Download the RFQ template
XLSX
RFQ template (Excel)
Header block, 15 columns, a compliance drop-down with colour-coded rows, frozen header row, filters and a How to use sheet.
CSV
RFQ template (CSV)
The example rows as plain CSV (UTF-8), for Google Sheets or any other tool.
Free under CC BY 4.0, with no form to fill in. The CSV carries the table only; the header block is in the XLSX.
What it is for and who uses it
Buyers at EPC contractors and end users send an RFQ with the material requisition, datasheets, specifications and the vendor data requirements list. Suppliers return a technical offer and a commercial offer. This template is the line-item sheet that travels with the package.
- Procurement and project engineers who issue the RFQ and later evaluate the offers.
- Valve, pump, actuator and instrument makers who answer it, line by line, with a compliance status for each.
Header block
| Field | Example |
|---|---|
| Project | Example Gas Compression Station, Phase 2 (fictional) |
| Buyer | Example EPC Contractor Ltd (fictional) |
| RFQ no. | RFQ-EX-3105 (fictional) |
| Revision | 0 |
| Issue date | 2026-09-01 |
| Closing date for quotations | 2026-09-29 |
| Material requisition | MR-VAL-001 Rev 1 |
| Governing specification | PS-VAL-001 Rev 2 |
| Delivery terms (Incoterms) and place | FCA supplier works |
| Currency | USD |
| Quotation validity required | 90 days |
| Technical and commercial offers | Separate: technical offer unpriced, commercial offer priced |
| Buyer contact | Procurement lead (fictional) |
Example rows: valve package RFQ-EX-3105
| Item | Tag(s) | Qty | Description | Datasheet / spec | Documents | Required delivery | Supplier: compliance | Supplier: lead time (wk) | Remarks |
|---|---|---|---|---|---|---|---|---|---|
| 1 | XV-2101 to XV-2106 | 6 ea | Ball valve, trunnion-mounted, 6 in, ASME Class 600, RF flanged, gear operated | DS-VAL-0600 Rev B; PS-VAL-001 | A01, A02, B01, C01, E01 | 24 weeks | Deviation | 26 | Seat material offered as RPTFE; see EX-03. |
| 2 | XV-2201 to XV-2204 | 4 ea | Ball valve, floating, 2 in, ASME Class 600, RF flanged, lever operated | DS-VAL-0200 Rev A; PS-VAL-001 | A01, C01, E01 | 16 weeks | Complies | 14 | |
| 3 | HV-2301 to HV-2302 | 2 ea | Gate valve, 8 in, ASME Class 300, RF flanged, handwheel | DS-VAL-0800 Rev A; PS-VAL-001 | A01, A02, C01, E01 | 20 weeks | Clarification | 22 | Low-temperature impact test temperature to confirm. |
| 4 | CV-2401 | 1 ea | Check valve, dual plate, 6 in, ASME Class 600, wafer | DS-VAL-0601 Rev A; PS-VAL-001 | A01, C01, E01 | 18 weeks | Not offered | Supplier does not make dual-plate check valves. | |
| 5 | - | 1 lot | Commissioning spares | MR-VAL-001 section 6 | D02 | With valves | Complies | 26 | |
| 6 | - | 1 lot | Two-year operating spares: priced list only | MR-VAL-001 section 6 | D02 | Separate order | Complies | Not part of the order value; for the buyer's evaluation. | |
| 7 | - | 1 lot | Documentation to the VDRL, including the final data book | VDRL-VAL-001 Rev 1 | All | Per VDRL | Clarification | Supplier asks to issue the data book electronically only. |
The file also has Key materials, Inspection, Supplier: offered, Supplier: deviation ref. and Supplier: unit price columns. Line 4 shows a Not offered line and line 1 a deviation, each tied to an item in the supplier's deviation list. Every example value is invented: specification PS-VAL-001, the requisition, the datasheets and every certificate and report number do not exist. Standards such as API 6D, API 607, ISO 15848-1 and EN 10204 are named but not quoted, so check each clause against your own licensed copy.
Columns and what to write
| Column | What to write |
|---|---|
| Item | Line number. Keep it the same as the material requisition. |
| Tag(s) | Equipment tag numbers, or a range, so offers can be matched line by line. |
| Qty | Quantity and unit. |
| Description | What is being bought, in one line: type, size, rating, end connections. |
| Key materials | Body, trim and seat materials, or the material class, as the datasheet states them. |
| Datasheet / spec | The datasheet and specification clauses that govern the line. Point to them; do not copy standard text. |
| Documents required | VDRL codes that apply to this line, for example drawings, ITP, certificates, data book. |
| Inspection | Inspection level or tests the buyer will witness. |
| Required delivery | Date or weeks after order when the line is needed. |
| Supplier: offered | Supplier fills in: the model, figure number or datasheet line offered. |
| Supplier: compliance | Supplier fills in: Complies, Clarification, Deviation, Not offered or Not applicable (drop-down). |
| Supplier: deviation ref. | Supplier fills in: the item number in the deviation list, for anything not Complies. |
| Supplier: lead time | Supplier fills in: weeks from order to delivery at the stated Incoterms. |
| Supplier: unit price | Supplier fills in, in the commercial copy only. Leave blank in the unpriced technical offer. |
| Remarks | Anything either side needs to know about the line. |
Compliance status values
| Status | Meaning |
|---|---|
| Complies | The offer meets the requirement as written. Point to the datasheet line or certificate that shows it. |
| Clarification | The offer meets the intent, but a reference, method or wording differs, or the requirement is unclear or conflicts with another document. |
| Deviation | The offer does not meet the requirement as written: a different material, rating, test, certificate type or scope. |
| Not offered | The item is excluded from the scope of supply, for example spares, site services or documents you are not quoting. |
| Not applicable | The clause does not apply to the equipment offered, for example a sour-service clause on a non-sour duty. Say why in the remarks. |
How to use the template
- Fill in the header block: project, RFQ number and revision, closing date, the material requisition and governing specification, Incoterms, currency and the validity you need.
- Add one row per line on the material requisition, with tags, quantity and a one-line description. Keep the item numbers the same as the requisition.
- For each line, point to the datasheet and specification clauses that govern it, the VDRL codes that apply and the inspection you will witness. Do not paste standard text.
- Send the file with the requisition, datasheets, specifications and VDRL. Ask for an unpriced technical offer and a separate priced commercial offer.
- Suppliers fill in the Supplier columns: what they offer, a compliance status, a deviation list reference for anything not Complies, and lead time. Unit price goes in the commercial copy only.
- When offers come back, copy the supplier columns into a technical bid evaluation (TBE) matrix, one bidder per column set, and raise clarifications from the deviation references.
After the offers come back
- Buyers: copy each supplier's columns into the technical bid evaluation (TBE) template, or lay the offers side by side with a bid tabulation.
- Suppliers: before you answer, check each line against your datasheets with the compliance matrix template, and list every exception in the technical deviation list template.
- For what an RFQ package usually contains and how to read it, see how to analyse a tender specification.
Have OdysseyGPT check the RFQ package
Want OdysseyGPT to check an RFQ package against your datasheets?
OdysseyGPT reads the tender package, checks each customer requirement against your own datasheets, and drafts the compliance matrix and deviations & clarifications list, each row with a quote from the source page, sheet or cell. Your engineers decide every open item. Managed plans start from $999/month.