Glossary term
End Item Data Package
The set of quality and configuration records delivered with a finished aerospace, space or defence item. It shows what was built, from what, by which processes and with what test results.
Last reviewed by the OdysseyGPT team
What it is
An end item data package is the set of records delivered with a finished aerospace, space or defence item. The contract sets its contents. For a component it usually holds the certificate of conformance, a first article inspection report where due, material and special process certificates, test reports and any concession approvals, filed to the customer's index.
Key Takeaways
- The contract or quality clauses set the contents. There is no universal list.
- Components need certificates and reports. Assemblies add configuration and non-conformance records.
- Customers check the package before the part. A missing record holds the delivery.
- Build the index at order acceptance, not at shipment.
Why it matters
An end item data package, often shortened to EIDP, is the collection of records a supplier hands over with a deliverable item. The term is common in space and defence contracts. In build-to-print machining the same thing is often just called the data package or the cert pack. The contract or the purchase order quality clauses set the contents, and there is no single standard list. For a machined or fabricated component the usual contents are a certificate of conformance, the first article inspection report where one is due, material certificates with traceability to the heat or lot, special process certificates, non-destructive testing and functional test reports, and the approvals for any deviation or concession. For a higher-level assembly the package grows. It may add an as-built configuration list set against the as-designed list, serial number records, a log of non-conformances and their dispositions, and lists of open items or limited-life items. Most customers want an index, a fixed order and a named format, and many want the package uploaded and accepted before the parts ship. Receiving inspection checks the package before it checks the part, so a missing certificate holds a delivery just as a dimensional reject does. The package is close kin to the manufacturing record book used in process equipment. Both are an index set by the customer and a body of evidence filed against it.
How OdysseyGPT uses it
MRB Readiness Check (beta) reads the customer's data package requirements or index and your document folder, and gives each required document a status: present, missing, awaiting approval or at the wrong revision. MRB Compiler (beta) maps approved records to the index. Material Certificate Review (beta) checks the material certificates in the package. OdysseyGPT reads documents only. It does not measure parts or create first article forms, and engineers decide.
Evaluation questions
How do you check a data package before shipment?
List what the order and its quality clauses require, then go through the folder line by line. Check each record is present, signed, at the right revision, and tied to the part by part number, serial or lot number and heat number.
Frequently asked questions
What is in an end item data package?
Whatever the contract lists. For a component it is usually a certificate of conformance, a first article inspection report where due, material and special process certificates, test reports and any concession approvals.
Is an end item data package the same as a manufacturing record book?
They do the same job in different sectors. Both are the delivery records for an item, filed to an index the customer sets. The contents and the names of the documents differ.
When is the data package due?
The order says. Many customers want it with the shipment, and some want it submitted and accepted before the parts leave.
References
AS9102C: Aerospace Series. First Article Inspection Requirements
SAE International
Paid standard. Publisher's listing used for the title, revision and date. No form content is reproduced.
AS9100D: Quality Management Systems. Requirements for Aviation, Space, and Defense Organizations
SAE International
Paid standard. Publisher's page used for the title and scope. Use the revision your contract names.
