What is IEC 61400?
IEC 61400 is published by the International Electrotechnical Commission under the series title Wind energy generation systems. Older editions carry the title Wind turbines. The series is large. Some parts set design requirements, and others describe how to measure or test a turbine or one of its components.
| Part | Subject | Relevance to a fabricator |
|---|---|---|
| IEC 61400-1 | Design requirements for wind turbines | The base document for the turbine's structural integrity. The loads the tower is designed for start here |
| IEC 61400-2 | Small wind turbines | Relevant only if you build for small turbines |
| IEC 61400-3-1 | Design requirements for fixed offshore wind turbines | Adds the offshore conditions. Its abstract says it is not meant as a complete design specification |
| IEC 61400-3-2 | Design requirements for floating offshore wind turbines | Context for floating foundations and their towers |
| IEC 61400-6 | Tower and foundation design requirements | The part closest to a tower shop. Its abstract covers the structural integrity of onshore support structures, including foundations |
Other parts cover measurement and testing, for example of power performance, acoustic noise, mechanical loads and blades, and lightning protection. They matter to the turbine maker and the test laboratory. A tower fabricator will seldom be asked to hold or apply them. Each part is a paid document with its own edition and amendments, so a contract should name the edition.
How does type certification work, in outline?
A type certificate is a certification body's statement that a turbine type has been assessed against the stated standards. The series used to include its own part on conformity testing and certification. That part has since been withdrawn, and its role passed to IECRE, the IEC's system for certification of equipment used in renewable energy applications. The wind sector's scheme for type and component certification is known by its document number, OD-501.
Certification bodies describe the scheme as a set of modules. The names vary a little from one body's page to another, but the outline is the same.
- Design basis evaluation: the standards, conditions and assumptions the design starts from.
- Design evaluation: the design itself, including the loads and the structures, checked against that basis.
- Manufacturing evaluation: whether the turbine type is made in line with the design documents that were assessed.
- Type testing: tests and measurements on a real turbine.
- Final evaluation: the results brought together, after which the certificate is issued.
Some certification bodies also run their own schemes. DNV, for example, publishes a service specification for type and component certification of wind turbines, DNV-SE-0441, and a design standard for support structures, DNV-ST-0126. A project may also need project certification for a specific site, which is a separate matter from the type certificate. This page describes the concept only. The scheme documents and the certification body are the authority on what is assessed.
What does this mean for a tower or component fabricator?
The practical effect is one of direction. The turbine maker's design was assessed with certain materials, weld details, tolerances and corrosion protection assumed. The fabrication specification is how those assumptions reach the shop floor. The fabricator's records are how the turbine maker shows that each tower was built as assessed.
| In the certified design | In the fabricator's package | In the fabricator's records |
|---|---|---|
| Steel grades and properties assumed in the design | Plate and flange material specifications with certificate types | Certificates traced to each shell course and flange |
| Weld details and their assumed quality | Welding requirements, weld categories and NDE extent | The weld map, welder records and NDE reports |
| Geometry assumed for the shell and the bolted flanges | Tolerances on roundness, straightness and flange flatness | Dimensional reports and the flange flatness report |
| Corrosion protection for the design life | The coating system and its inspection | Coating inspection records |
| Manufacturing as evaluated | Quality requirements, approved sub-suppliers and audit rights | The inspection and test plan and the section dossier |
- You cannot approve your own change. A different weld preparation or a moved bracket goes to the turbine maker, who decides whether it sits inside the assessed design.
- Expect audits. The turbine maker qualifies its fabricators, and the manufacturing evaluation behind a certificate can extend to the makers of main components. Your contract says what access you must give.
- Expect approved sources. Plate mills, flange forges and paint systems are often restricted to a list.
- The shop standards still apply. European specifications commonly build on EN 1090-2, ISO 3834 and EN 10204. IEC 61400 does not replace them.
What to check in an OEM's fabrication specification
| Check | Where to look | Why it matters |
|---|---|---|
| The full list of documents in the package, with revisions | Transmittal or document list | A specification named and not supplied cannot be priced or followed |
| Order of precedence | General section of the fabrication specification | Drawings, specifications and standards will disagree somewhere |
| Standards and editions named | List of references | The contract edition governs, and families are sometimes mixed |
| Execution class or equivalent quality level | Fabrication specification and drawing notes | It sets the welding quality system and inspection level your shop must hold |
| Plate requirements | Material specification | Grade, delivery condition, added tests, certificate type and approved mills |
| Flange requirements | Flange specification | Approved forges, testing, certificate type and who places the order |
| Weld categories and the NDE for each | Welding and NDE requirements, weld details on drawings | Extent differs by seam type and by attachment |
| Welds to the shell for internals | Internals drawings and welding requirements | Attachments are often restricted or need approval |
| Tolerances and when they are measured | Tolerance section | Flange flatness after welding needs a method, an instrument and a stage |
| Heat treatment | Welding requirements | Usually absent. If a clause exists it needs equipment and records |
| Coating system and inspection | Coating specification | Named products, inspection stages and the repair procedure |
| Deviation and concession procedure | Quality requirements | Who answers, how fast, and whether work may continue meanwhile |
| Audit and inspection rights | Quality requirements | Hold points, notice periods and access for the turbine maker or a certification body |
| Dossier content and format | Documentation requirements | The index, the file format, the language and the due date for each section |
| Transport and storage | Handling or logistics specification | Supports, protection of flanges and coating, and who signs the section off before it leaves |
Customer Specification Review (beta) lists the requirements in the package and marks open items, such as a coating specification that is referenced and missing. Document Review compares the package with your procedures and quotes both. Neither checks a design against IEC 61400, and neither has any part in certification. They read documents, and an engineer decides what each finding means.
Talk through your tender review
See how OdysseyGPT reviews a tender
Tell us how your team reviews tenders today. We can walk through an example together.