What is EN 15085?
EN 15085, Railway applications: Welding of railway vehicles and components, is a CEN series. It applies to welding of metallic materials when rail vehicles and their parts are built and when they are maintained. It replaced older national rules for rail welding, and train builders across Europe and beyond now write it into their purchase specifications.
| Part | Title | Edition listed | What it means for a supplier |
|---|---|---|---|
| EN 15085-1 | General | 2023 | Terms and the general framework the other parts use |
| EN 15085-2 | Requirements for welding manufacturer | 2020 with amendment A2:2025 | Classification levels, the types of activity a manufacturer performs and what it must show to demonstrate conformance. This is the part a certificate is issued to |
| EN 15085-3 | Design requirements | 2022 with amendment A1:2023 | How the designer classifies each welded joint and what goes on the drawing |
| EN 15085-4 | Production requirements | 2023 | Preparation and execution of the welding work in the shop |
| EN 15085-5 | Inspection, testing and documentation | 2023 | The inspections and tests on welds, destructive and non-destructive, and the documents needed to declare conformity |
| EN 15085-6 | Maintenance welding requirements | 2022 | Welding done during repair and overhaul of vehicles in service |
National bodies publish each part under their own prefix, for example BS EN, DIN EN or NF EN, and their publication dates differ by a few months. The parts are paid documents. This page summarises the ideas in our own words and reproduces no table or limit. Work from the editions your contract names.
Part 2 has changed since 2020
The 2020 edition of Part 2 was amended in 2023 and again in 2025. A specification written a few years ago may cite the 2007 edition or the unamended 2020 text. If the edition in the tender and the edition on your certificate differ, raise it as a clarification before you offer.
Certification of welding manufacturers and classification levels
Part 2 is addressed to the welding manufacturer: any organisation that carries out, designs, buys in or sells on welded rail parts. It sorts welded components into classification levels according to how much their failure would matter for safety. The current edition has three levels, written CL 1 to CL 3. CL 1 is the most demanding. The 2007 edition had four, so an old specification may mention a level that no longer exists.
The level drives what the manufacturer must have in place: the welding quality system, the welding coordination staff, qualified welders and procedures, and the inspection capability. Parts with high safety relevance, such as bogie frames and car body structures, sit at the top level. Lightly loaded attachments sit lower. The standard and the customer's specification decide which level a given part needs. A supplier does not choose it.
In practice a customer asks for a certificate. A manufacturer certification body audits the works against Part 2 and issues a certificate for one site. Read the certificate as carefully as you would a contract clause.
- The site. A certificate covers the works that was audited, not the whole company.
- The classification level it reaches.
- The type of activity covered, for example production, design, or purchase and supply of welded parts.
- The scope: the welding processes, material groups and dimensions the audit covered.
- The welding coordinators named on it.
- The edition of the standard and the expiry date.
If you buy welded parts from a sub-supplier, the same questions apply to that works. A customer's specification usually says so directly.
Weld performance classes and inspection classes
Part 3 gives the designer a way to say how much each welded joint matters. Two questions are asked of every joint. How highly is it stressed, relative to what the joint can carry? That gives a stress category. What happens if it fails? That gives a safety category. The two together give the weld performance class.
Performance classes are written CP followed by a letter, from CP A at the demanding end to CP D at the other. The current edition divides some letters into numbered sub-classes, and it divided the former CP B into two, so drawings made to different editions do not use quite the same set. The highest classes are reserved for joints that can be fully inspected.
Each performance class leads to a weld inspection class, written CT 1 to CT 4. The inspection class sets the kind and extent of testing the weld receives under Part 5: how much visual examination, surface testing and volumetric testing. CT 1 asks for the most. We do not reproduce the assignment tables or the test extents here. They are in the standard, and they changed between editions.
| Item | Set by | Where a supplier finds it |
|---|---|---|
| Classification level needed for the part | Part 2 and the customer's specification | The purchase specification or the supplier quality requirements |
| Weld performance class of each joint | The designer, under Part 3 | The drawing, against the weld symbol or in the drawing notes |
| Weld inspection class | Follows from the performance class. The designer or customer may raise it | The drawing or a weld inspection plan |
| Tests actually carried out | The manufacturer, to Part 5 | Test reports and the weld inspection records in the dossier |
For a build-to-print supplier the classes arrive on the customer's drawing. A supplier with design responsibility assigns them itself and must be able to show how. Either way, a quotation that prices the welding without the performance classes in hand is priced on a guess.
The welding coordinator's role
A welding coordinator is the person a manufacturer makes responsible for welding and everything related to it. EN ISO 14731, Welding coordination: Tasks and responsibilities, describes the job in general terms. EN 15085-2 says how many coordinators a rail welding manufacturer needs, what technical knowledge they must show and how they are recognised, and it scales those demands by classification level.
- Reviews the welding requirements of an enquiry or order before the work is accepted.
- Checks that sub-suppliers who weld hold the certificate the work needs.
- Makes sure welding procedures are qualified and that welders and operators hold valid qualifications for the work they are given.
- Oversees consumables, equipment, preparation, welding and any heat treatment.
- Arranges inspection and testing to the inspection class and deals with non-conforming welds.
- Signs or releases the welding records.
The certification body assesses the coordinators during the audit, and the certificate names the responsible coordinator and the deputies. That makes the role personal. If a named coordinator leaves, expect the certification body to want to know, and check what your certification agreement says about it. A customer auditing a supplier will ask who the coordinators are and whether they are the people on the certificate.
How EN 15085 relates to ISO 3834
EN ISO 3834, Quality requirements for fusion welding of metallic materials, is the general welding quality standard used across industries. It comes in graded parts, from comprehensive to elementary quality requirements. EN 15085-2 builds on it: the welding quality system a rail manufacturer runs is an ISO 3834 system, at a grade that depends on the classification level, with rail-specific requirements added on top.
The two certificates are not interchangeable. An ISO 3834 certificate shows a welding quality system. It does not show that the rail-specific requirements of EN 15085-2 are met, and a rail customer who asks for EN 15085-2 will not normally accept it in place. Procedure and welder qualifications are a third layer again. They are made to the standards that EN 15085-4 and the contract call up, commonly the EN ISO 15614 series for procedures and EN ISO 9606 for welders. See WPS, PQR and WPQ for how those records fit together.
Fabricators who also make structural steelwork will know a similar arrangement from EN 1090, which also leans on ISO 3834. The certificates are separate. Holding one does not give you the other.
What to check in a rail tender against EN 15085
Use this list when a technical specification or a supplier quality document calls up EN 15085. It is our own checklist, not an extract from the standard.
| Check | Why it matters | Where to look |
|---|---|---|
| Which edition of each part is cited | Levels and weld classes differ between editions | The standards list and the welding clause of the specification |
| The classification level required for your scope | It must not be higher than the level on your certificate | Specification, supplier quality requirements, drawing notes |
| Whether your certificate's site, activity type and scope cover this work | A certificate for another site, process or material group does not help | Your EN 15085-2 certificate and its annex |
| Expiry date of the certificate against the delivery period | A certificate that lapses mid-contract stops deliveries | Certificate and the delivery programme |
| Named welding coordinators still in post | The certificate is tied to named people | Certificate and your organisation chart |
| Certificates of sub-suppliers who weld | The customer normally passes the requirement down the chain | Sub-supplier certificates and your purchase conditions |
| Weld performance and inspection classes on the drawings | They set the inspection workload and so the price | Customer drawings, or your own design rules if you hold design responsibility |
| Testing beyond the inspection class | Some customers add their own test extent or acceptance level | The welding and quality clauses of the specification |
| Who may carry out and sign non-destructive tests | The customer may require stated personnel qualification levels or an outside laboratory | Quality clauses and the inspection and test plan requirements |
| Welding records wanted in the dossier | Collecting them afterwards is slow and sometimes impossible | The document list and the dossier index |
| Rules for repair welding and concessions | Some customers want approval before any repair on a high-class weld | Non-conformance clauses in the supplier quality requirements |
Customer Specification Review (beta) lists the welding obligations in a specification package as separate lines, each with its clause. Document Review then checks them against your welding quality plan and the text of your certificate, with a quote from each side. Welding Qualification Review (beta) checks procedure and welder qualification records against the weld list. None of them reads a weld symbol or a class marked on a drawing, and none of them certifies anything. A list of the records to gather is on the rail welding documentation checklist template page, and the wider enquiry is covered on the rail component manufacturers page.
Try it on your own documents
Free sample: a certificate check report
Send up to 20 material certificates and the PO. Get a certificate check report.
