What is a contract review checklist?
A contract review checklist is a fixed list of questions answered before a company commits to an order. This guide uses the manufacturing and ISO 9001 sense: the review of the customer's requirements before acceptance. Lawyers use the same phrase for checking the legal terms of an agreement. If that is your job, this is the wrong checklist, and your counsel will have their own.
For a maker of valves, pumps, vessels or skids, the contract is the purchase order plus everything it refers to: specifications, datasheets, standards, inspection requirements and document lists. The checklist makes sure each of those has been read by the right person and that nothing in them is a surprise after the order is booked.
Have the order's requirements listed before your review meeting
Bring the specification package from one recent order. We turn it into a requirements register with each clause quoted, so your contract review starts from a full list and not from a pile of PDFs.
Contract review in ISO 9001: what the standard asks for
ISO 9001:2015 does not use the words contract review in its heading. It calls the activity the review of the requirements for products and services. Older editions and many procedures still say contract review, and auditors understand both. In plain words, the standard asks you to do the following before you commit to supply:
- Review the requirements the customer stated, including delivery and what happens after delivery.
- Review requirements the customer did not state but that the product needs for its known use.
- Review the requirements your own organisation sets.
- Review the legal and regulatory requirements that apply to the product.
- Resolve any difference between the order and what was said earlier, such as in the quotation.
- Confirm the requirements with the customer when they were not given in writing.
- Keep a record of the review and of any new requirements.
- When requirements change, update the documents and tell the people affected.
Sector standards build on this. API Q1, for example, sets its own contract review requirements for oil and gas manufacturers.
The contract review checklist
| No. | Check | Evidence to look at | Owner |
|---|---|---|---|
| 1 | All documents named in the order have been received, at the stated revision. | Purchase order, document list | Order desk |
| 2 | The order matches the quotation in scope, quantity, price basis and delivery. | Purchase order against quotation | Sales |
| 3 | Every technical requirement is identified and can be met. | Specification, datasheets, standards | Engineering |
| 4 | Deviations agreed at bid stage are written into the order. | Deviation list, order text | Engineering |
| 5 | Material requirements and certificate types are clear. | Material clauses, certificate requirements | Quality |
| 6 | Welding, NDE and heat treatment requirements are covered by current qualifications. | Specification, procedure register | Quality |
| 7 | Inspections, tests, hold points and witness points are identified. | Inspection and test requirements | Quality |
| 8 | Document deliverables and their due dates are listed. | Vendor data requirements | Document control |
| 9 | Painting, preservation, packing and marking requirements are identified. | Specification, packing clauses | Production |
| 10 | Delivery date is achievable with current capacity and lead times. | Production plan, supplier lead times | Planning |
| 11 | Legal and regulatory requirements for the destination are identified. | Order, applicable directives and codes | Engineering |
| 12 | Unclear, conflicting or missing requirements are sent to the customer. | Clarification log | Project manager |
| 13 | The review is recorded, signed and dated, with actions assigned. | Contract review record | Quality |
Adjust the owners to your own organisation. For the order-stage version with acknowledgement wording, see the order acknowledgement checklist template.
How to conduct a contract review
A contract review procedure for an equipment manufacturer usually has these steps:
- Log the order and collect every document it names.
- Compare the purchase order with your last quotation and list the differences. See purchase order vs quotation review.
- Extract the requirements from the specification package into one list.
- Send each group of requirements to its owner: engineering, quality, production, planning and document control.
- Hold the review. Each owner confirms the requirements can be met or raises an issue.
- Send open points to the customer as clarifications or deviation requests.
- Accept the order, or accept it with the agreed exceptions written down.
- File the signed record and hand the requirements list to the project team.
Step three is where most of the hours go. A specification may run to hundreds of pages and call up other specifications in turn. The guide to analysing a tender specification covers the reading method.
Contract review procedure: records and changes
An auditor will ask for two things: evidence that the review took place before acceptance, and evidence of what was done about any problem it found. A good record shows the order number, the documents and revisions reviewed, who took part, the issues raised and how each was closed.
Orders change. When the customer issues a revised specification or a change order, repeat the review for the changed parts, update your own documents and tell the people who are working to the old version. Record the change the same way as the first review.
Legal questions belong to legal review
Questions such as the essential elements of a contract or the rules for interpreting one are legal questions. They sit outside the quality system's contract review. Ask your legal adviser to review the terms and conditions alongside the technical review described here.
How OdysseyGPT does this check
Customer Specification Review (beta) does the reading in step three. You upload the customer's specification, any supporting specifications and the standards it refers to. You can also add your internal baseline specification.
- Every requirement on its own line, with the source clause quoted.
- Lines grouped as technical, quality, documentation, tests and inspections, or commercial, ready to send to each owner.
- Ambiguous requirements and missing information, such as TBA or HOLD items, flagged for clarification.
- Optional differences from your internal standard.
- A CSV or JSON export to attach to the contract review record.
Checks 3, 5, 6, 7, 8, 9 and 12 in the checklist then start from a complete list. Your engineers review each line and decide what it means for the order.
See checklist items 3 to 9 answered from the documents
Send us one order's specification and its attachments. On the call you will see the register grouped by owner, the clause behind each line and the unclear items to raise with the customer.
See it on your own documents
Run your next contract review from a cited register
Bring an order you are about to accept, or one that went wrong. We read the package with you and show what a full requirements list looks like before sign-off.