OdysseyGPT

Marine and shipbuilding equipment manufacturers

Marine equipment manufacturers: check a shipyard enquiry, the class requirements and your certificates line by line

For sales, project and quality engineers at makers of pumps, valves, deck machinery, switchboards, HVAC, fire-fighting and life-saving equipment who quote to shipyards and deliver with class certificates.

By Ademola Afolabi, Founder, New Odyssey Ltd ยท Last reviewed:

The short answer

Marine equipment makers answer a shipyard enquiry by checking the yard's purchase order specification, the building specification extract, the class notation and the flag state requirements against their own datasheets, approvals and certificates. OdysseyGPT drafts that comparison from the documents, with a source quote on every row. Your engineers decide each status and class approves the equipment.

Key Takeaways

  • A shipyard enquiry is governed by four things at once: the yard's specification, the owner's building specification, the classification society's rules and the flag state.
  • Deviations cluster around approval status, the kind of certificate offered, who witnesses the works test, drawings for approval and class-required spares.
  • After award the yard expects approved drawings, approval certificates, a certificate for each unit where the rules ask for one, material certificates and works test records.
  • OdysseyGPT reads documents and quotes its sources. It does not read drawings, replace plan approval or survey, look up approval registers or certify anything.

See how OdysseyGPT reviews a tender. Tell us how your team reviews tenders today. We can walk through an example together. Book a call

How do marine equipment makers answer a shipyard enquiry?

A shipyard buys equipment for a hull number, not for a site. The enquiry for a pump set, a windlass, a switchboard or a set of fire dampers arrives as a bundle, and each part of the bundle has a different author.

What a shipyard enquiry usually contains (own summary)
DocumentWho wrote itWhat it decides for the maker
Purchase order specification, sometimes called the POS or technical purchase specificationThe yard's design or purchasing departmentScope of supply, duty, materials, interfaces, tests, drawings and delivery for this item
Extract of the building specificationThe owner and the yard, as part of the shipbuilding contractThe owner's wishes that go beyond the rules: preferred makes, materials, spares, redundancy, paint and nameplates
Class and notationThe owner chooses the classification society. The notation is written in the building specificationWhich society's rules apply, and which extra notations add requirements to your equipment
Flag stateThe owner chooses the ship's registerWhich statutory approvals apply, for example the wheel mark on a ship under an EU flag
Makers' listAgreed between the owner and the yardWhether your company is a named maker for the item, or has to be proposed and accepted
Yard standards and general conditionsThe yardDrawing format, document numbering, vibration, noise, colour, packing and warranty terms

The work is to read the whole bundle and state, item by item, what you offer. A typical order of work looks like this.

  1. Find the hull number, the classification society, the full class notation and the flag. If any is missing, ask before you quote.
  2. Check whether you are on the makers' list for the item. If not, find out how the yard wants an alternative maker proposed.
  3. List every requirement in the purchase order specification and in the building specification extract, with its clause.
  4. For each item, decide which approval route applies: an existing type approval, a design approval for this ship, a statutory approval, or none.
  5. Compare the requirements with your datasheet, standard scope, approvals held, test procedure and standard spares list.
  6. Mark each row complies, deviates, clarification or not addressed, and price what the standard offer leaves out, such as surveyor attendance and extra certificates.

The result is a compliance matrix for the yard and a technical deviation list that carries only the differences. Yards compare several makers quickly. A clear list of what is and is not approved saves a round of questions.

Which rules and standards come up in a shipyard enquiry?

Marine equipment sits under two layers. Classification rules belong to the society the owner chose. Statutory requirements come from international conventions and are applied by the flag state. The table lists what an enquiry usually names. It is our own summary at name level. Use the rules and the edition your contract names.

Rules and instruments named in shipyard enquiries (own summary)
SourceWhat it isWhat to pin down in the enquiry
Classification society rulesEach society publishes its own rules for ships. DNV, the American Bureau of Shipping (ABS), Lloyd's Register, Bureau Veritas and ClassNK are among the twelve member societies of IACSThe society, the rule edition that applies to this hull and the full class notation
IACS unified requirementsMinimum technical requirements agreed by the IACS members and written into each society's own rules. The series are lettered, for example E for electrical and electronic installations, M for machinery installations, P for pipes and pressure vessels and W for materials and weldingThe society's rules are what you are checked against. A member may set stricter requirements than the unified text
IACS unified interpretationsAgreed readings of IMO convention requirements, used when a flag state has given no instruction of its ownWhether the flag state has its own interpretation for your item
SOLAS and other IMO instrumentsThe Safety of Life at Sea convention, MARPOL for pollution prevention and COLREG for collision prevention, with the codes made under themWhich convention requirement makes your item subject to flag state approval
Marine Equipment Directive 2014/90/EUEU law for equipment on ships under an EU flag where the conventions require flag state approval. Conforming equipment carries the wheel markWhether the ship flies an EU flag and whether your item is listed in the current implementing regulation
UK marine equipment regulationsThe Merchant Shipping (Marine Equipment) Regulations 2025 for UK ships, with the technical lists in Merchant Shipping Notice MSN 1874Whether the ship is on the UK register. UK approval is given by a UK approved body and shown by the UK conformity mark
Product standardsISO, IEC, EN and national standards for the item itselfThe edition, and whether class rules or the yard's specification change anything in it

Class approval and statutory approval are separate. On a ship under an EU flag, a fire damper or a navigation light needs the wheel mark, while the switchboard beside it needs the society's approval. A yard can also ask for both on one item. The page on class type approval explains the class side. The Marine Equipment Directive page explains the EU statutory side.

One society's approval does not stand in for another's

DNV's published answers for manufacturers say that a certificate from another classification society generally cannot replace a DNV certificate, and that tests witnessed by another society are not accepted in place of its own. Other societies have their own positions. Do not offer an approval from society A against an enquiry for a ship classed by society B without saying so in the deviation list.

What goes in the deviation list for marine equipment?

The deviation list tells the yard where the offer differs from the enquiry. For marine equipment the differences are less about duty points and more about approval and evidence. These are the areas to check before the offer goes out.

Where marine equipment offers most often differ from the enquiry (own summary)
AreaWhat to check before you sign the offer
Class approval statusWhether the model offered holds a type approval certificate from the society named, whether the certificate is in date, and whether the size, rating and options offered fall inside what the certificate covers
Certificate typeWhether the yard asks for a certificate issued by the society for each unit, or accepts the maker's own works certificate or test report. The rules set a minimum and the yard may ask for more
Statutory approvalWhether the flag makes the item subject to the wheel mark or the UK conformity mark, and whether you hold that approval for the model offered
Test witnessingWhich works tests the surveyor must attend, which the yard or owner also wants to attend, the notice period, and who pays for attendance
Drawings for approvalWhich drawings go to the society, who submits them, the yard's or the maker's, and how many review rounds the delivery date allows
MaterialsWhich parts need material certificates of the type the society requires, and whether your sub-suppliers can provide them. See EN 10204 3.1 vs 3.2
Spares and toolsThe spares the class rules or the notation call for, compared with the spares the building specification asks for and your standard list
Owner's extrasPreferred makes of motors, bearings, seals or controls, material upgrades, and ambient or inclination conditions stated above your standard design basis
Documents and languageThe drawing schedule, the number of copies, the format of manuals and the language of nameplates and instructions

Say which approval route you priced

If the model has no type approval from the named society, the usual alternative is approval of the design for this ship, followed by survey of the unit. That takes time and fees. State the route, the cost and the effect on delivery in the offer. A yard that learns of it after award will treat it as your delay.

Which documents follow after award?

After the order the yard sends a drawing and document schedule. It is the marine version of a vendor data requirements list. The purchase order decides the list. These are the items a marine equipment maker should expect.

Post-award documents for marine equipment (own summary)
DocumentWhat the yard and the surveyor look for
Drawings submitted for class approvalThe drawings and calculations the rules list for the item, at a stated revision, with the society's approval stamp or comments and the reply to each comment
Drawings for yard approval and working drawingsOutline, foundation, connection and wiring information the yard needs to build the ship around the item
Type approval certificateThe certificate for the model delivered, in date, with the conditions and limits printed on it
Product or unit certificateWhere the rules require it, a certificate issued by the society for the delivered unit after survey at the works, tied to the serial number
Statutory certificatesFor an EU flag, the module certificates behind the wheel mark and the EU declaration of conformity. For the UK register, the UK equivalents
Material certificatesCertificates of the type the society requires for the listed parts, traceable to the parts by heat or cast number
Works test recordsPressure, running, load or functional test records by serial number, signed by those who witnessed them. See FAT vs SAT
Maker's declaration or certificate of conformanceThe maker's own statement that the unit meets the order. See certificate of conformance
Spares and tools listThe items supplied, set against the class-required and owner-required lists
Final documentationInstruction manuals, as-built drawings and certificates in the number of sets the order states: some for the yard, some for the ship and some for the owner's office

A checklist for the certificate set is on the class certificate checklist template page. For the register itself, see the vendor document register template.

How does OdysseyGPT help?

OdysseyGPT reads the documents you upload and checks them against the yard's written requirements. Every finding shows the passage it rests on in both documents. Document Review takes the purchase order specification and building specification extract as the base, and your datasheet, standard scope, approvals list and offer text as the documents to check. It checks in both directions and exports an editable compliance matrix with a list of deviations and clarifications. The other tools each read a narrower set.

Marine equipment documents and the tool that reads each
Your documentToolWhat it reports
Yard specification, building specification extract and your offer documentsDocument ReviewA status and two quotes for each yard requirement, and statements in your offer that the enquiry does not answer
Purchase order specification and yard standardsCustomer Specification Review (beta)A register with one line per obligation: approvals, certificates, witnessed tests, drawings and spares, each with its clause
The yard's equipment datasheet and your filled copyDatasheet Comparison (beta)Matched fields and each material difference in value, with the place each figure was read from
Offer, yard comments and your repliesDeviation Register (beta)A single record of each deviation from the offer through the clarification rounds to the yard's decision
The yard's drawing and document scheduleVDRL/MDR Tracker (beta)A register of each submission with its due date, revision and status
Material certificates and the order's material requirementsMaterial Certificate Review (beta)Grade, heat number, results and certificate type on each certificate, set against what the order asks for
Your inspection and test plan and the yard's test clausesITP Validator (beta)Tests the yard asks for that the plan leaves out, and witness points that do not match
Works test records and instrument calibration certificatesCalibration Validity Check (beta)Each instrument named in a test record matched to a certificate that was valid on the test date
Test procedure, approved drawing status and open comments before a witnessed testFAT Readiness Check (beta)Whether the documents the test depends on are in place before the surveyor and the yard travel
The final documentation folder and the yard's indexMRB Readiness Check (beta) and MRB Compiler (beta)Documents that are missing, unapproved or at the wrong revision, and a manifest in the yard's index order

The tools are grouped by stage: tender, order, inspection and handover. Makers of pumps, valves and electrical equipment who also sell to land-based buyers have their own pages.

What does a result look like?

This table is an invented example. The yard, the hull, the pump, the clause numbers, the maker's documents and every figure are made up to show how a result is laid out. Nothing in it comes from a real enquiry, a real maker, a class rule or a statutory text.

Invented example: a yard's enquiry for two fire and general service pump sets, checked against a maker's documents
Yard requirement (quoted)Maker's document (quoted)StatusNote
"Capacity 180 m3/h at 9 bar. Casing and impeller in nickel aluminium bronze." (POS-4410, 3.1)"Duty: 180 m3/h at 9.0 bar. Casing: NiAl bronze. Impeller: NiAl bronze." (Datasheet DS-FP-180, p. 1)CompliesSame duty and materials in both documents.
"Pumps shall be of a type approved by the Classification Society. A copy of the valid certificate shall be enclosed with the offer." (POS-4410, 2.2)"Type approval: certificate TA-0932, valid to 14 March 2027, pump range FP 100 to FP 150." (Approvals list AL-07, line 6)ClarificationThe certificate range quoted stops below the size offered. An engineer should check the certificate itself.
"Each pump shall be delivered with a certificate issued by the Classification Society." (POS-4410, 6.1)"Pumps are supplied with the manufacturer's works certificate." (Standard scope SS-12, p. 3)DeviatesA maker's certificate is offered where the yard asks for one issued by the society.
"Hydrostatic and running tests shall be witnessed by the Surveyor and the Builder. Ten working days' notice is required." (POS-4410, 6.3)"Witnessed testing is available at extra cost. Notice of test: 5 working days." (Quality plan QP-3, p. 4)DeviatesAttendance is priced as an option and the notice period is shorter than asked.
"Material certificates for casing, impeller and shaft shall be of the type required by the Rules." (POS-4410, 6.4)"Material certificates to EN 10204 type 3.1 for casing and impeller." (Standard scope SS-12, p. 3)ClarificationThe shaft is not mentioned, and the maker's text does not say the type matches the rules.
"Drawings listed in Annex B shall be submitted for approval within four weeks of order." (POS-4410, 7.1)"Approval drawings: 6 weeks after receipt of order." (Offer letter, p. 2)DeviatesThe submission period offered is two weeks longer.
"Spare parts shall be as required by the Rules and, in addition, one mechanical seal per pump." (Building specification extract, 541.3)"Standard spares: one set of bearings and one set of wear rings per pump type." (Spares list SP-FP, p. 1)DeviatesNo mechanical seal is listed. The class-required spares are not referred to.
"Motors shall be of a make on the Makers' List, item E-12." (POS-4410, 4.2)No matching statement found in the documents supplied.Not addressedThe motor make is not stated in the datasheet or the offer.

A sales or project engineer opens both quotes on each row and confirms or changes the status. Rows left as deviates or clarification go into the deviation list and the questions to the yard. OdysseyGPT did not open the type approval certificate in a register. It read the line in the maker's approvals list.

Where OdysseyGPT falls short

  • It does not replace plan approval or survey. The classification society approves drawings and its surveyor attends tests. OdysseyGPT has no part in either and issues no certificate.
  • It does not read drawings. General arrangements, sectional drawings, piping diagrams and wiring diagrams are outside what it checks. A requirement that appears only on a drawing is missed.
  • It does not look up approval registers. It cannot tell you whether a type approval certificate is still valid in a society's database or in the EU portal. It reads the certificate or list you upload.
  • It holds no class rules, IACS resolutions or statutory texts. A requirement that sits only inside the rules is checked only if you upload that edition as readable text.
  • It does not judge whether a certificate covers the model, size or option you offer. It shows what the certificate says and what the yard asks for. An engineer decides.
  • It does no design work. It does not size a pump, rate a switchboard or calculate a windlass load.
  • It can pair a requirement with the wrong line or miss one, most often where the specification repeats similar clauses for several items. The quotes are there so a person can catch this.
  • Tools that carry a beta marker on this page are available on request, and we set each team up ourselves.

Talk through your tender review

See how OdysseyGPT reviews a tender

Tell us how your team reviews tenders today. We can walk through an example together.

Book a call

Buyer questions

20 questions bid engineers, proposal engineers and buyers ask. Last reviewed:

What is in a shipyard enquiry for marine equipment?

Usually a purchase order specification for the item, an extract of the owner's building specification, the name of the classification society with the class notation, the flag, the makers' list and the yard's own standards. Each has a different author. Read all of them, because a requirement for a certificate or a preferred make often appears in only one.

What is a makers' list in shipbuilding?

It is the list, agreed between the owner and the shipyard, of the manufacturers that may supply each item of equipment for a ship. If your company is named for the item, the yard can buy from you without further approval. If not, the yard normally has to propose you to the owner, which takes time and may be refused.

What is a purchase order specification from a shipyard?

It is the yard's technical specification for one equipment item or package. It sets the scope of supply, duty, materials, interfaces, class and flag requirements, tests, drawings and delivery. It is written by the yard and sits beneath the building specification agreed with the owner. Where the two differ, ask the yard which one governs your order.

What is a class notation and why does it matter to an equipment maker?

A class notation is the set of symbols and words a classification society assigns to a ship to state what it is classed as and which optional features it has. Extra notations can add requirements to equipment, so a product approved for a standard ship may not meet them. Ask for the full notation before you quote.

What are the class approval requirements for marine equipment?

They depend on the society and the item. In general the society may ask for approval of the design, either as a type approval or for the one ship, for tests at the works with its surveyor present, and for certificates for the unit and its materials. The society's rules, in the edition the contract names, set the list. See class type approval.

What is the difference between type approval and a product certificate?

Type approval covers a design for repeated use and is obtained before any order. A product or unit certificate covers one delivered unit and is issued after a surveyor has attended at the works. One is about the design and the other about the item shipped. An order can require both, so state in the offer which you include.

Do I need type approval to quote to a shipyard?

Not always. Where no type approval exists, the usual alternative is approval of the design for that ship, followed by survey of the unit. It costs time and fees, and many yards prefer type approved products for that reason. If you offer without type approval, say which route you have priced and how it affects delivery.

Which certificates does a shipyard expect with marine equipment?

Typically the type approval certificate for the model, a certificate for the unit where the rules require one, material certificates for the listed parts, works test records and the maker's own declaration. Statutory items for an EU flag also need the certificates behind the wheel mark and an EU declaration of conformity. The purchase order sets the exact list.

Who witnesses the works test on marine equipment?

The classification society's surveyor, where the rules require a witnessed test. The shipyard and the owner's representative may also attend if the purchase order gives them that right. Each party needs notice, and each attendance is a hold on dispatch. Check the notice periods and who pays for attendance before you fix a delivery date.

Which drawings have to be submitted for class approval?

The society's rules list them for each kind of equipment, and the yard's specification usually repeats or adds to the list. Agree at the start who submits them, the maker or the yard, and how comments come back. A type approved product needs fewer, but drawings for the installation on this ship may still need approval.

Which material certificates does class require?

The society's rules say, for each kind of part, whether the certificate must be issued or endorsed by its surveyor or whether the manufacturer's own certificate is enough. It has to be ordered from the material supplier at the start and cannot be added later. For the certificate types in general, see EN 10204 3.1 vs 3.2.

When does marine equipment need the wheel mark?

When it will be placed on a ship flying an EU flag and is an item for which international conventions require flag state approval. The list of items sits in a Commission implementing regulation that is replaced regularly. Machinery that is only subject to class rules does not carry it. See the Marine Equipment Directive page.

Is the wheel mark the same as class type approval?

No. The wheel mark is a statutory mark under EU law and follows assessment by a notified body. Class type approval is given by a classification society under its own rules. The same organisation may do both, in separate roles, and the certificates are different. A yard can ask for both on a single item.

What applies to equipment for a UK-flagged ship?

The Merchant Shipping (Marine Equipment) Regulations 2025. Approval is given by a UK approved body designated by the Maritime and Coastguard Agency, and the manufacturer affixes a UK conformity mark. The lists of equipment and standards are in Merchant Shipping Notice MSN 1874, which is amended regularly. Read the current amendment on gov.uk before you quote.

What are IACS unified requirements?

They are minimum technical requirements agreed by the member societies of the International Association of Classification Societies. Each member writes them into its own rules and may ask for more. For a maker, the society's own rules are what the equipment is checked against. A unified requirement explains why several societies ask for much the same thing.

What goes in a deviation list for a shipyard enquiry?

Each point where your offer differs from the enquiry, with the clause, what you offer and why. For marine equipment the usual entries concern approval status, the kind of certificate offered, test witnessing, the drawing submission period, material certificates, spares and preferred makes. The technical deviation list guide shows a format you can adapt.

How does OdysseyGPT check a shipyard enquiry against our offer?

You upload the yard's specification and your offer documents. Document Review lists each requirement, finds the matching statement in your documents and proposes a status of complies, deviates, clarification or not addressed, with a quote from both sides. It also reports statements in your offer that the enquiry does not answer. Your engineer confirms each row.

Does OdysseyGPT check whether a type approval certificate is still valid?

No. It does not query a classification society's register or the EU portal for marine equipment. If you upload the certificate, it can show the expiry date and scope printed on it next to what the enquiry asks for. Checking the live register, and deciding whether the certificate covers the model offered, stays with your engineer.

Does OdysseyGPT replace class plan approval or survey?

No. The classification society approves drawings and its surveyor attends tests and issues certificates. OdysseyGPT reads written documents and compares them with the yard's written requirements. It does not read drawings, it holds no class rules, and it certifies nothing. It helps your team find gaps in the paperwork before the yard or the surveyor does.

Can OdysseyGPT track the yard's drawing and document schedule?

VDRL/MDR Tracker (beta) turns the yard's schedule into a register with one line per submission, its due date, revision and status. MRB Readiness Check (beta) then compares the final documentation folder with the yard's index and lists what is missing or at the wrong revision. Neither tool submits anything to the yard or to the society.

Frequently asked questions

Who prepares the technical offer at a marine equipment maker?

Usually a sales or application engineer, with the approvals or certification engineer for class and flag questions, design for drawings and materials, and quality for test witnessing, certificates and the document schedule.

Does OdysseyGPT replace class approval or survey?

No. It reads documents such as specifications, datasheets, approvals lists and certificates, and compares them with the yard's written requirements. Approval of drawings and survey of equipment are done by the classification society.

Can OdysseyGPT check that a type approval certificate is still valid?

It can read the expiry date and scope printed on a certificate you upload and compare them with the enquiry. It does not query a society's register. Check the register yourself before you rely on a certificate.

Do class requirements and flag state requirements both apply to one item?

They can. Class rules come from the society the owner chose. Statutory approval comes from the conventions as applied by the flag. Some items have to satisfy both, with separate certificates.

References

About IACS

International Association of Classification Societies

Twelve member societies and the role of the association. Read 15 Nov 2026.

Visit source

Unified Requirements

International Association of Classification Societies

What unified requirements are and the lettered series. No resolution text is reproduced.

Visit source

Unified Interpretations

International Association of Classification Societies

Visit source

Certification of materials and components

DNV

Type approval, case-by-case design approval and product certification described at concept level.

Visit source

Certification of materials and components: frequently asked questions

DNV

Source for the statements on other societies' certificates and witnessed tests.

Visit source

Type approval procedure

American Bureau of Shipping

Visit source

Type approval

Lloyd's Register

Visit source

Directive 2014/90/EU on marine equipment

EUR-Lex

Visit source

Marine equipment

European Maritime Safety Agency

Visit source

The Merchant Shipping (Marine Equipment) Regulations 2025

legislation.gov.uk

Visit source

MSN 1874 (M+F) Amendment 12: marine equipment

Maritime and Coastguard Agency

Published 15 October 2026. Check gov.uk for a later amendment.

Visit source

Related Pages