First article inspection report checklist: review an FAI report before the customer does (Excel and CSV)

For aerospace machine shops and component makers: fifteen checks on a first article inspection report, each set against the purchase order and the drawing.

By Ademola Afolabi, Founder, New Odyssey Ltd · Last reviewed:

The short answer

A first article inspection report checklist is a review of the finished report against the purchase order and drawing before submission. This free Excel template has one row per check: part and drawing revision, every characteristic and note accounted for, measured values, measuring equipment, material and special process certificates, nonconformances, the full or partial reason and signatures.

Key Takeaways

  • Compare the drawing revision on the report with the purchase order before anything else. A report made to an old revision fails however good the measurements are.
  • Count the numbered characteristics on the marked-up drawing and the lines in the report. The two counts should be equal.
  • A certificate that is referenced and not attached is an open point.
  • The example has 15 checks on an invented hinge bracket report (FAIR-EX-9204-01), with two fails and five queries.

Download the first article inspection report checklist

Both files are free under CC BY 4.0, with no form to fill in. The XLSX opens in Excel, Google Sheets, LibreOffice and Numbers. The CSV carries the table only; the header block is in the XLSX.

A second read before the report is submitted

A first article inspection report shows that the first part off a new or changed production process meets every requirement on the drawing. Aerospace customers usually ask for it under AS9102 or its European counterpart EN 9102, and they send it back for reasons that have little to do with the part: a drawing revision that does not match the order, a characteristic with no line, a result written as accepted where a value was wanted. This checklist is the supplier's own read-through, done by someone other than the inspector who filled the report in.

  • Quality engineers at machine shops, sheet metal shops and treatment houses, before a report is uploaded to the customer's portal.
  • Quality managers, who sign the report and want the open points on one page.
  • Supplier quality engineers at the customer, as a first sort of incoming reports.

The template is not the report. It does not contain the standard's forms or their fields, so prepare the report itself in the format your customer and the standard require. When a full inspection is needed and when a partial one will do is also set by the standard and the customer's own requirements. Check the governing standard or contract. See also aerospace component manufacturers.

Header block

Header block fields, with the invented example values
FieldExample
CustomerExample Aerostructures Ltd (fictional)
Purchase orderPO-EX-9204 line 1 (fictional)
Part number and nameEX-74-1183 hinge bracket (fictional)
Part revision and drawing revision on the POPart Rev C; drawing DRG-EX-74-1183 Rev C
First article requirement named in the orderAs stated in the PO (for example AS9102 or EN 9102), at the revision the PO names
First article inspection reportFAIR-EX-9204-01 Rev 0
Full or partialFull: first production run of a new part
Checklist no.FAC-EX-9204-01
Date2027-02-16
Prepared byQuality engineer
Checked byQuality manager

Example checks: a machined hinge bracket

Invented example checks on report FAIR-EX-9204-01
ItemPart of the reportWhat to confirmWhat the order and drawing requireWhat the report showsResultAction before submission
1IdentificationPart number, part name and serial or lot number on the report are those of the purchase order linePO-EX-9204 line 1: EX-74-1183 hinge bracketEX-74-1183 hinge bracket; serial EX-0001OK
2IdentificationThe part revision and the drawing revision on the report agree with the purchase orderPO-EX-9204 line 1: part Rev C; drawing DRG-EX-74-1183 Rev CPart Rev C; drawing Rev BFailThe report cites a superseded drawing. Compare Rev B with Rev C, re-inspect every characteristic that changed and reissue the report.
3ReasonThe report says whether it is a full or a partial first article inspection, and why. A partial report names the earlier report it builds onCustomer quality requirements CQR-EX-02 section 4Full; reason given as first production runOK
4CharacteristicsEvery characteristic on the drawing has a number on the marked-up drawing and a line in the report with the same numberMarked-up drawing BD-EX-74-1183 Rev C: 86 numbered characteristics (invented count)84 lines; numbers 41 and 42 have no lineFailTwo characteristics were not inspected or not recorded. Inspect them and add the lines.
5CharacteristicsDrawing notes, and the specifications those notes call up, are accounted for one by oneDrawing general notes 1 to 9Notes 1 to 8 listed; note 9 (part marking) is notQueryAdd note 9 with the marking check and its result.
6ResultsResults are written as measured values wherever the customer asks for values, and not only as accepted or rejectedCQR-EX-02 section 4: measured values for dimensional characteristicsCharacteristics 12 to 15 show Accept with no valueQueryEnter the measured values from the inspection record, or measure again.
7ResultsEach result is inside the drawing tolerance and is given in the drawing's unitsTolerances as drawing DRG-EX-74-1183 Rev CAll recorded values inside tolerance except characteristic 57 (see item 13)OK
8Measuring equipmentThe measuring equipment used for each characteristic is identified, by type and by its own IDCQR-EX-02 section 4; calibration procedure QP-EX-11Equipment type given on every line; ID missing on six linesQueryAdd the six IDs from the inspection record.
9Measuring equipmentEach instrument named was in calibration on the inspection dateQP-EX-11; inspection dates 2027-02-08 to 2027-02-10Calibration register checked for the IDs given; all validOKCheck the six missing IDs when item 8 is closed.
10Materials and processesMaterial certificates are referenced by number and attached, and the material and heat agree with the drawingMaterial specification as the drawing's material note; certificate type as PO clause 7Certificate MC-EX-5521 referenced and attached; heat EX-H-7703OK
11Materials and processesEach special process the drawing calls for has a certificate referenced and attached, from a source the customer accepts where the order asks for thatDrawing notes 4 and 6: surface treatment and penetrant inspection; PO clause 8 on process sourcesSurface treatment certificate attached; penetrant inspection certificate referenced but not attachedQueryAttach the penetrant inspection certificate and confirm the processor is one the customer accepts.
12TestsFunctional tests the drawing or the order requires are referenced, with the test report numberNone called for on the drawing or the PONo entryNot applicable
13NonconformancesAny characteristic outside tolerance carries a nonconformance number and its dispositionCQR-EX-02 section 6: customer approval for any use-as-is dispositionCharacteristic 57 out of tolerance; NCR-EX-0311 referenced; disposition awaits the customerQueryDo not submit the report as complete until the customer has answered NCR-EX-0311.
14Bought-in partsDetail parts and assemblies bought from sub-tier suppliers have their own first article reports referenced, where the order passes the requirement downPO clause 5: requirement applies to sub-tier suppliersBush EX-74-1190: supplier report FAIR-EX-S-0087 referencedOK
15Sign-offThe report carries the names, signatures and dates of the person who prepared it and the person who approved it, and customer acceptance where the order asks for itCQR-EX-02 section 4Prepared and approved, both signed and datedOKReissue at Rev 1 after items 2 to 13 are closed, and sign again.

The count of 86 characteristics is made up, as are the part, the customer requirements document CQR-EX-02 and every certificate number. The example fails the report on its drawing revision and on two characteristics with no line. Every example value is invented: the project, customer, bidders, purchase order, prices and every document, certificate, serial and report number do not exist. Standards are named but not quoted.

Columns and what to write

ColumnWhat to write
ItemRunning number.
Part of the reportIdentification, Reason, Characteristics, Results, Measuring equipment, Materials and processes, Tests, Nonconformances, Bought-in parts or Sign-off.
What to confirmThe point to confirm on the first article inspection report before it goes to the customer.
What the order and drawing requireThe purchase order line, drawing, note or customer requirement the check is made against, with its number and revision.
What the report showsWhat the report actually says or leaves out, as written.
ResultOK, Query, Fail or Not applicable (drop-down). Fail rows turn red; Query rows amber.
Action before submissionWhat has to be corrected, added or asked before the report is sent.

How to review a report with it

  1. Fill in the header block from the purchase order: part number, part revision, drawing revision and the first article requirement the order names, with its revision.
  2. Start with identification. Lay the report beside the purchase order line and compare the part number, the part revision and the drawing revision character by character.
  3. Count the numbered characteristics on the marked-up drawing and the lines in the report. Every number needs a line, and every drawing note needs an entry.
  4. Read down the results. Where the customer asks for measured values, a line that only says accepted is not finished.
  5. Check that each line names the measuring equipment by ID, and that each ID was in calibration on the day it was used.
  6. Follow every reference out of the report: material certificates, special process certificates, functional test reports and sub-tier first article reports. A reference with nothing attached is a Query.
  7. For any result outside tolerance, find the nonconformance number and its disposition.
  8. Set the result for each row. Fail rows turn red and Query rows amber. Close them, reissue the report and then send it.

Reading the report against the order and its attachments

Most of the work in this review is cross-reading: a revision letter in three documents, a heat number on a certificate, a gauge ID against a calibration register. OdysseyGPT's Document Review reads the purchase order, the customer's quality requirements and your report package together and lists where they disagree, with the page on each side. In the Inspection & Testing module, Calibration Validity Check (beta) compares calibration dates with inspection dates, and Material Certificate Review (beta) sets each material certificate beside what the order asks for. Your quality engineer decides what each finding means. Tools marked beta are open on request, and we onboard each team ourselves.

Want us to run the check for you?

Send your ITP and the customer's quality requirements. We send back what is covered, what is missing and what still needs evidence before the FAT.

Get the free ITP and FAT readiness check

New templates by email (optional)

Your download does not depend on this.

We use your email only for this. See our privacy policy.

Frequently asked questions

What is a first article inspection report?

A record that one of the first parts from a production run was inspected against every requirement of its drawing, with the results, the equipment used and the supporting certificates. It is evidence that the production process can make the part correctly.

What should I check on an FAI report before sending it?

That the part and drawing revisions agree with the purchase order, that every characteristic and note has an entry, that results are values where values are asked for, that equipment and certificates are identified and attached, and that any nonconformance has a disposition.

Does this template replace the AS9102 forms?

No. It is a review checklist written in our own words and does not reproduce the standard's forms. Fill in the report in the format the standard and your customer require, then use the checklist to review it.

When is a partial first article inspection enough?

The standard and the customer's requirements say when a change calls for a full inspection and when only the affected characteristics need re-inspecting. The rules differ between customers. Check the governing standard or contract.

Who should do the review?

Someone who did not prepare the report, typically a second quality engineer or the quality manager who will sign it. A fresh reader is more likely to notice a missing line or a superseded revision.