OdysseyGPT

Glossary term

Bowie-Dick Test

A steam penetration test for porous-load steam sterilizers. A chemical indicator sheet inside a standard test pack shows whether air was removed and steam reached the centre evenly.

Last reviewed by the OdysseyGPT team

What it is

The Bowie-Dick test is a steam penetration test for porous-load steam sterilizers. A chemical indicator sheet inside a standard test pack changes colour evenly if air was removed and steam reached the centre. It tests the sterilizer's air removal. It does not prove that a production load was sterilized.

Key Takeaways

  • It tests air removal and steam penetration, not sterility.
  • An even colour change on the indicator sheet is a pass.
  • EN 285 describes the test. ISO 11140 covers the indicators.
  • A failure points to air removal, a leak or the steam supply.

Why it matters

Steam sterilizes only the surfaces it reaches. In a wrapped or porous load, air left in the chamber, an air leak or non-condensable gases in the steam supply can collect inside the load and keep steam out. The Bowie-Dick test checks for this. A chemical indicator sheet is placed in the centre of a standard test pack, and the pack is run on its own in a dedicated test cycle. An even colour change across the sheet is a pass. A paler or unchanged area, usually in the middle, shows that steam did not penetrate evenly. The test is named after J. Bowie and J. Dick, who described it in the 1960s using a stack of towels and autoclave tape. Today EN 285 describes the test with a pack of cotton sheets, and the ISO 11140 series covers the indicator sheets and the indicator systems sold as alternatives to the pack. Guidance such as HTM 01-01 Part C in England has the user run the test daily on porous-load sterilizers, and it appears among the validation and periodic tests. A pass shows that air removal and steam penetration were adequate in that cycle. It does not show that sterilizing conditions were reached in a production load.

How OdysseyGPT uses it

OdysseyGPT does not run or read a Bowie-Dick test. A tender line that asks for a Bowie-Dick test cycle, a test pack or test records is listed by Document Review like any other requirement, with its clause quoted and checked against your datasheet and test procedures. ITP Validator (beta) checks whether your inspection and test plan includes the tests the buyer's quality requirements name.

Evaluation questions

How does the Bowie-Dick test appear in a sterilizer tender?

Usually as a requirement for a dedicated test cycle on the machine, as one of the tests in the factory and site test schedule, and sometimes as a supply of test packs or an alternative indicator system.

Frequently asked questions

What does a Bowie-Dick test check?

Whether air has been removed from the chamber and a standard test pack, and whether steam has penetrated the pack quickly and evenly. It is a test of the sterilizer, not of a production load.

How often is a Bowie-Dick test done?

Follow the standard and guidance that apply to the site. English guidance, HTM 01-01 Part C, lists it as a daily test by the user on porous-load sterilizers, and again in the weekly, quarterly and yearly tests.

What causes a Bowie-Dick test to fail?

Poor air removal, an air leak such as a damaged door seal, or non-condensable gases in the steam supply. A failure needs corrective action, usually starting with an air leakage test and checks on the pressure sensors and the steam.

References

Health Technical Memorandum 01-01 Part C: Steam sterilization

Department of Health / NHS England

Free guidance for England.

Visit source

ISO 11140-4: Sterilization of health care products. Chemical indicators. Part 4: indicators as an alternative to the Bowie and Dick-type test for detection of steam penetration

ISO

Paid standard.

Visit source

EN 285: Sterilization. Steam sterilizers. Large sterilizers

CEN

Paid standard.

Related Pages