What a deviation report is in manufacturing
A deviation report is a short, numbered record that says one thing clearly: here is what the drawing, specification or procedure required, here is what we have or propose instead, and here is the decision we need. On an equipment order the reader is usually the customer's engineer. The report gives them enough to accept, reject or ask a question.
A quality deviation means the product, the process or a document differs from an agreed requirement. A simple example: the specification asks for a 30 minute hydrostatic test hold, and the test record shows 15 minutes. The part may be sound, but the record does not show what the order asked for, so it must be reported and settled.
Search results for this term lean towards pharmaceutical quality systems, where a deviation is a departure from a validated process. The form looks similar, but the reader, the rules and the follow-up differ. Everything below is written for makers of valves, pumps, vessels, skids and fabricated steel working to a customer's order.
Find the deviations before you write the reports
Bring one tender: the customer's specification and the offer you sent. We run them in the demo and show you each deviation with the clause and your wording side by side.
Deviation report, deviation request, concession and NCR
Companies use these names loosely. Check the definitions in your customer's quality requirements before you pick a form. The usual split is by timing: before the work is done, or after.
| Record | When it is raised | What it asks for |
|---|---|---|
| Deviation in the offer | At tender, before the order | Acceptance of an alternative to a clause, listed in the technical deviation list |
| Deviation request | After the order, before the work is done | Permission to depart from a requirement for a stated quantity or period |
| Nonconformance report (NCR) | After the work, when a part or record is found wrong | A disposition: rework, repair, use as is or scrap |
| Concession request | After the work, when you want to use the item as it is | The customer's permission to release an item that differs from the requirement |
Many customers use one form, often called a deviation report, for all of the cases after the order. The guide to deviation requests and concession requests covers the difference in more detail.
Deviation report template: the fields to include
Whatever deviation report form your customer supplies, it will ask for the fields below. If you have no form, copy this table into a spreadsheet or a one-page document and use it as your deviation report format.
| Field | What to write | Common mistake |
|---|---|---|
| Report number and date | A unique number, the revision of the report and the date raised | Reusing a number after a resubmission |
| Order and item | Customer, purchase order, item or tag number, quantity affected, serial or heat numbers | Saying "all items" when only some are affected |
| Requirement | The document number, revision and clause or drawing note, quoted exactly | Paraphrasing the clause |
| Actual or proposed condition | What was measured or what you propose, with units | Mixing units with the requirement |
| Reason | Why the requirement was not or cannot be met | Leaving it blank or writing "supplier standard" |
| Technical justification | Why the item is still fit for the service: calculation, test result or standard | An opinion with no evidence attached |
| Effect on price, delivery and documents | Any change to cost, schedule, certificates or the record book | Leaving out the documents that must be revised |
| Decision requested | Accept, accept with conditions or reject, and the date you need the reply | No date, so the reply drifts |
| Customer decision | The reply, the name and the date, with any conditions | Recording a verbal reply only |
| Closure | Evidence that the conditions were met, and where the report is filed | Leaving the report open at handover |
A deviation report example
This example is made up, but it shows the level of detail that gets a fast reply. It concerns a batch of gate valves.
- Requirement: customer valve specification, revision C, testing section. It asks for the shell hydrostatic test to be held for 30 minutes on every valve.
- Actual condition: test records for 6 of 24 valves, listed by serial number, show a hold of 15 minutes. The works test procedure followed the product standard instead of the customer specification.
- Reason: the test procedure was approved before revision C of the specification was issued.
- Proposed action: retest the 6 valves for 30 minutes, witnessed by the customer's inspector, and revise the test procedure.
- Effect: no change to price. Two working days added to the inspection date. Six test records and one procedure to be reissued.
- Decision requested: accept the proposed retest, reply needed within five working days.
Notice what the reader does not have to do: open the specification, work out which valves are affected or guess what you want from them.
Checklist before you send a deviation report
- The requirement is quoted exactly and names the document revision in the order.
- The affected items are listed by tag, serial or heat number.
- The values use the same units as the requirement.
- The justification has evidence attached, not only a statement.
- The effect on price, delivery and documents is stated, even if it is "none".
- One decision is asked for, with a date.
- The report is logged in your deviation register with its status.
- Any earlier deviation on the same clause is referenced, so the customer sees the history.
How OdysseyGPT finds the deviations to report
The hardest part of deviation reporting is finding every deviation in the first place. OdysseyGPT's Deviation Register (beta) reads the customer's requirements together with your proposal, your technical offer and your clarification replies. It reads PDF, Word, Excel and CSV files.
- What goes in: the customer's requirements, plus your proposal, technical offer, clarification replies and any register you already keep.
- What comes out: one line per deviation, with the requirement, your position and a quote from each source.
- Declared deviations, undeclared ones where your own documents disagree, and deviations raised in a clarification reply are each shown.
- Each line records the technical, commercial and documentation consequence, a risk level and a review state.
- True duplicates are merged, and new findings are matched against your existing register.
- The register exports as CSV or JSON, ready to turn into the reports you send.
Your engineers decide what to do with every line: offer it, withdraw it or negotiate it. The customer decides whether to accept it.
See your own deviations listed with their sources
Send us a specification and the technical offer that answered it. In the demo you will see the register built from them, including any point where two of your documents say different things.
Where the deviation report goes next
A deviation report is only finished when the customer's decision is recorded and the conditions are met. Three places need to stay in step:
- The deviation register, which holds the status of every report on the order.
- The purchase order, which should name the deviations the customer accepted. See purchase order vs quotation review.
- The manufacturing record book, where accepted deviations and concessions are usually filed as their own section.
If you are comparing tools for this job, see deviation management software.
See it on your own documents
Bring a tender you have already answered
We run the customer's requirements against your offer and clarifications, and you compare the deviations we find with the list your team wrote by hand.
