rear sides that met the test criteria. An arc current and a duration follow the letters.

Does IEC 62271 cover low-voltage switchboards?

No. It covers equipment above 1 kV. Low-voltage switchgear and controlgear assemblies are covered by the IEC 61439 series.

References

IEC 62271-200:2021 High-voltage switchgear and controlgear. Part 200: AC metal-enclosed switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV

IEC

Paid standard. The catalogue page and the free preview (contents, foreword) were used for the scope, the changes in the third edition and the clause headings.

Visit source

IEC 62271 series: High-voltage switchgear and controlgear, all parts

IEC

List of the parts in the series with their current editions.

Visit source

IEC 62271-100:2021 High-voltage switchgear and controlgear. Part 100: Alternating-current circuit-breakers

IEC

Catalogue page.

Visit source

What is the meaning of the internal arc classification (IAC) designation?

Schneider Electric

A manufacturer's public explanation of accessibility types and classified sides.

Visit source

IEC 61439 series: Low-voltage switchgear and controlgear assemblies

IEC

Paid standards. Use the edition your contract names.

Visit source

Guide to switchgear and controlgear assemblies to BS EN 61439

BEAMA

A trade association guide to design verification and routine verification.

Visit source

Related Pages