What are AWWA standards?
The American Water Works Association (AWWA) publishes more than 200 standards for the water sector. They are written by volunteer committees, go through public review and are accredited by the American National Standards Institute, which is why the full designation reads ANSI/AWWA followed by the number. AWWA describes them as minimum requirements. A utility or its engineer adopts one by naming it in a specification or purchase document.
Two points matter to a supplier. First, AWWA does not test, certify or approve any product. A phrase such as "AWWA approved" in a specification can only mean that the product conforms to the named standard, and the evidence is the maker's statement and the records the standard requires. Second, the standards are not complete purchase specifications. Each one lists options and information the purchaser is expected to supply, and until those are settled the product is not fully defined.
AWWA also publishes manuals of practice, numbered with an M. A manual gives guidance on design or operation. It is not a standard, and a specification that cites one is pointing to guidance, not to a set of product requirements.
How are AWWA standards organised?
AWWA lists its standards by subject, and the letter at the front of each number follows the subject. The table shows the groups an equipment maker will see cited. It is our own summary of the public list.
| Group | Numbering | What it covers | Who meets it |
|---|---|---|---|
| Source | A | Wells and source water | Well drillers and well equipment suppliers |
| Treatment | B | Filter media, softening, membrane systems and treatment chemicals for disinfection, coagulation, corrosion control, taste and odour control and fluoridation | Media and chemical suppliers, and makers of membrane and filter packages |
| Pipe and accessories | C | Ductile-iron, steel, concrete and plastic pipe and fittings, their linings and coatings, valves and hydrants, pipe installation, disinfection of facilities, meters and service lines | Pipe and fitting makers, valve, hydrant, actuator and gate makers, coating applicators and meter makers |
| Storage | D | Water storage tanks and their coating and inspection | Tank fabricators and erectors |
| Pumps | E | Submersible vertical turbine pumps, and horizontal centrifugal and vertical line shaft pumps | Pump makers |
| Plant equipment | F | Fibreglass troughs, launders, weir plates and baffles, ultraviolet disinfection systems and ozone systems | Makers of clarifier and filter internals and disinfection equipment |
| Utility management | G | How a utility runs its treatment plants, distribution system, security and conservation programmes | The utility itself. A supplier seldom has to conform to these |
Within the pipe and accessories group the hundreds digit narrows the subject. The C100s are ductile-iron pipe and fittings, the C200s steel pipe and its coatings, and the C500s valves, hydrants, actuators and slide gates. A specification section for valves will usually cite several numbers from the C500 range together with a coating standard.
Which AWWA valve standards do makers meet most?
The valve standards are product standards. Each covers one type of valve for waterworks service and deals with materials, design, testing and the information to be supplied. The table gives the subject of each at title level. Size ranges, pressure classes and test requirements are in the standards themselves and change between editions.
| Standard | Subject | What a bid engineer should note |
|---|---|---|
| AWWA C500 | Metal-seated gate valves for water supply service | The older gate valve type. Still named for large sizes and for replacement work |
| AWWA C504 | Rubber-seated butterfly valves | The butterfly valve standard that plant and transmission main specifications cite most. The standard defines valve classes, and the specification should state which one applies |
| AWWA C509 | Resilient-seated gate valves for water supply service | Covers iron-body gate valves with a resilient seat, in non-rising stem and outside screw and yoke forms |
| AWWA C515 | Reduced-wall, resilient-seated gate valves for water supply service | A separate standard from C509 for a lighter body. A specification that names only one of the two may exclude the other |
| AWWA C507 | Ball valves | Check the size range in the title of the edition named against the schedule |
| AWWA C508 and C518 | Swing-check valves and double-disc swing-check valves for waterworks service | Check which closure control options the section asks for |
| AWWA C512 | Air-release, air and vacuum, and combination air valves for water and wastewater service | One of the valve standards that names wastewater service in its title |
| AWWA C516 and C519 | Large-diameter rubber-seated butterfly valves, and high-performance waterworks butterfly valves | Separate standards from C504. Check that the number cited matches the valve size and type on the schedule |
| AWWA C517 | Resilient-seated, cast-iron eccentric plug valves | Common in wastewater and sludge service |
| AWWA C520 | Knife-gate valves | Common on sludge and slurry lines |
| AWWA C530 | Pilot-operated control valves | Pressure reducing, relief and altitude duties |
| AWWA C541 and C542 | Hydraulic and pneumatic cylinder and vane-type actuators, and electric motor actuators, for valves and slide gates | Often supplied by a third party. The valve maker still answers for the assembly in the submittal |
| AWWA C560 to C563 | Slide gates: cast-iron, fabricated stainless-steel, fabricated aluminium and fabricated composite | The material decides the standard. The section's leakage and deflection wording may go further than the standard |
AWWA C504 is the one searched for most. In outline, it sets minimum requirements for rubber-seated butterfly valves in waterworks service: materials, design, testing and the data the maker supplies. Recent editions describe its use across raw, potable, waste and reclaimed water. The classes and test details are for the reader to take from the edition named in the contract.
Valves for oil, gas and process plants are built to a different family of standards. If your product range serves both markets, see the API valve standards hub and the page for valve manufacturers.
Which AWWA pump, coating and lining standards come up?
| Standard | Subject | Where it appears |
|---|---|---|
| AWWA E102 | Submersible vertical turbine pumps | Well and booster pump sections |
| AWWA E103 | Horizontal centrifugal and vertical line shaft pumps | High-service, raw water and transfer pump sections, often next to a Hydraulic Institute test standard |
| AWWA C550 | Protective interior coatings for valves and hydrants | Cited inside most valve sections for the wetted surfaces of the valve |
| AWWA C116 | Protective fusion-bonded epoxy coatings for the interior and exterior surfaces of ductile-iron and grey-iron fittings | Fitting and some valve body sections |
| AWWA C210 | Liquid-epoxy coatings and linings for steel water pipe and fittings | Steel pipe, fabricated steel fittings and sometimes fabricated equipment |
| AWWA C213 | Fusion-bonded epoxy coatings and linings for steel water pipe and fittings | Steel pipe and fittings |
| AWWA C104 | Cement-mortar lining for ductile-iron pipe and fittings | Ductile-iron pipe sections |
A coating standard and a drinking water contact standard answer different questions. The AWWA coating standard deals with how the coating is applied and tested. Whether the coating material is acceptable in contact with drinking water is normally covered by a listing to NSF/ANSI/CAN 61, which project specifications commonly call for alongside the AWWA number. The exterior paint system for exposed equipment is usually in a separate painting section of the project manual, not in an AWWA standard.
What to check in a specification against the AWWA standard it names
| Check | Why it matters |
|---|---|
| The standard number and the edition in the section, the schedule and the purchase order | Editions are revised every few years and scope can change. Documents in one package often cite different ones |
| Whether the number fits the valve type and size on the schedule | Similar valves fall under different standards by size, wall thickness or seat type, as with C504 and C516 or C509 and C515 |
| The purchaser options and data the standard leaves to the buyer | If the section is silent on an option, your standard choice becomes the offer. Say which you have assumed |
| Requirements in the section that go beyond the standard | Named materials, heavier shafts, thicker coatings or extra tests are common. Each is a cost or an exception |
| Class, rating and service stated in the section | The standard offers classes. The section has to pick one, and the schedule sometimes picks another |
| Test requirements: which tests, on how many units, witnessed or not | A proof-of-design test already on file and a production test on every valve are different things |
| Coating standard, coating material and drinking water contact listing | Three separate requirements that are often written as one sentence |
| Actuator standard and who supplies the actuator | The actuator may be to C541 or C542 and bought in. The submittal must still show the assembled unit meets the section |
| The wording of the conformance statement wanted | Some sections want an affidavit of compliance in set words, signed by an officer of the maker |
| Records to be submitted: test reports, material certificates, coating records | They belong on the submittal log with a date |
| Domestic preference clauses alongside the standard | Conforming to the standard says nothing about where the casting was poured |
OdysseyGPT does not hold AWWA standards and does not check a product against one. Document Review checks the specification section against your own product data, statements and test procedures and drafts a matrix and a list of exceptions, with a quote from both documents on every row. If you upload the edition of the standard your contract names, as readable text, it can be part of the review. After award, the ITP Validator (beta) compares your inspection and test plan with the section's test articles. For how the whole bid and construction submittal fit together, see the page for water and wastewater equipment manufacturers.
Talk through your tender review
See how OdysseyGPT reviews a tender
Tell us how your team reviews tenders today. We can walk through an example together.