The short answer

IEC 60076 is the international series of standards for power transformers. Part 1 gives the general requirements and sorts tests into routine, type and special. Other parts cover temperature rise, insulation and dielectric tests, short-circuit withstand, sound levels, loading and dry-type transformers. A tender that names the series still has to say which tests and evidence it wants.

Key Takeaways

  • IEC 60076 is a series. A tender that cites it without part numbers leaves the bidder to state which parts the offer follows.
  • Routine tests are made on every transformer, type tests on a representative unit, and special tests when the purchaser asks for them.
  • The purchaser can ask for a type or special test on every unit. That change belongs in the tender, and it changes the price.
  • Part 1 ends with an informative checklist of the information to give with an enquiry and an order.

See how OdysseyGPT reviews a tender. Tell us how your team reviews tenders today. We can walk through an example together. Book a call

What is IEC 60076?

IEC 60076 is published by the International Electrotechnical Commission under the general title Power transformers. Technical committee 14 maintains it. Part 1, General, applies to three-phase and single-phase power transformers, including auto-transformers. It leaves out some small and special categories, such as instrument transformers, welding transformers and traction transformers mounted on rolling stock.

Part 1 holds the definitions, service conditions, rating rules, tapping rules, connection symbols, rating plate content, tolerances and the general test requirements. The other parts each take one subject, such as temperature rise or dielectric testing, or one kind of transformer, such as dry-type units. Where a kind of transformer has its own part, Part 1 applies only as far as that part calls it up.

Editions move part by part

Each part of the series is revised on its own timetable, and many countries publish the parts as national standards under their own numbers. A tender may name an edition older than the current one. State in your offer which edition of each part your design and your type test reports follow.

Which parts make up the IEC 60076 series?

The table lists the parts a tender engineer meets most often, by title. It is not the full series, and it gives no requirements. The IEC website carries the current list and editions.

Parts of IEC 60076 that transformer tenders refer to most often (titles only, own selection)
PartSubjectWhy it matters in a tender
IEC 60076-1GeneralDefinitions, ratings, tappings, tolerances, rating plate and the split of tests into routine, type and special
IEC 60076-2Temperature rise for liquid-immersed transformersThe basis for the temperature rise guarantee and the test that proves it
IEC 60076-3Insulation levels, dielectric tests and external clearances in airThe insulation level in the schedule and the dielectric tests that go with it
IEC 60076-5Ability to withstand short circuitHow short-circuit withstand is shown, which is where buyers ask for test evidence
IEC 60076-6ReactorsApplies when the lot includes reactors
IEC 60076-7Loading guide for mineral-oil-immersed power transformersCited when the tender sets overload duties
IEC 60076-10Determination of sound levelsThe method behind the guaranteed sound figure
IEC 60076-11Dry-type transformersThe governing part for cast resin and other dry-type units
IEC 60076-12Loading guide for dry-type power transformersThe dry-type counterpart to Part 7
IEC 60076-13Self-protected liquid-filled transformersA distribution transformer type with its own part
IEC 60076-14Liquid-immersed power transformers using high-temperature insulation materialsApplies when the design uses such materials
IEC 60076-15Gas-filled power transformersA transformer type with its own part
IEC 60076-16Transformers for wind turbine applicationsNamed in wind farm tenders
IEC 60076-18Measurement of frequency responseThe method when a tender asks for a frequency response record at the works or on site

Components are covered elsewhere. Part 1 refers out to separate IEC standards for bushings, tap-changers and insulating oil. A tender that wants certificates for those components is asking for evidence against those standards, not against IEC 60076 itself.

Routine, type and special tests: what is the difference?

Part 1 puts every test into one of three categories. The category decides how often the test is made and who pays for it by default. See type test vs routine test for the short version.

The three test categories in IEC 60076-1 (own summary, no test values)
CategoryWhen it is madeExamples named in the Part 1 test clauseUsual evidence
Routine testOn every transformerWinding resistance, voltage ratio and phase displacement check, short-circuit impedance and load loss, no-load loss and currentA routine test report for each serial number
Type testOn one transformer that represents the others of the same designTemperature rise is the usual exampleA type test report, either new for the order or an existing one the buyer accepts
Special testOnly when the purchaser asks for it and it is agreedShort-circuit withstand and frequency response are often asked for in this wayA report for the unit tested, as the contract sets out

Two points catch bidders out. First, the lists are not the same for every transformer. The standard assigns some tests to a different category depending on the voltage class, so a test that is routine for a large transmission unit may be a type or special test for a smaller one. Second, the purchaser may move a test up, for example by asking for a type test on every unit. Read the test clause of the edition named in your contract, then read the tender's own test list beside it.

Besides the electrical measurements, Part 1 has clauses on on-load tap-changer operation tests, leak testing with pressure, vacuum and pressure deflection tests on the tank, and a check of core and frame insulation. For what these look like on the test floor, see transformer testing.

What does IEC 60076-1 expect the purchaser to state?

The standard leaves a number of choices to agreement between manufacturer and purchaser, and says these should be raised early and written into the contract specification. Part 1 has a clause on the extra information an enquiry needs, covering matters such as winding connection, sound level and transport. It also has an informative annex that is a checklist of the information to provide with an enquiry and an order.

For a bidder this is useful in reverse. Where a tender is silent on a point the annex lists, you have grounds for a clarification question. Where the tender answers it in a schedule, that line belongs in your guaranteed technical particulars and in your compliance matrix.

Part 1 also has a tolerances clause. It applies to certain guaranteed quantities when the contract does not say otherwise. Many utility specifications do say otherwise, and some allow no tolerance above the guaranteed loss. This page does not reproduce the figures. Compare the tender's wording with the edition it names.

IEC 60076 or IEEE C57?

Buyers in North America and some other markets specify IEEE standards. For liquid-immersed transformers the general requirements are in IEEE C57.12.00 and the test methods in IEEE C57.12.90. Dry-type transformers have their own pair, C57.12.01 and C57.12.91. The IEEE Transformers Committee maintains them.

The two families overlap but are not interchangeable. Test names, test categories and rating conventions differ. If a tender cites both, or cites IEEE for the transformer and IEC for its components, ask which governs before you fill in the schedules.

How does OdysseyGPT help with an IEC 60076 tender?

Document Review takes the tender specification and its schedules as the base and checks your datasheet, filled schedules, test procedure and list of type test reports against it. For each requirement it gives a status and quotes the passage in both documents. It also works in reverse and lists statements in your documents that the tender does not answer.

  • Customer Specification Review (beta) turns the specification into a register with one line per test, rating or document obligation.
  • Datasheet Comparison (beta) sets the buyer's transformer schedule beside your filled copy and lists the fields that differ.
  • ITP Validator (beta) checks your inspection and test plan against the buyer's test and witness clauses.
  • Calibration Validity Check (beta) matches the instruments named in a routine test report to their calibration certificates.

What it does not do

OdysseyGPT does not test a transformer, calculate a loss or a temperature rise, or decide that an old type test report still represents your design. It does not read drawings. It has no copy of IEC 60076, so it checks against the standard only where you upload the edition as readable text. Engineers decide every status.

What to check in a transformer tender against IEC 60076

Use this as a reading list for the tender, not as a statement of what the standard requires. Each line names something to find in the tender and in your own documents.

Tender checklist for a transformer offer (own summary)
CheckLook in the tender forLook in your documents for
Parts and editionsWhich parts of IEC 60076 are named, with or without a year, and any national equivalentThe editions your design standard and type test reports state
Order of precedenceWhich document wins when the specification, schedules and standards disagreeAny offer text that assumes a different order
Service conditionsAltitude, ambient temperature and other conditions outside what the standard treats as normalThe conditions your ratings are based on
Rating and coolingRated power for each cooling mode, voltages, tapping range and connection symbolThe same fields on your datasheet, on the same basis
Guaranteed losses and impedanceGuaranteed figures, how losses are evaluated, and penalty or rejection termsWhich figures you mark guaranteed and which typical
TolerancesWhether the standard's tolerances apply or the buyer sets its ownAny tolerance wording in your schedules or offer letter
Routine test listTests the buyer adds to the routine list for every unitYour works routine test procedure and report format
Type testsWhich type tests must be made on this order and which may be covered by a reportYour list of type test reports, with design, date and laboratory
Special testsEach special test asked for, on which unit, and who paysWhether the offer includes, prices or excludes each one
WitnessingWhich tests are witnessed, the notice period and who attendsHold and witness points in your ITP
ComponentsStandards and approved makes for bushings, tap-changer and insulating liquidThe makes and certificates you offer
Sound levelThe guaranteed figure and the measurement basisThe basis stated on your datasheet
Transport and siteTransport limits, impact recording, site tests and commissioning scopeWhat your offer includes after the works tests
Test recordsReport format, calibration certificates for instruments and the final dossier indexYour standard report and what it leaves out

Talk through your tender review

See how OdysseyGPT reviews a tender

Tell us how your team reviews tenders today. We can walk through an example together.

Book a call

Frequently asked questions

What is IEC 60076 used for?

It is the international series of standards for power transformers. Buyers cite it in tenders to set ratings, tests and documentation, and makers design, test and document transformers against it.

Is IEC 60076 one standard?

No. It is a series of parts published separately. Part 1 is general. Others cover temperature rise, insulation levels and dielectric tests, short-circuit withstand, sound levels, loading and dry-type transformers.

Which transformer tests are routine tests under IEC 60076?

Routine tests are made on every unit. They include measurements such as winding resistance, voltage ratio, short-circuit impedance and load loss, and no-load loss and current. The full list depends on the transformer and the edition, so read the test clause of Part 1.

Does IEC 60076 cover dry-type transformers?

Yes. IEC 60076-11 is the part for dry-type transformers, and IEC 60076-12 is its loading guide. Part 1 applies to them only where Part 11 calls it up.

References

IEC 60076-1:2011 Power transformers. Part 1: General

IEC

Paid standard. The catalogue page and the free preview (contents, foreword, scope and normative references) were used for the scope, clause headings and titles of other parts.

Visit source

IEC 60076-14:2013 Power transformers. Part 14: Liquid-immersed power transformers using high-temperature insulation materials

IEC

Catalogue page.

Visit source

IEC 60076-18:2012 Power transformers. Part 18: Measurement of frequency response

VDE Verlag (IEC catalogue listing)

Catalogue page.

Visit source

IEEE Transformers Committee

IEEE Power & Energy Society

Maintains IEEE C57.12.00, C57.12.90 and the other C57 transformer standards.

Visit source

IEC 60076 series: Power transformers

IEC

Paid standards. Buy the edition of each part that your contract names.

Visit source