The short answer

Traceability requirements, for engineered equipment, say which parts, welds and tests must be linked by records to their evidence: tag to part to heat number to certificate, weld to procedure and welder, test to instrument and calibration. This guide covers manufactured equipment, not food rules or software requirements.

Key Takeaways

  • The customer's order and specification set how far traceability must go. Quality standards set the floor.
  • Four chains cover most equipment: material, welding, testing and inspection.
  • A link counts only when both records state the same identifier.
  • Check the links before the record book goes out, while the people who made the records can still fix them.

What traceability requirements are

Search for traceability requirements and you find food safety rules and software test matrices. This guide is about a third sense: product traceability for engineered equipment such as valves, pumps, vessels and skids. Here, a traceability requirement says that a finished item must be linked, through written records, to the materials it was made from, the people and procedures that made it, and the tests that accepted it.

The reason is practical. If a heat of steel is later found to be faulty, the customer must be able to find every part made from it. If a welder's qualification is questioned, they must be able to find every weld that welder made. Records that do not link cannot answer either question.

See the broken links in one record book

Bring the record book for a finished order, with the tag list and weld map if you have them. We follow each chain and show you every link that is broken or in conflict, quoted from both records.

Request a demo

Where product traceability requirements come from

Sources of traceability requirements on an equipment order (own summary)
SourceWhat it generally asks for
ISO 9001Identify outputs where needed, and where traceability is a requirement, control the unique identification and keep the records
API Specification Q1Documented control of identification and traceability through manufacture, to the extent the product specification and the customer require. See API Q1
EN 10204Defines the types of inspection document for metallic products, which sets what a material certificate declares. See EN 10204 3.1 vs 3.2
Design and construction codesMarking and material identification for pressure parts, and records of welding and examination. See ASME Section VIII
The customer's specification and purchase orderWhich parts need heat traceability, what certificate type, whether positive material identification is needed, and how records are presented

The customer's documents usually go furthest, so read them first. The standards describe what must be controlled. The order says which parts and to what depth.

The four chains of product traceability

Traceability chains in an equipment record book
ChainLinksRecords that carry the link
MaterialTag to part to heat number to material certificateAs-built bill of materials, marking record, material certificate
WeldingWeld to WPS to PQR to welderWeld map, weld log, procedure and welder qualification records
TestingTest to instrument to calibration certificateTest report, instrument register, calibration certificate
InspectionITP step to record to approvalSigned ITP, inspection reports, release note

For the first chain in depth, see the material traceability guide and heat number traceability. For the second, see weld traceability and how to check WPS, PQR and WPQ against a weld map.

Traceability documentation: what to keep

  • As-built bill of materials: each part actually fitted, with its heat, batch or serial number.
  • Material certificates, each showing the heat number marked on the part.
  • Marking or transfer records, where a heat number was moved to a cut piece.
  • A weld map and weld log: each weld number, its procedure, its welder and its date. See the weld map and weld log template.
  • NDE and heat treatment reports that name the weld or part numbers they cover.
  • Test reports that name each instrument by serial number, with the calibration certificates.
  • The signed ITP, with a record reference against every step.

An as-built bill of materials is the design bill of materials corrected to what was really used. It is the spine of traceability documentation, because every other record hangs off a line in it.

A traceability report: worked example

A traceability report lists each chain and says whether every link holds. Here is a short one for a gate valve.

Traceability report extract (illustrative)
ItemChain followedResult
Body, tag XV-2041Bill of materials heat 48213, certificate heat 48213Complete
Bonnet, tag XV-2041Bill of materials heat 51877, certificate heat 51787Conflict: digits differ, needs a person to check
Stem, tag XV-2041Bill of materials shows no heat numberBroken: no link to a certificate
Weld W-03Weld log names WPS-12 and welder 07. No qualification record for welder 07 in the bookBroken: welder record absent
Shell testReport names gauge PG-0417. Certificate expired before the test dateBroken: calibration not valid at use
ITP step 14, final inspectionITP refers to report FI-022, signed by both partiesComplete

Common traceability breaks

  • A heat number copied with two digits swapped.
  • A part replaced during assembly, with the bill of materials not updated.
  • A certificate that covers the grade but a different heat from the one on the part.
  • A weld on the map with no entry in the weld log.
  • A test report that names an instrument by type and not by serial number.
  • An ITP step signed off with no record reference beside it.

How OdysseyGPT checks traceability requirements in a record book

MRB Traceability Verification (beta) checks the links between the records in your manufacturing record book. You upload the record book. You can add the tag list, the weld map and the ITP. It follows four chains: tag to part to heat to certificate, weld to WPS, PQR and welder, test to instrument to calibration, and ITP step to record to approval.

  • Each traceability chain the record book should hold, with its links.
  • Every broken, conflicting or ambiguous link, with the records on both sides.
  • A quote from each record behind a finding.
  • A CSV or JSON export for your MRB close-out.

A link counts only when the records state it. A number that looks like a typing slip is reported for a person to check. Your quality engineers decide each finding. To check material links earlier, at goods-in, see the Material Traceability Check (beta), and for the tools in this area see material traceability software.

Get a traceability report for a real order

Send one assembled record book, or just its material section. On the demo you will see each chain, the links that hold and the ones that break, with the page each value was read from.

Request a demo

See it on your own documents

Find the broken chain before your customer does

Choose a record book that is about to be sent. We run the four chains on it during the call and give you the list of links to repair.

Request a demo

Frequently asked questions

What is traceability in quality control?

Traceability in quality control is the ability to follow a product back through its records: which materials it was made from, which procedures and people made it, and which inspections and tests accepted it. For engineered equipment that means linking each tagged item to heat numbers, certificates, welds, welders, test instruments and signed inspection steps.

What is product traceability?

Product traceability is the recorded link between a finished product and its history. On an equipment order it is shown by the as-built bill of materials, material certificates, weld records and test reports, each carrying an identifier that matches the next record. The customer's specification says which parts need it and to what depth.

What is FSMA 204, and does it apply to equipment manufacturers?

FSMA 204 is the United States food traceability rule. It requires extra record keeping for foods on the FDA's Food Traceability List. It applies to businesses that handle those foods, not to makers of valves, pumps or vessels. Equipment traceability requirements come from the customer's specification, quality standards such as ISO 9001 and the design code.

How do you ensure traceability from requirements to test cases?

In software, a traceability matrix links each requirement to the test cases that prove it. Equipment orders use the same idea. Each specification requirement maps to a step in the inspection and test plan, each step names the record that proves it, and each record is signed. A requirement with no step, or a step with no record, is a gap.

What is an as-built bill of materials?

An as-built bill of materials lists the parts actually fitted to the finished equipment, with the heat, batch or serial number of each. It starts as the design bill of materials and is corrected for substitutions and replacements made during manufacture. It is the starting point for material traceability, because each line leads to a certificate.

What should a traceability report show?

A traceability report should list each item or weld, the chain of records followed, the identifier found in each record, and a result: complete, broken or in conflict. It should point to the page each value came from, so a reviewer can confirm it. A report that only says traceability was checked gives the customer nothing to verify.

References

ISO 9001:2015 Quality management systems. Requirements

ISO

Visit source

API Specification Q1: Quality management system requirements for manufacturing organizations

American Petroleum Institute

EN 10204:2004 Metallic products. Types of inspection documents

CEN

ASME Boiler and Pressure Vessel Code, Section VIII: Rules for Construction of Pressure Vessels

ASME

Related Pages