Download the first article inspection report checklist
XLSX
First article inspection report checklist (Excel)
Header block, 7 columns, a result drop-down, Fail rows in red and Query rows in amber, frozen header row, filters and a How to use sheet.
CSV
First article inspection report checklist (CSV)
The example rows as plain CSV (UTF-8), for Google Sheets or any other tool.
Both files are free under CC BY 4.0, with no form to fill in. The XLSX opens in Excel, Google Sheets, LibreOffice and Numbers. The CSV carries the table only; the header block is in the XLSX.
A second read before the report is submitted
A first article inspection report shows that the first part off a new or changed production process meets every requirement on the drawing. Aerospace customers usually ask for it under AS9102 or its European counterpart EN 9102, and they send it back for reasons that have little to do with the part: a drawing revision that does not match the order, a characteristic with no line, a result written as accepted where a value was wanted. This checklist is the supplier's own read-through, done by someone other than the inspector who filled the report in.
- Quality engineers at machine shops, sheet metal shops and treatment houses, before a report is uploaded to the customer's portal.
- Quality managers, who sign the report and want the open points on one page.
- Supplier quality engineers at the customer, as a first sort of incoming reports.
The template is not the report. It does not contain the standard's forms or their fields, so prepare the report itself in the format your customer and the standard require. When a full inspection is needed and when a partial one will do is also set by the standard and the customer's own requirements. Check the governing standard or contract. See also aerospace component manufacturers.
Header block
| Field | Example |
|---|---|
| Customer | Example Aerostructures Ltd (fictional) |
| Purchase order | PO-EX-9204 line 1 (fictional) |
| Part number and name | EX-74-1183 hinge bracket (fictional) |
| Part revision and drawing revision on the PO | Part Rev C; drawing DRG-EX-74-1183 Rev C |
| First article requirement named in the order | As stated in the PO (for example AS9102 or EN 9102), at the revision the PO names |
| First article inspection report | FAIR-EX-9204-01 Rev 0 |
| Full or partial | Full: first production run of a new part |
| Checklist no. | FAC-EX-9204-01 |
| Date | 2027-02-16 |
| Prepared by | Quality engineer |
| Checked by | Quality manager |
Example checks: a machined hinge bracket
| Item | Part of the report | What to confirm | What the order and drawing require | What the report shows | Result | Action before submission |
|---|---|---|---|---|---|---|
| 1 | Identification | Part number, part name and serial or lot number on the report are those of the purchase order line | PO-EX-9204 line 1: EX-74-1183 hinge bracket | EX-74-1183 hinge bracket; serial EX-0001 | OK | |
| 2 | Identification | The part revision and the drawing revision on the report agree with the purchase order | PO-EX-9204 line 1: part Rev C; drawing DRG-EX-74-1183 Rev C | Part Rev C; drawing Rev B | Fail | The report cites a superseded drawing. Compare Rev B with Rev C, re-inspect every characteristic that changed and reissue the report. |
| 3 | Reason | The report says whether it is a full or a partial first article inspection, and why. A partial report names the earlier report it builds on | Customer quality requirements CQR-EX-02 section 4 | Full; reason given as first production run | OK | |
| 4 | Characteristics | Every characteristic on the drawing has a number on the marked-up drawing and a line in the report with the same number | Marked-up drawing BD-EX-74-1183 Rev C: 86 numbered characteristics (invented count) | 84 lines; numbers 41 and 42 have no line | Fail | Two characteristics were not inspected or not recorded. Inspect them and add the lines. |
| 5 | Characteristics | Drawing notes, and the specifications those notes call up, are accounted for one by one | Drawing general notes 1 to 9 | Notes 1 to 8 listed; note 9 (part marking) is not | Query | Add note 9 with the marking check and its result. |
| 6 | Results | Results are written as measured values wherever the customer asks for values, and not only as accepted or rejected | CQR-EX-02 section 4: measured values for dimensional characteristics | Characteristics 12 to 15 show Accept with no value | Query | Enter the measured values from the inspection record, or measure again. |
| 7 | Results | Each result is inside the drawing tolerance and is given in the drawing's units | Tolerances as drawing DRG-EX-74-1183 Rev C | All recorded values inside tolerance except characteristic 57 (see item 13) | OK | |
| 8 | Measuring equipment | The measuring equipment used for each characteristic is identified, by type and by its own ID | CQR-EX-02 section 4; calibration procedure QP-EX-11 | Equipment type given on every line; ID missing on six lines | Query | Add the six IDs from the inspection record. |
| 9 | Measuring equipment | Each instrument named was in calibration on the inspection date | QP-EX-11; inspection dates 2027-02-08 to 2027-02-10 | Calibration register checked for the IDs given; all valid | OK | Check the six missing IDs when item 8 is closed. |
| 10 | Materials and processes | Material certificates are referenced by number and attached, and the material and heat agree with the drawing | Material specification as the drawing's material note; certificate type as PO clause 7 | Certificate MC-EX-5521 referenced and attached; heat EX-H-7703 | OK | |
| 11 | Materials and processes | Each special process the drawing calls for has a certificate referenced and attached, from a source the customer accepts where the order asks for that | Drawing notes 4 and 6: surface treatment and penetrant inspection; PO clause 8 on process sources | Surface treatment certificate attached; penetrant inspection certificate referenced but not attached | Query | Attach the penetrant inspection certificate and confirm the processor is one the customer accepts. |
| 12 | Tests | Functional tests the drawing or the order requires are referenced, with the test report number | None called for on the drawing or the PO | No entry | Not applicable | |
| 13 | Nonconformances | Any characteristic outside tolerance carries a nonconformance number and its disposition | CQR-EX-02 section 6: customer approval for any use-as-is disposition | Characteristic 57 out of tolerance; NCR-EX-0311 referenced; disposition awaits the customer | Query | Do not submit the report as complete until the customer has answered NCR-EX-0311. |
| 14 | Bought-in parts | Detail parts and assemblies bought from sub-tier suppliers have their own first article reports referenced, where the order passes the requirement down | PO clause 5: requirement applies to sub-tier suppliers | Bush EX-74-1190: supplier report FAIR-EX-S-0087 referenced | OK | |
| 15 | Sign-off | The report carries the names, signatures and dates of the person who prepared it and the person who approved it, and customer acceptance where the order asks for it | CQR-EX-02 section 4 | Prepared and approved, both signed and dated | OK | Reissue at Rev 1 after items 2 to 13 are closed, and sign again. |
The count of 86 characteristics is made up, as are the part, the customer requirements document CQR-EX-02 and every certificate number. The example fails the report on its drawing revision and on two characteristics with no line. Every example value is invented: the project, customer, bidders, purchase order, prices and every document, certificate, serial and report number do not exist. Standards are named but not quoted.
Columns and what to write
| Column | What to write |
|---|---|
| Item | Running number. |
| Part of the report | Identification, Reason, Characteristics, Results, Measuring equipment, Materials and processes, Tests, Nonconformances, Bought-in parts or Sign-off. |
| What to confirm | The point to confirm on the first article inspection report before it goes to the customer. |
| What the order and drawing require | The purchase order line, drawing, note or customer requirement the check is made against, with its number and revision. |
| What the report shows | What the report actually says or leaves out, as written. |
| Result | OK, Query, Fail or Not applicable (drop-down). Fail rows turn red; Query rows amber. |
| Action before submission | What has to be corrected, added or asked before the report is sent. |
How to review a report with it
- Fill in the header block from the purchase order: part number, part revision, drawing revision and the first article requirement the order names, with its revision.
- Start with identification. Lay the report beside the purchase order line and compare the part number, the part revision and the drawing revision character by character.
- Count the numbered characteristics on the marked-up drawing and the lines in the report. Every number needs a line, and every drawing note needs an entry.
- Read down the results. Where the customer asks for measured values, a line that only says accepted is not finished.
- Check that each line names the measuring equipment by ID, and that each ID was in calibration on the day it was used.
- Follow every reference out of the report: material certificates, special process certificates, functional test reports and sub-tier first article reports. A reference with nothing attached is a Query.
- For any result outside tolerance, find the nonconformance number and its disposition.
- Set the result for each row. Fail rows turn red and Query rows amber. Close them, reissue the report and then send it.
Reading the report against the order and its attachments
Most of the work in this review is cross-reading: a revision letter in three documents, a heat number on a certificate, a gauge ID against a calibration register. OdysseyGPT's Document Review reads the purchase order, the customer's quality requirements and your report package together and lists where they disagree, with the page on each side. In the Inspection & Testing module, Calibration Validity Check (beta) compares calibration dates with inspection dates, and Material Certificate Review (beta) sets each material certificate beside what the order asks for. Your quality engineer decides what each finding means. Tools marked beta are open on request, and we onboard each team ourselves.
Want us to run the check for you?
Send your ITP and the customer's quality requirements. We send back what is covered, what is missing and what still needs evidence before the FAT.