What is ISO 17665?
ISO 17665, Sterilization of health care products, Moist heat, sets requirements for the development, validation and routine control of a moist heat sterilization process for medical devices. It also gives guidance that explains those requirements. It applies in both health care facilities and industry, and covers saturated steam processes and what it calls contained product processes.
It is a process standard. It does not say how a sterilizer is built. That is the job of the machine standards: EN 285 for large steam sterilizers and EN 13060 for small ones. ISO 17665 says how the person responsible for the process shows that the process, run in a particular machine with particular loads, does what it should, and keeps doing it.
Which edition is current?
ISO 17665:2024 was published in 2024 as a single document. It replaced three earlier documents: ISO 17665-1:2006, which held the requirements, and two technical specifications, ISO/TS 17665-2:2009 and ISO/TS 17665-3:2013, which held guidance. The European adoption is EN ISO 17665:2024. In January 2026 it was added to the list of harmonised standards for the EU Medical Device Regulation by Commission Implementing Decision (EU) 2026/193.
The requirements are followed by informative annexes. According to the British Standards Institution's summary, these cover basic principles, microbiological and physical approaches to process development and validation, examples of processes, the use of steam tables, use in health care and in industry, and assigning devices to product families and load configurations.
Check which edition your tender names
Tender documents are often reused. Many still cite ISO 17665-1:2006 or simply "ISO 17665" with no year. If the edition is unclear, or the tender names a withdrawn part, raise a clarification and state in your offer which edition your documents follow.
ISO 17665 and EN 285: who does what
| EN 285 or EN 13060 | ISO 17665 | |
|---|---|---|
| Subject | The sterilizer: design, performance, safety and tests | The sterilization process: development, validation and routine control |
| Who normally answers for it | The sterilizer manufacturer | The organisation that runs the process, such as the hospital or a device manufacturer |
| Typical evidence | Type test and works test results, declarations and machine documents | Qualification protocols and reports, routine monitoring records and requalification records |
| Where the supplier appears | Throughout | As the source of equipment information, and as the party contracted to carry out or support qualification |
English national guidance draws the same line. HTM 01-01 Part C says the manufacturer's type and works tests are defined in EN 285, while the tests on installation are defined in ISO 17665 and the guidance itself. It adds that responsibility for testing on site depends on the contract. That last point is why the tender wording matters.
The validation stages a tender refers to
Validation under ISO 17665 is usually described in three stages. The descriptions below are our own summary, not the standard's definitions.
| Stage | What it shows | What the supplier usually contributes |
|---|---|---|
| Installation qualification (IQ) | The equipment and its services have been supplied and installed as specified | Installation drawings, utility requirements, installation checks, calibration certificates and machine documents |
| Operational qualification (OQ) | The installed equipment runs its cycles within set limits | Cycle descriptions, parameters and tolerances, test procedures and, where contracted, the tests themselves |
| Performance qualification (PQ) | The process gives consistent results with the user's own loads | Support and attendance where contracted. The loads, packaging and acceptance decisions belong to the user |
After validation, the standard expects routine monitoring and control of every cycle, and a way to keep the process effective over time: maintenance, calibration, change control and requalification. Tenders pass part of this on as requirements for recording instruments, batch records, maintenance schedules and a requalification service. See the glossary entry on autoclave validation.
What the customer asks the equipment supplier to provide
A buyer who must validate to ISO 17665 needs information that only the maker has. In a tender this appears as a list of documents and services. The usual ones are below.
- A description of the sterilizer and each operating cycle, with the process parameters and their tolerances.
- Evidence of the machine standard: type test and works test results to EN 285 or EN 13060, and the declarations that go with them.
- The services the machine needs: steam quality, water quality, compressed air, drainage, electrical supply and ventilation.
- Details of the measuring, control and recording instruments, with calibration certificates and the method for checking calibration on site.
- Installation instructions and the checks to be made at installation.
- Qualification protocols, or support for the buyer's own protocols, and the people and test equipment to run the agreed stages.
- Instructions for use, a maintenance schedule and the tests to repeat after maintenance or modification.
- Records the process will produce for each cycle, and how they are stored and exported.
Steam supply deserves its own line. Guidance such as HTM 01-01 Part C lists steam quality tests for non-condensable gases, dryness and superheat among the validation tests. If the steam comes from the hospital's plant, say so, and state what your machine needs at the point of connection. If your offer includes a steam generator, the steam quality becomes your responsibility.
What to check in a tender against ISO 17665
| Check | Why it matters |
|---|---|
| Edition of ISO 17665 named, and whether it matches the other documents in the package | Older tenders cite the 2006 part and the withdrawn technical specifications |
| Who carries out IQ, OQ and PQ: the supplier, the hospital's own engineer or a third party | On-site testing is contract-dependent, and it is days of work with test equipment |
| Who writes and who approves the qualification protocols | Approval by the buyer's engineer adds review time before testing can start |
| Which tests are listed, and whether national guidance adds to them | Guidance such as HTM 01-01 sets its own schedule of validation tests |
| Who supplies test instruments, test loads and indicators | Calibrated loggers and reference loads are a cost if they fall to you |
| Calibration requirements for test instruments | Certificates must be valid on the day of each test and traceable |
| Steam and other utilities: who is responsible for quality at the point of connection | A failed test caused by the building's steam is still a failed test |
| Loads, product families and load configurations the buyer intends to process | The offered cycles must suit them, and PQ is built around them |
| Routine monitoring and records the buyer expects from the machine | Independent recording, batch records and data export are common tender lines |
| Requalification: frequency, scope and whether it is part of a service contract | Periodic requalification is often priced with the tender, and English guidance sets yearly tests |
| What happens after a modification or software change | Changes can trigger requalification, and the tender may place that cost on you |
| Documents, language and format for the validation file | They become part of the handover dossier |
Write each gap as a row in your technical deviation list. A layout for this sector is on the sterilizer tender compliance matrix template page. OdysseyGPT's Document Review checks the tender package against your datasheets, standard qualification protocols and offer text, and drafts the compliance matrix and deviation list with a quote for each row. After award, the ITP Validator (beta) checks your inspection and test plan against the buyer's quality requirements, and the Calibration Validity Check (beta) matches each test instrument on your reports to its certificate.
What OdysseyGPT does not do
OdysseyGPT reads documents. It does not validate a sterilization process, run or judge a qualification test, or decide whether a process is effective. It is not a medical device and does not replace your quality management system or regulatory affairs work. Your engineers decide every status. See OdysseyGPT for manufacturing.
Talk through your tender review
See how OdysseyGPT reviews a tender
Tell us how your team reviews tenders today. We can walk through an example together.