Autoclave Validation
The documented testing that shows a steam sterilizer, as installed, runs a sterilization process that gives consistent results with the user's loads.
Last reviewed by the OdysseyGPT team
What it is
Autoclave validation is the documented testing that shows an installed steam sterilizer runs a process that gives consistent results with the user's loads. It is usually done to ISO 17665 in three stages: installation, operational and performance qualification. It is separate from the manufacturer's type and works tests.
Key Takeaways
- Validation is done on the installed machine, not at the factory.
- The usual stages are IQ, OQ and PQ, with ISO 17665 as the reference.
- Type and works tests to EN 285 are a different thing.
- The contract decides which stages the supplier carries out.
Why it matters
The result of sterilization cannot be confirmed by inspecting or testing the product afterwards. The process is therefore validated before use, monitored on every cycle and checked again at intervals. For steam sterilization the usual reference is ISO 17665, and validation is described in three stages. Installation qualification (IQ) shows that the sterilizer and its services have been supplied and installed as specified. Operational qualification (OQ) shows that the installed machine runs its cycles within set limits. Performance qualification (PQ) shows that the process gives consistent results with the user's own loads. Validation is different from the manufacturer's type tests and works tests, which belong to the machine standard, EN 285 or EN 13060, and are done before delivery. National guidance can add tests and roles. In England, HTM 01-01 Part C lists validation tests that include steam quality, thermometric, air leakage, air detector and load dryness tests, and sets daily, weekly, quarterly and yearly periodic tests. Who carries out each stage depends on the contract. A sterilizer is also tested again before it returns to service after a modification. In a tender, check which stages fall to the supplier, who supplies test instruments, and which documents are wanted.
How OdysseyGPT uses it
OdysseyGPT does not validate an autoclave and runs no tests. Document Review checks the validation requirements in a tender against your offer documents and quotes each source. Calibration Validity Check (beta) matches each instrument named on your test reports to its calibration certificate and checks it was valid on the day of use. Your engineers decide every finding.
Evaluation questions
Is a factory acceptance test the same as validation?
No. A factory acceptance test is run at the manufacturer's works before delivery. Validation is done after installation, with the site's own steam and services and the user's loads. A tender may ask for both.
Frequently asked questions
What are IQ, OQ and PQ for an autoclave?
Installation qualification shows the machine and its services are installed as specified. Operational qualification shows it runs its cycles within set limits. Performance qualification shows the process gives consistent results with the user's own loads.
Who validates an autoclave?
The organisation that runs the process is responsible. The tests are done by qualified people, who may be the manufacturer's engineers, the hospital's own or a third party. The contract says who does which stage.
How often is an autoclave revalidated?
It depends on the standard, the national guidance and the user's procedures. English guidance, HTM 01-01 Part C, sets a yearly schedule of revalidation tests, with daily, weekly and quarterly tests between them.
References
Health Technical Memorandum 01-01 Part C: Steam sterilization
Department of Health / NHS England
Free guidance for England.
ISO 17665:2024 Sterilization of health care products. Moist heat
ISO
Paid standard.