What a factory acceptance test is
Factory acceptance testing is the last major step before engineered equipment leaves the works. The manufacturer sets up the finished pump, valve, skid, panel or package and runs the tests the order requires while the customer watches. The purpose is simple: find any fault while the equipment is still with the people and tools that built it.
What gets tested depends on the equipment. A pump has a performance test. A valve has pressure and leakage tests. A skid or control panel has functional, interlock and alarm checks. A FAT also covers checks that are not tests in the strict sense: dimensions, nameplate data, tagging, painting and a review of the documents.
This page explains the test itself. When you are ready to prepare for one, the factory acceptance test checklist lists what to have in place.
Find out if your next FAT is ready to run
Bring the FAT procedure for an upcoming test, with the drawings, calibration certificates, NCR register and punch list. We run the readiness check and show each blocker and where it was read.
Who attends a FAT
| Role | From | What they do at the FAT |
|---|---|---|
| Test engineer | Manufacturer | Runs the test to the procedure and records the readings |
| Quality engineer | Manufacturer | Presents the documents, records punch items and controls the test record |
| Project manager | Manufacturer | Hosts the visit and agrees actions and dates |
| Customer's engineer | Buyer or EPC contractor | Witnesses the test and accepts or comments on the results |
| Third-party inspector | Inspection agency | Witnesses on behalf of the buyer or end user and signs the record |
| End user's representative | Plant owner or operator | Attends where the order gives them the right, often for operability points |
| Sub-supplier specialist | Supplier of a major item, such as a drive or control system | Supports the test of their own equipment |
The FAT is normally a hold point for the customer on the ITP. See hold point vs witness point for what that means for notice and waivers.
What a FAT procedure or FAT protocol contains
The FAT procedure is the document the test is run to. Some industries, pharmaceutical equipment in particular, call it a FAT protocol. The manufacturer writes it from the customer's specification and datasheets, and the customer approves it before the test date.
| Section | What it says |
|---|---|
| Scope and equipment | The purchase order, tag numbers and exactly what is under test |
| Reference documents | Specification, datasheets, drawings and standards with revisions |
| Prerequisites | What must be complete before the test: earlier inspections, documents, calibration, safety checks |
| Test set-up | Arrangement, utilities, test medium, instruments and their ranges |
| Test steps | Each test in order, with the method and the readings to take |
| Acceptance criteria | The value or behaviour that counts as a pass for each step, with its source |
| Test record sheets | The forms for readings, results and signatures |
| Punch list | How faults and open points are recorded, graded and closed |
| Roles and safety | Who does what, and the safety rules for the test area |
The weakest part of most procedures is the acceptance criteria. Each one should point to a line in the datasheet or specification, so nobody argues on the day about what a pass looks like.
How to perform a factory acceptance test
- Write the FAT procedure and have the customer approve it.
- Run the tests yourself first, as a dry run or pre-FAT, and fix what you find.
- Check readiness: approved documents, instruments in calibration, open NCRs closed, safety prerequisites met.
- Send the witness notice with the lead time the order requires.
- Hold an opening meeting: scope, procedure revision, safety and the plan for the day.
- Review the documents: certificates, earlier inspection records and calibration.
- Carry out the visual and dimensional checks, then each test step, recording every reading.
- Record each fault or open point on the punch list as it is found.
- Hold a closing meeting, agree the punch list and its dates, and sign the test record.
- Close the punch items and issue the FAT report.
A worked example. A dosing skid is due for FAT on a Tuesday. The procedure is approved and the customer's engineer has flown in. During the document review, the inspector sees that the pressure transmitter used for the leak test has a calibration certificate that expired the week before. The leak test cannot be accepted. The team loses a day finding a calibrated instrument, and the customer extends the visit at the manufacturer's cost. A readiness check a week earlier would have found the date.
Factory acceptance test documents, before and after
- Before: the approved FAT procedure, approved drawings and datasheets, the ITP, calibration certificates for every test instrument, the NCR register, material and inspection records, and the witness notice.
- During: the completed test record sheets, the punch list and the attendance sheet.
- After: the FAT report, the signed punch list with closure evidence, and the release for shipment.
The punch list deserves its own care. See the FAT punch list guide for how to grade and close items, and the FAT readiness checklist template for a form to prepare with. Once the FAT is signed, the customer's inspector can issue the inspection release note.
FAT and SAT
The site acceptance test (SAT) repeats the proof after the equipment is installed, connected to the real utilities and process. The FAT shows the equipment was built right. The SAT shows it still works after transport and installation, in its real setting. The full comparison is in FAT vs SAT.
How OdysseyGPT checks a factory acceptance test is ready
FAT Readiness Check (beta) reviews whether a factory acceptance test is ready to go ahead. You upload the FAT procedure. You can add the drawings, datasheets, the ITP, calibration evidence, the NCR register and the punch list.
- It checks the customer's witness requirements.
- It blocks on outstanding NCRs.
- It checks instrumentation readiness.
- It checks safety prerequisites.
- You get a readiness verdict, with hard blockers listed separately from review items.
- Each finding quotes the procedure, register or certificate behind it, and exports to CSV or JSON for your FAT preparation tracker.
Your test and quality engineers review each finding and decide whether the date holds.
See the blockers a week before the customer flies in
Send one FAT procedure and its supporting documents before the call. You will see the verdict, the hard blockers and the quoted source for each, in time to fix them.
See it on your own documents
Run the FAT once
Choose a FAT on your schedule. Bring its procedure, calibration evidence and NCR register to a demo and leave with a readiness verdict and the list of what to close.